design by contract where agile meets formal methods
Post on 26-Mar-2015
218 Views
Preview:
TRANSCRIPT
Design by Contract
Where Agile Meets Formal Methods
• Motivation
• History
• Concept
• Integrate with Agile
• Example
• Reviews
• Current State
What is Design by Contract?
• Motivation
• History
• Concept
• Integrate with Agile
• Example
• Reviews
• Current State
What is Design by Contract?
Motivation
• Improve software quality and reliability
• Second NASA Formal Methods Symposium (April 13 – 15, 2010)– Verification and Validation of Flight-Critical Systems– An Overview of Formal Methods at Intel
– Decision Engine for Software Analysis at Microsoft.
• What are Formal Methods? “mathematically rigorous techniques and tools for
developing specification, design and verification of software and hardware systems”
-- Wikipedia
Motivation
• Agile: Are we building the right product?– making sure clients get what they want– won’t waste resources unnecessarily
• Formal: Are we building the product right?– making sure code does exactly as specified– separate process to determine right product
Motivation
• Is there a common ground?– Alloy (MIT)– Object Constraint Language (IBM)– Design by Contract (Effiel)
Motivation
• Why should the Agile community care?– Tests often insufficient to safeguard changes– Documentations are poorly-written or outdated– Collective code ownership misinterpretation
• Why should the FM community care?– Overemphasized full formalization of design– Few people understand formal notations
Motivation
What is Design by Contract?
• Motivation
• History
• Concept
• Integrate with Agile
• Example
• Reviews
• Current State
Design by Contract – History
• Bertrand Meyer developed DbC in 1986“The quality factors on which we have concentrated — reusability, extendibility, compatibility — must not be attained at the expense of reliability (correctness and robustness).”
-- Bertrand Meyer, Object Oriented Software Construction
• Correctness Assertions
• Robustness Exception Handling
What is Design by Contract?
• Motivation
• History
• Concept
• Integrate with Agile
• Example
• Reviews
• Current State
Design by Contract – Concept
Obligations Benefits
Customer
(client)
(Must ensure precondition)
Be at the Pearson airport at least 5 minutes before scheduled departure time. Bring only acceptable baggage. Pay ticket price.
(May benefit from postcondition)
Reach Chicago.
Airline
(supplier)
(Must ensure postcondition)
Bring customer to Chicago.
(May assume precondition)
No need to carry passenger who is late, has unacceptable baggage, or has not paid ticket price.
Example: a contract between an airline and a customer
Design by Contract – Concept
• Precondition: – an obligation for the client and a benefit for
the supplier
• Postcondition: – a benefit for the client and an obligation for
the supplier
Design by Contract – Concept
Before Purchase After Purchase
Airline
(supplier)
(Must ensure invariant)
Ensures plane has certain number of free seats
(Must ensure invariant)
Number of free seats decreases appropriately
Example: a contract between an airline and a customer
• Class Invariant:– global property of the instances of a class,
which must be preserved by all routines
Design by Contract – Concept
Airline (General) Airline (Business)
Customer
(client)
Be at the Pearson airport at least 5 minutes before scheduled departure time. Bring only acceptable baggage. Pay ticket price.
Be at the Pearson airport at least 30 minutes before scheduled departure time. Bring only acceptable baggage. Pay ticket price.
Airline
(supplier)
Bring customer to Chicago. Bring customer to O’Hare International Airport in Chicago.
Example: a contract between an airline and a customer
Design by Contract – Concept
• Subcontract: – Precondition can be weaken– Postcondition can be strengthen
Design by Contract – Concept
While Loading Baggage Handling
Airline
(supplier)
Detected a snake in Customer A’s baggage
Ask Customer A to leave the plane along with his baggage
Example: a contract between an airline and a customer
• Exception: – a run-time event that may cause a routine call
to fail
What is Design by Contract?
• Motivation
• History
• Concept
• Integrate with Agile
• Example
• Reviews
• Current State
Design by Contract – Integrate
"We will derive tremendous benefits from writing the assertions at the same time as we write the software, or indeed before we write the software."
-- Bertran Meyer, Object Oriented Software Construction
• Differ from TDD, DbC checks for all cases
• ESC/Java2 checks spec consistency at runtime
• JMLUnit auto-generates test cases
• JMLDoc embeds JML in JavaDoc
What is Design by Contract?
• Motivation
• History
• Concept
• Integrate with Agile
• Example
• Reviews
• Current State
What is Design by Contract?
• Motivation
• History
• Concept
• Integrate with Agile
• Example
• Reviews
• Current State
Design by Contract – Reviews
“I've tried to use [DbC] in a number of enterprise application settings, and I've found that in many situations it's as hard to write the pre and post conditions as it is to write the solution.”
-- Martin Fowler
“Design by Contract practice lessened the number of person-hours required to perform software testing.”
-- An Experience With Design by Contract
What is Design by Contract?
• Motivation
• History
• Concept
• Integrate with Agile
• Example
• Reviews
• Current State
Design by Contract – Current State
• Effiel – built into the language
• Java – JCR305 submitted for JML
• Microsoft – Spec# and Boggie
Q & A
top related