design engineers: matthew den herder jason fullen daniel martinez james sparks kellyne winchester...

Post on 20-Dec-2015

214 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SPARTASPecial Asset Real-time Tracking AidSponsored by: Kevin Priest and Cubic Corporation

Submitted to J. Kennedy and L. TummalaDesign Co. Ltd, San Diego, CA

Design Engineers:Matthew Den Herder

Jason FullenDaniel Martinez

James SparksKellyne Winchester

Gustavo BarriosAdrian CedenoEduardo Ceja

German OntiverosMichael Rueda

Dale Steen

When will customers find out their critical assets have been compromised?

Currently, the condition of an asset during transport is not known until the asset is received and inspected at its final destination

Special Asset Real Time Tracking

The SPARTA team is proposing a special asset tracking system that will immediately alert a Sensor Management Center in the event a sensed parameter is beyond acceptable limits.

Block Diagram

Master Node Communication

Master Node Package Design

Overall Dimensions: 203mm x 180mm x 101mm

Sensor Node High Level Block Diagram

Cutaway Dimensions

Sensor Node Physical Form

Overall Dimensions:90 mm x 90 mm x 35 mm

Overall System View

Cutaway Dimensions:114’’ x 48’’ x 96’’

Sensor Node◦ Power efficient microprocessor MSP-430.◦ ANT/ANT+ communication

Master Node◦ Sony Experia ARC◦ Wi-Fi/GSM or Iridium Satellite

Sensor Management Center◦ Receive data from Master Node.◦ Configurable GUI.

Performance Requirements

Sensor◦ Sensor node battery beyond 2 months.◦ Accelerometer ±8 G-force range◦ Temperature 25C – 85C◦ Humidity 0 – 100%◦ Pressure 50-150K Pa, 1K Pa accuracy◦ Light spectral bandwidth 430 – 610 nm.◦ Hall effect 50 gauss trip and 5 gauss release◦ ANT network protocol ◦ Sensor Management Center

Benchmarks

Research and Hardware Selection

Acquisition of Parts

Project Proposal

Sensors Node Software Development

Sensors Node Hardware Design

Master Node Software Development

Master Node Hardware Design

Validation of Components Selected

System Integration and Testing

Monday September 26, 2011

Monday October 3, 2011

Thursday October 13, 2011

Wednesday November 16, 2011

Wednesday November 18, 2011

Thursday November 18, 2011

Wednesday November 21, 2011

Wednesday November 23, 2011

Wednesday November 30, 2011

Project Plans & Milestones

Design Cost Analysis

Sensor Node 2880

Hrs

Master Node,

2400

Hrs

Design Cos t◦ H o u r s p e r We e k◦ N u m b e r o f

We e k s◦ H o u r l y Wa g e

Cell Phone $600

Data Plan & Iridium $1280

Sensors $352.8

Batteries $427.8

Radios $180

Miscellaneous $500

MicroControllers $48

System Cost Analysis

Sys tem Cos t◦ S e n s o r C o s t s◦ R a d i o C o s t s◦ C e l l P h o n e◦ M i s c e l l a n e o u s