design portfolio
Post on 10-Mar-2016
212 Views
Preview:
DESCRIPTION
TRANSCRIPT
Sheet Index
19
7
11
13
15
17
Picture Geometries
Color’s Effect on Patterns
The Cube
Law Firm
Selected Sketches
Department Store
5 LaunchHouse
1 Collaborative Arts Studio
Page 1
Collaborative Arts Studio
Objective: Take a selected space in the Halle building located in downtown Cleveland. Project is made to display the learned skills throughout the last four years in an application that the student is particularly interested in, so long as the end use services the area ap-propriately. Completed with Revit, Rhino, and Adobe Creative Suite. Online Presentation at: http://prezi.com/user/akcaja/. Duration of project: 3 months.
Forth Year - Interior Design Studio
Page 4Spring 2013
Rendered view of the Reception. Rendered view of the Atrium.
Panoramic view of the Atrium.
Rendered view of the Gift Shop. Rendered view of the Painting Room.
Selected Details.
LaunchHouse RenovationFourth Year - Interior Design Studio
Objective: Renovate the existing space to better suite the needs of the current tenant. The current tenant, LaunchHouse, is a business accelerator located in Shaker Heights, Ohio. No existing construction needs to remain in tact. Completed with Revit, Adobe Creative Suite, and a Physical Model. Duration of project: 3 months.
Page 5
First and Second Floor Plans
Fall 2012 Page 6
Rendered view of the rooftop patio and garden. Rendered view of the second floor conference room.
Department Store and RestaurantThird Year - Interior Design Studio
Objective: Take an existing construction in Florence’s city center and renovate it to a new department store. Each floor of the department store is to be divided among groups for the design. Completed with AutoCAD 2011, Google SketchUp 8, Kerkythea 2008, Hand Render-ings, Adobe Creative Suite, and a Physical Model. Duration of project: 4 months.
Page 7
Fourth floor rendered plan. Terrace rendered plan.
Spring 2012 Page 8
Rendered view of the department store. Rendered view of the fourth floor restaurant.
Third Year - Interior Design Studio Page 9
Rendered view of the terrace waiting lounge. Rendered view of the terrace bar.
Spring 2012 Page 10
Wall mounted merchandise shelving.Retractable canopy system for the terrace.
Terrace lounge table. Free standing merchandise shelving
Terrace waiting lounge fire pit.
Terrace lounge booths.
Third Year - Interior Design Studio
Law Firm
Objective: Create an efficient space plan for a law firm office. Only one elevator lobby is in use and the law firm will occupy the entire floor. Completed with AutoCAD. Duration of project: 3 weeks.
Page 13
Floor plan with room names.
The Cube
Objective: To define a 9x9x9 Cube by using three volumes of a lesser size. Lines are to be pulled only from the three forms. Mediums used to construct the three forms are limited to wood, vellum, and wood stick. Duration of Project: 6 weeks.
Second Year - Architectural Design StudioPage 15
Color’s Effect on PatternsFirst Year - Color Theory and Application
Monochrome Primary, Secondary, & Tertiary
Combination of two seperate projects. Completed with acrylic on bristol. Project 1 shows the difference in a pattern when using Primary, Secondary and Tertiary colors as opposed to a Monochromatic color scheme. Project 2 examines more color combination possibilities and how they effect the perception of the pattern. Duration of combined projects: 2 months.
Page 17
Page 19
Picture Geometries
Objective: Take an image and examine the geometries of it. Select from your analysis lines that stand out and create a 3D form from those lines. Materials used include acetate, black foamcore, and wood. Duration of project: 2 months.
First Year - Interior Design Studio
top related