TRANSCRIPT

MJEX Gate 1 WEEKLY SITE

PROGRESS

PICTORIAL

REPORT

Feb.07 to 13

2017

DEVELOPMENT

DEPARTMENT

BIRD’S EYE VIEW : February 13, 2017

VIEW near GATE 3 : VIEW FROM Gate 1 : VIEW near Gate 2 :

VIEW LOOKING SOUTH ; VIEW LOOKING NORTH :

VIEW FROM MSCP first floor to mjex gate 1 :

February 07, 2017 February 13, 2017.

Building FAÇADE VIEW FROM KING ROAD:

February 07, 2017

February 13, 2017

SKYLIGHTS :

A.1 CIVIL & STRUCTURAL :

Zone 1= Pouring of stamped concrete

walkways @ Mall Entrance. Remove part of existing concrete road @

Gate 3.

Zone 2= Concrete art form for decorative

fountain. Site work for car parking area.

Zone 3=: Pouring of stamped concrete ramp/

walkway.. Site layout & preparation prior pouring of

stamped concrete driveway, Gate 2.

B.1 ARCHITECTURAL :

Zone 1= Gypsum board ceiling & fascia. Cement plastering of external walls.

Zone 2 =Gypsum board false ceiling @ 1

st

Floor. Floor tiles work @ 1

st Floor, Gate 1.

Zone 3= Sealing of curtain wall glazing

joints. Floor tiles work @ Ground Floor, Gate 3...

C.1 MEP / ELECTRO- MECHANICAL:

Zone 1= Existing/ old lighting pole pedestal. Electrical wires for branches distribution.

Zone 2 = Fixing of Fire Hose Cabinet... Fixing of ductwork insulations..

Zone 3 = Survey of As- Built location of

machines… Electrical cable pulling…

Electrical cables & cable trays. Insulation for ductwork...

Power Ventilator for Smoke Control System. Power Ventilator Specifications.

Grease trap interceptors @ Gate 2... Grease trap interceptor @ Gate 3.

Prepared by : Noted by :

Engr. DANIEL L. RAZO RSM Site Superintendent

Engr. JAWEED O. ALHINDI RSM Development Manager