  • 8/19/2019 Development of Forecasting Accuracy and Production Planning System

    1/3

    Project Details

    SUMMARY:

     This function of this project is to develop a system to ascertain forecast accuracy

    using past data and accordingly plan production in order to make optimize use of company resources. This project will contain aspects of dierent elements of 

    planning, including inventory management, forecasting accuracy, workforce

    planning, material requirement planning and production planning. The project will

    be performed on a programmable language by creating a database for forecast and

    all related data.

    Project duration is estimated around to ! months and will require regular plant

    visits in order to completely understand the company"s business model

    PROJECT OBJECTIVES:

     The objective of this project is to combine all aforementioned elements of planning

    as well as calculating multiple performance indicators including lead time, line

    e#ciency and standard time

    Objectiv

    e No

    Objective Descritio!

    $ %etermination of forecast accuracy& 'ndicate e(treme values in current forecast using past data

    ) *lassi+cation of vendors and raw material based on lead time and

    material e(piry determination of standard time, production rate, downtime and worker

    e#ciency- %eveloping a system for tracking inventory

    %eveloping a system for calculating required raw material and work

    force %evising a production plan using aforementioned objectives

     

    PROJECT MET"ODO#O$Y:

     This section details on how the project will be achieved. The team will take astructured approach breaking each objective into multiple task and working on one

    task at a time.

    • T"E PROJECT APPROAC" SUMMARY 

     The project team will consist of four members/

  • 8/19/2019 Development of Forecasting Accuracy and Production Planning System

    2/3

    $. 0aisam 1aza&. 2wn 3aqvi). 4aad 2hmed. Taha 4hoaib

     The team will be structured in such a way to allow one member to solely work on

    system development on computer and one member will be dedicated for

    documentation while the other two members will conduct regular plant visits. 2t the

    end of each month a meeting will be conducted with the company to update on

    regular progress.

    %OR& BREA&DO%N:

     The following are the task in which the project is broken down and will be

    approached in the same order

    $. *alculating forecast accuracy

    &. *reating database to store all data). *lassi+cation of vendors and materials. %etermination of line e#ciency and production rate-. %etermination of lead time. %eveloping bill of material for each product. %eveloping inventory management system!. %evising a production plan

    • PROJECT DE#IVERAB#ES

    Deliverable

    sDeliverables Descritio!

    $ 2nalysis of trend of forecasting and its error& 'nventory management system

    ) %etermination of dierent performance indicators and suggestions for

    improvement 4ystem for determining work force planning and material requirement

    - 2 comprehensive production plan for each week

    RIS&S:

     The following are the risk associated with the project

    Ris' Descritio!5navailability of 

    data

    't will cause di#culty in determining accurate trend of forecast

    no creation of

    database

    't will be di#cult to link and store data if no database is

    present6ack of inventory 7ard to keep track of raw material inventory and will cause

  • 8/19/2019 Development of Forecasting Accuracy and Production Planning System

    3/3

    management

    system

    problem in estimating raw material ordering dates and

    quantities

    Project be!e(ts:

     This section describes the bene+ts this project will provide to the company

    Be!e(ts Descritio!1educed

    manpower

    8ith proper workforce plan there will be reduction in workers

    required6ess dead stock 8ith proper inventory system there will less chance of material

    e(piry6ess capital in

    inventory

    9y calculating lead time of vendors, delivery dates will become

    easy to calculate thus reducing capital investment in inventory:ective supply

    chain

    8ith the coordination of all departments supply chain will

    become more eective1eduction in

    forecast error

    9y eectively calculating forecast error a production plan will be

    devised accordingly thus not wasting company resources