district office - dotrdotr.gov.ph/images/alternative_methods_procurement... · lto region 7,...
Post on 20-Mar-2020
1 Views
Preview:
TRANSCRIPT
CONSTRUCTION/RENOVATIONS OF TOILET FACILITIES
Prepared by :
Regional DirectorRAUL B. AGUILOS, CESO III
Sheet Content:
Sheet No.:Sheet No.:
TSA 11
14
PS
R A
F
N
ART
MT
OT
NE
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D S N OI T
MM
PROJECT NAME :
Recommending Approval:
Approved:
DEPARTMENT OF TRANSPORTATION ANDCOMMUNICATION
LAND TRANSPORTATION OFFICE
0.6
01.3
6
0.2
01.8
0
SECTION TRU-ASCALE 1:80 M
PHENOLIC BOARD PARTITIONWITH STAINLESS STEELACCESSORIES
FLOOR MOUNTEDELONGETED BOWL
UNDER MOUNTED/COUNTER OVALLAVATORY
MOISTURE REISTANT GYPSUM BOARD
4.5
0
1.5
02.7
00.6
0
0.6
0
CEILING LINE
FINISH FLOOR LINE
APEX LINE OF TRUSS
FIRE WALL
SIDE ELEVATIONSCALE 1:80 M
GAUGE #24CORR. GI SHEET
SMOOTH FINISH CONC.
CEILING LINE
FINISH FLOOR LINE
APEX LINE OF TRUSS
FIRE WALL
SECTION TRU-CSCALE 1:100 M
4.5
0
1.5
02.7
00.6
0
0.6
0
PHENOLIC BOARD PARTITIONWITH STAINLESS STEELACCESSORIES
UNDER MOUNTED/COUNTER OVALLAVATORY
DOORS & WINDOW SCHEDULE11:50 M
OPERATION
LOBBY LECTURE
AREA
FINANCE
CEBU CITY
DISTRICT OFFICE
CEBU CITYLICENSING CENTER
COMFORTROOMS
COMFORTROOMS
CANTEEN
PLS. SEE DETAILS
LOCATION MAPNOT DRAWN TO SCALE
0.6
01.5
0
2.5
20.1
8
4.5
00.6
0
FIRE WALL
APEX LINE OF TRUSS
CEILING LINE
FINISH FLOOR LINEENTRANCE FLOOR LINE
FRONT ELEVATIONSCALE 1:80 M
2.7
0
SOLID PANEL DOOR
AA A
1.5
02.1
6
0.8
0
0.8
00.2
0
0.2
0
SECTION TRU-BSCALE 1:80 M
UNDER MOUNTED/COUNTER OVALLAVATORY
BEVELLED FRAMELESSWIDE GLASS MIRROR
MOISTURE REISTANT GYPSUM BOARD
WC
0.90 1.80
1.7
0
1.5
0
3.0
0
1.3
0
3.0
0
1.80 1.80 2.70
WC WC WC WC
A
B
UR LAV.
LAV. LAV.
0.901.60
0.6
0
R O O F L I N E
R O
O F
L I N
E
R O
O F
L I N
E
TOILET FLOOR PLANSCALE 1:80 M
0.90 0.90 0.90 0.90
1.5
0FEMALEMALE
UNDER MOUNTED/COUNTER OVALLAVATORY WITHLONG BED GRANITETOP SLAB
HOMOGENEOUS TILES ONA 0.30X0.60M GLOSSY
LIGHT TONE COLOR.
LTO.7.CR.P3.W1.L1.1LTO.7.CR.P3.W1.L1.0
LTO.7.CR.P3.W1.L1.2
LOCATION :
LTO REGION 7, TAGBILARAN CITYDISTRICT OFFICE
Admin - aide
CHERYL S.GOCELA
Submitted by :
ATTY. EFREN C. MONCUPA
Undersecretary for ProjectImplementation and Special Concerns
AS SHOWN
GUILLERMO L. LEONARDOOIC - Assistant Secretary for Project
Management
PS
R A
F
N
ART
MT
OT
NE
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D S N OI T
MM
DEPARTMENT OF TRANSPORTATION ANDCOMMUNICATION
LAND TRANSPORTATION OFFICE
CIFI DETAILSCALE 1.30 M
W F - 1 DETAILSCALE 1.20 M
W F - 2 DETAILSCALE 1.20 M
TRUSS DETAILSCALE 1.30 M
ROOF BEAM DETAILSCALE 1.30 M
SLAB DETAILSCALE 1.20 M
SLAB DETAILNOT DRAWN TO SCALE
Regional Director
Sheet Content:
Sheet No.:Sheet No.:
TSS 11
24
Recommending Approval:
Approved:
ATTY. EFREN C. MONCUPA
Undersecretary for ProjectImplementation and Special Concerns
AS SHOWN
CONSTRUCTION/RENOVATIONS OF TOILET FACILITIES
Prepared by :
RAUL B. AGUILOS, CESO III
PROJECT NAME :
LTO.7.CR.P3.W1.L1.1LTO.7.CR.P3.W1.L1.0
LTO.7.CR.P3.W1.L1.2
LOCATION :
LTO REGION 7, TAGBILARAN CITYDISTRICT OFFICE
Admin - aide
CHERYL S. GOCELA
Submitted by :
GUILLERMO L. LEONARDOOIC - Assistant Secretary for Project
Management
PS
RA
F
NART
MT
OT
NE
OO
CD
NATR
ANOIT
P
CIN
U
AE D S N OI T
MM
DEPARTMENT OF TRANSPORTATION ANDCOMMUNICATION
LAND TRANSPORTATION OFFICE
LOCATION MAPNOT DRAWN TO SCALE
OPERATION
LOBBY LECTURE
AREA
FINANCE
CEBU CITY
DISTRICT OFFICE
CEBU CITYLICENSING CENTER
COMFORTROOMS
COMFORTROOMS
CANTEEN
PLS. SEE DETAILS
LOCATION MAPNOT DRAWN TO SCALE
1. ALL ELECTRICAL WORKS AND INSTALLATION HEREIN SHALL BE DONE IN ACCORDANCE W/THESE PLANS AND SPECIFICATIONS THE APPLICABLE OF THE LATEST EDITION OF THE PHILIPPINEELECTRICAL CODE, THE RULES AND THE REGULATIONS OF THE LOCAL ENGINEERING AUTHORITYAND THE REQUIREMENTS OF THE LOCAL POWER. ELECTRICAL WORKS SHALL BE UNDER THEIMMEDIATE SUPERVISION OF A DULY LICENSED ENGINEERING OF MASTER ELECTRICIAN.
2.ELECTRICAL WIRING INSTALLATION SHALL BE DONE IN LOCATIONS AS FOLLOWS:
A. RIGID STEEL CONDUIT (RSC) TO BE USED IN SERVICE ENTRANCE AND FEEDERS. B. ELECTRICAL METALLIC TUBING (EMT) TO BE USED ABOVE THE CEILING AND BETWEEN OUBLE WALLS MADE OF COMBUSTIBLE MATERIALS. C. POLYVINYL CHLORIDE CONDUIT (PVC) TO BE USED IF EMBEDDED IN CONCRETE OR UNDERGROUND.
3.ALL WIRES SHALL BE PLASTIC AND THERMOPLASTIC INSULATED TYPE "TW" UNLESS OTHERWISEINDICATED, THE MINIMUM SIZE FOR POWER SHALL BE NO. 3.5 MM TW. CONTROL WIRES SHALLBE NO.2O MM TW. ALL OTHER WIRES SHALL BE AS INDICATED OR AS SPECIFIED ELSEWHEREON THE PLAN, PHELPS DODGE OR DURAFLEX BRANDS SHALL BE USED.
4.THE CONTRUCTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCEFOR CONNECTION TO THE POWER SUPPLY.5. ALL PIPES SLEEVES SHALL BE PROVIDED WITH PROPER SUPPORT OR ANCHORAGE NECESARRY FORCONNECTION TO CONCRETE WALLING BEAM.
6. ALL SERVICE ENTRANCE EQUIPMENT, SWITCHES, PANEL BOARD, LIGHTING FIXTURES AND ALLNON-CURRENT CARRYING METAL PARTS SHALL BE PROPRLY GROUNDED IN ACCORDANCE WITHTHE ELECTRICAL CODE.
7. AL FEEDERS AND BRANCH CIRCUITS SHALL BE INSTALLED AS INDICATED IN THE PLANS.BRANCH CIRCUIT HOMERUN WIRES SHALL BE INSTALLED IN INDIVIDUAL HOMERUN CONDUIT.8. ANY DISCREPANCY IN THE LOCATION AND RATINGS OF EQUIPMENTS AND APPARATUS SHALL BEBE VERIFIED WITH THE OWNER OR ANY OF HIS REPRESENTATIVES AND CHANGES SHALL BE MADE
9. ALL MATERIALS AND EQUIPMENTS TO BE INSTALLED SHALL BE BRANDED OR NEW AND MUST BE OFTHE PROVE TYPES FOR THE PARTICULAR LOCATON AND PURPOSE INTENDED.
10. ALL FLOURESCENT LAMP FIXTURES SHALL BE PROVIDED W/ PHILIPS NORMAL POWERFACTORS BALLAST AND ALL LAMPSSHALL BE COOL WHITE THOUGHT.
11 MOUNTING HEIGHTS OF WIRING DEVICES SHALL BE AS FOLLOWS:
A. LIGHTING SWITCHES 1.4M ABOVE FINISH FLOOR LINE B. CONVENIENCE OUTLETS 0.30 M ABOVE FINISH FLOOR LINE C. PANEL BOARDS 1.4 M ABOVE FINISH FLOOR LINE
ALL MOUNTING HEIGHTS SHALL BE SUBJECT TO ARCHITECT'S/ENGINEER'S APPROVAL PRIORTO THE INSTALLATION.
15 208- FLOURESCENT TUBE
640 220 0.29
CIRCUIT NO. LOAD DISCRIPTION WATTAGE VOLTAGE
AT POLEPROTECTION
SIZE OF WIRE CONDUITCURRENT
2#2.0 THW WIRE IN 15MM Ø PVC
SCHEDULE OF LOADS FOR GROUND FLOOR
12- RECESSED MOUNTED TYPE
TOTAL
LPPB 1
1.974
WITH ALUMINUM DEFLECTOR LOUVER
PINLIGHT WITH GLASS COVER 12 220LED TYPE 6 WATTS ( 300LUX)
LED TYPE 8 WATTS (300LUX).
0.054 2#2.0 THW WIRE IN 15MM Ø PVC15 21
2-CONV. OUTLET2 360 220 1.63 20 2 2#3.5 THW WIRE IN 15MM Ø PVC
0.90 1.80
6.30
1.70
1.50
3.00
1.30
3.00
1.80 1.80 2.70
1.80
0.60
R O O F L I N E
R O
O F
L I N
E
R O
O F
L I N
E
0.90 0.90 0.90 0.90
1.501
TOILET LIGHTING PLANSCALE 1:80 M
2
S1
S1
S1
S1
OIC - Assistant Secretary for ProjectManagement
Regional Director
Sheet Content:
Sheet No.:Sheet No.:
TSE 1 3
Recommending Approval:
Approved:
ATTY. EFREN C. MONCUPA
Undersecretary for ProjectImplementation and Special Concerns
AS SHOWN
CONSTRUCTION/RENOVATIONS OF TOILET FACILITIES
Prepared by :
RAUL B. AGUILOS, CESO III
PROJECT NAME :
LTO.7.CR.P3.W1.L1.1LTO.7.CR.P3.W1.L1.0
LTO.7.CR.P3.W1.L1.2
LOCATION :
LTO REGION 7, TAGBILARAN CITYDISTRICT OFFICE
Admin - aide
CHERYL S. GOCELA
Submitted by :
GUILLERMO L. LEONARDO
PS
R A
F
N
ART
MT
OT
NE
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D S N OI T
MM
DEPARTMENT OF TRANSPORTATION ANDCOMMUNICATION
LAND TRANSPORTATION OFFICE
WC WC WC WC WC
UR LAV.
LAV. LAV.
R O O F L I N E
R O
O F
L I N
E
R O
O F
L I N
E
TOILET PLUMBING LAYOUTSCALE 1:80 M
FEMALEMALE
FD FD
FD
VTR
TO PUBLICSEWER
TO PUBLICSEWER
TO WATER SOURCE
M
FAU FAUFAU
FAU
SECTION
DIGESTION CHAMBER
LEACHING CHAMBER LEACHING CHAMBER
2.0
0
0.2
01.7
0
SEPTIC TANK DETAIL1:150 MSCALE
0.1
0
21
10 CM GRAVEL BED
1.6
0
0.60
0.6
0
PLAN
MH MH MH
OPERATION
LOBBY LECTURE
AREA
FINANCE
CEBU CITY
DISTRICT OFFICE
CEBU CITYLICENSING CENTER
COMFORTROOMS
COMFORTROOMS
CANTEEN
PLS. SEE DETAILS
LOCATION MAPNOT DRAWN TO SCALE
Regional Director
Sheet Content:
Sheet No.:Sheet No.:
TSP 11
44
Recommending Approval:
Approved:
ATTY. EFREN C. MONCUPA
Undersecretary for ProjectImplementation and Special Concerns
AS SHOWN
CONSTRUCTION/RENOVATIONS OF TOILET FACILITIES
Prepared by :
RAUL B. AGUILOS, CESO III
PROJECT NAME :
LTO.7.CR.P3.W1.L1.1LTO.7.CR.P3.W1.L1.0
LTO.7.CR.P3.W1.L1.2
LOCATION :
LTO REGION 7, TAGBILARAN CITYDISTRICT OFFICE
Admin - aide
CHERYL S. GOCELA
Submitted by :
GUILLERMO L. LEONARDOOIC - Assistant Secretary for Project
Management
top related