City of Lebanon, NHCSO Contract 11
Community ConversationMarch 23, 2015
Sacred Heart Church
Agenda
• Introductions• Conversation Goals• CSO Overview• General Project Overview• Small Group Sessions• Q&A
Conversation Goals
• Collect information from residentsSewer backupsLocalized flooding (street, yard, basements)Sidewalk locations (current vs. desired)Pavement widthsParking needs (existing vs. desired)Curbing (vertical vs. sloped)Tree/planting/landscaping concernsCurb cuts (existing vs. desired)
CSO Terminology
CSO = Combined Sewer Overflow
CB = Catch Basin
CD = Consent Decree
Combined Sewer = pipe w/ storm and sanitary flow
Purpose of sewer separation project is to provide separate sanitary pipe and separate storm drain pipe.
CSO Program Overview• September 1998 – Draft CSO Master Plan• 2000 – Administrative Order from EPA• December 2005 – CSO Engineering Study• April 2009 – CD Issued
Nov 2018 – Complete Contract 11 Sewer SeparationDec 2020 – Eliminate All CSOs
CSO Contract 11 Area (feet)• Mechanic Street (2,000)• Mascoma Street (840)• High Street (600)• Worthen Street (500)• Cameron Avenue (500)• Mason Street (520)• West Street (1,070)• Child Street (590)• Granite Street (1,015)• Young Street (1,300)• Guyer Street (1,160)• Bliss Street (370)• Light Street (600)
• Bank Street Extension (1,000)• Cooper Street (250)• Bank Street Near Bank Street Extension (200)
• Bank Street Near East Park Street (250)
March 23, 2015 Meeting Area• Mason Street (520)• West Street (1,070)• Child Street (590)• Granite Street (1,015)• Young Street (1,300)• Guyer Street (1,160)• Bliss Street (370)• Light Street (600)
General Project Overview
• New sanitary, storm, and water pipes• Maintain esplanade configuration• Maintain sidewalk configuration• Retaining walls may be needed• Add curbing and catch basins
vertical vs. sloped curb
• May modify vertical profile• Constant roadway width
Protection of Trees
• Walkabout with arborist will be conducted.
• Invites via mailing will be forthcoming.
• Contact City staff if you have a concern about a particular tree or planting.
Schedule• House-To-House Inspections – January 2015
• Virtual Walkabouts – March 2015*
• CCVT/Smoke Testing – March 2015
• Project Area Survey – April 2015
• Preliminary Design – July 2015*
• 75% Design – September 2015*
• Final Construction Documents – March 2016*
• Bid Period – April 2016
• Start Construction – June 2016• End Construction – December 2017
* Public Meeting
Project Contacts• Christina Hall, City Engineer
Christina.Hall@lebcity.com
603.448.3112
• Mike Lavalla, Director of Public WorksMike.Lavalla@lebcity.com
603.448.3112
• LebAlertalert.lebnh.net
• Ryan Wingard, Wright-Pierce Project ManagerRyan.Wingard@wright-pierce.com
603.430.3728
Small Group Sessions
Mason StreetYoung to Granite
Approx. ProposedComponent Existing For Discussion
Width 25’ 24’
Esplanade yes (north) yes (north)
Sidewalk yes (north) yes (north)
Drainage CBs Vert. Curb/CBs
West StreetYoung to Granite
Approx. ProposedComponent Existing For DiscussionWidth 22’-25’ 22’
Esplanade yes (north) yes (north)
Sidewalk yes (north) yes (north)
Drainage CBs Vert. Curb/CBs
West StreetGranite to High
Approx. ProposedComponent Existing For DiscussionWidth 20’-25’ 20’
Esplanade None None
Sidewalk None None
Drainage CBs Slope Curb/CBs
Child StreetYoung to Granite
Approx. ProposedComponent Existing For DiscussionWidth 18’-20’ 20’
Esplanade None None
Sidewalk None None
Drainage CBs Slope Curb/CBs
Granite StreetMason to Mascoma
Approx. ProposedComponent Existing For DiscussionWidth 20’ – 35’ 24’
Esplanade Yes (west) Yes (west)
Sidewalk Yes (west) Yes (west)Partial (east) None
Drainage CBs Curb/CBs
Young StreetHough to Worthen
Approx. ProposedComponent Existing For DiscussionWidth 18’ – 26’ 22’
Esplanade None None
Sidewalk Partial (west) NoneDrainage CBs Curb/CBs
Guyer StreetYoung to Granite
Approx. ProposedComponent Existing For DiscussionWidth 20’ – 22’ 22’
Esplanade Yes (north) Yes (north)
Sidewalk Yes (north) Yes (north)
Drainage CBs Curb/CBs
Guyer StreetGranite to Mascoma
Approx. ProposedComponent Existing For DiscussionWidth 15’ – 20’ 20’
Esplanade None None
Sidewalk None None
Drainage CBs Slope Curb/CBs
Bliss Avenue/StreetYoung to Guyer
Approx. ProposedComponent Existing For Discussion
Width 12’-16’ 16’
Esplanade None None
Sidewalk None None
Drainage CBs Slope Curb/CBs
Light StreetGranite to High
Approx. ProposedComponent Existing For Discussion
Width 10’-18’ 12’
Esplanade none none
Sidewalk none none
Drainage CBs Curb/CBs