=dqnr dqg 6dud 3rvw 155, dqg 5lfkdug 3ulfh … · guhgjh pdwhuldo iru elrpdvv surgxfwlrq h j...
Post on 17-May-2018
215 Views
Preview:
TRANSCRIPT
marginal land and brownfield site improvement (Atlas Cement site); mine land and disturbed land restoration and reclamation (Hibtac and Keetac);potential biofuel/biomass plantation utilization (Regional Landfill site)
Hibtac Kleffman Road Site 1: October, 2014 Tree Planting
All three sites were planted with eight different species in a randomized design, on a 5ft. x 8ft. spacing
28
Erie Pier
Keetacproject
site
Potential location ofsource rock for
backhaul to Erie Pier
Erie
Pie
r sed
imen
t nor
th
Mesabi rock returns south
Natural erosional processes within the St. Louis
River Watershed
deposit clean
sediment into St. Louis River
estuary
Clean sediment
goes north
top related