draft e ia repor t
Post on 12-Apr-2022
4 Views
Preview:
TRANSCRIPT
FO
T
ME
ORMA
& LA
TALUK
OPP.
N
D
ELAMIN
ALDEH
AMINA
M
SURV
KA: LIM
[
[NAGANES
KARGIL
NABET A
RAF
NE FOR
HYDE R
ATED
M/S.
VEY NO
BDI, DI
BASEL
[DECEM
T.ABET ASH MERI
L PETRO
EMA
C
ACCRED
FT E
PR
RMAL
RESIN,
SHEET
NN
O.: 1458,
ISTRIC
CAT
LINE M
MBER 20
PRE
. R. AACCREDIDIAN, B
OL PUMP
AIL: adm
CONTAC
DITATIO
SEPT
EIA
FOR
ROPOS
DEHY
UREA
TS MAN
OF
N PO
AT
, VILLA
T: SURE
TEGORY
MONITO
016 TO
EPARE
ASSODITED EBLOCK N
P, S. G. H
m.trassoci
CT NO.:
ON NO.: N
EMBE
RER
SED
DE RE
FORM
NUFAC
OLYM
AGE: PA
ENDRA
Y: 5 (F)
ORING
FEBRU
ED BY
CIATEIA CONNO.: C, O
HIGHWA
ates@gm
09825371
NABET/E
ER 201
POR
SIN, PH
MALDE
CTURI
MER
ANSHIN
ANAGA
PERIOD
ARY 20
TES NSULTOFFICE N
Y, AHME
ail.com
1099
EIA/1619/
17
RT
HENO
EHYDE
ING UN
RS
NA,
AR, GUJ
D
017]
TANT] NO. 605‐A
EDABAD
/RA0033
OL
E RESIN
NIT
JARAT.
A,
D‐380060
N
0
DECLARATION BY
EXPERTS
EXECUTIVE SUMMARY
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 1
EXECUTIVE SUMMARY – ENGLISH & GUJARATI
Executive Summary – ENGLISH
1. INTRODUCTION
M/s. NN Polymers is proposing to manufacture Melamine Formaldehyde Resin,
Phenol Formaldehyde Resin & Urea Formaldehyde Resin as well as Laminated Sheets
at Survey No.: 1458, Village: Panshina, Taluka: Limbdi, District: Surendranagar,
Gujarat. Details of proposed products are as given below:
Details of Proposed Products
Sr. No. Name of Product Production Capacity
1 Melamine Formaldehyde Resin 300 MT/Month
2 Phenol Formaldehyde Resin 300 MT/Month
3 Urea Formaldehyde Resin 300 MT/Month
4 Laminated Sheets 1,50,000 Nos./Month
Note: Please note that above stated Resins will be used for captive consumption (for manufacturing of laminates sheets) as well as for sell purpose.
M/s. NN Polymers has a total land area of 17,705 m2. Out of the above stated land
area approximately 6,915 m2 is green belt area (approx. 39 % of the total land area).
Non Agriculture (NA) permission has been already obtained by the land owner from
the concerned authority.
Proposed manufacturing unit is a Medium Scale Unit having total investment of about
Rs. 8.5 Crores out of which resin plant cost will be approx. Rs 1.1 Crore. Approximately
Rs. 75 Lakhs will be allocated towards environmental management facilities.
M/s. T. R. Associates (NABET Accredited EIA Consultant) was appointed by M/s. NN
Polymers to carry out the Environmental Impact Assessment study for their proposed
project.
The proposed products like Melamine Formaldehyde Resin, Phenol Formaldehyde
Resin & Urea Formaldehyde Resin (being synthetic organic chemicals) falls under
Category 5(f) as stated in Environment Impact Assessment Notification Published on
14th September, 2006. Further, the location of proposed project is outside the notified
industrial estate and not fall in Small Scale Industrial Unit criteria as per the
Notification dated 25th June 2014. Hence, project proponent has to obtain the
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 2
Environmental Clearance from the Ministry of Environment, Forests & Climate Change
(MoEFCC), New Delhi. As a part of this procedure, Public Hearing is required to be
carried out as per the notification as well as the TOR granted to the unit by the Expert
Appraisal Committee (Industry‐2).
This study of Environment Impact assessment (EIA) is based on studies carried out
during the month of December 2016 to February 2017. The environmental parameters
(ambient air, water, soil, noise, flora and fauna) selected for study are those, which
are likely to be most affected by the project. The study area is defined as an area
within 10 km. radius from centre of the project site.
Salient Features within 10 km radius surroundings area as follows:
Sr.
No. Important Features Description
1 Location Survey No. : 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
2 Project Site Co‐ordinates Latitude: 22°34'9.72"N
Longitude: 71°59'38.10"E
3 Temperature Range 21˚C to 34.4˚C (average)
4 Mean Sea Level 14 m
5 Annual Rain Fall 750.9 mm (average)
6 Ground Water Depth 25.36 m to 611 m
7 Soil Type Medium black soils, Red Sandy soils and Silty soils
8 Nearest Railway Station Limbdi railway station – 21 km in West direction
9 Nearest Airport Ahmedabad airport – 85 km in NE direction
10 Nearest Village Kanpara – 0.65 km in SW direction
Panshina ‐ 3 km in SW direction
11 Nearest State Highway SH 38 ‐ 18.5 km in West direction.
12 Nearest National Highway NH 8A – 0.19 km in North direction
13 Nearest River/Water body Bhogavo River ‐ 2.2 km in SW direction
Narmada Canal – 1.2 km in South direction
14 National Parks / Sanctuary / Eco
Sensitive Zone/ Reserved Forest
None within 10 km radius.
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 3
2. AIR ENVIRONMENT
The base line Ambient Air Quality (AAQ) status within 10 km study area has been
assessed through a monitoring network of 8 AAQ sampling stations during December
2016 to February 2017. Map showing 10 km radius area is shown here. Design of
network for Ambient Air Quality monitoring locations were decided on meteorology &
available infrastructure facilities. The base‐line Ambient Air Quality of the study area
was monitored for Particulate Matter (PM10 & PM2.5), Sulphur Dioxide (SO2) and
Nitrogen Dioxide (NO2), CO & VOC. The result for the same is given as below:
Location Results (98th Percentile)
PM2.5 PM10 SO2 NO2
Village: Kanpara 33.96 78.46 18.55 25.54
Village: Panshina 31.39 77.34 21.00 26.08
Village: Katariya 32.07 71.01 16.95 24.72
Village: Ralol 29.89 81.46 18.39 28.11
Village: Jasmatpar 33.27 79.54 17.94 27.21
Village: Devpara 32.56 80.45 20.36 29.12
Village: Bajarda 30.81 75.91 19.04 26.44
Project Site 34.90 83.81 21.89 30.80
Permissible limit [NAAQ standards‐2009]
60 µg/m3 100 µg/m3 80 µg/m3 80 µg/m3
Note: CO: Below Detectable Limit; VOC: Below Detectable Limit
Analysis of ambient air samples revealed that the Air quality is found well within the
prescribed limits of National Ambient Air Quality standards.
The main source of gaseous emission is flue gas emission from stack attached to
Steam Boiler & TFH and D. G. set & process gas emission from laminated sheet dryer.
Agro‐Waste / Briquettes will be used as a fuel & the requirement shall be 7 MT/Day.
Adequate stack height will be provided for proper atmosphere dispersion of pollutant.
The probable emitted pollutants will be PM, SO2 & NO2. Cyclone separator followed by
bag filter will be provided as APCM. Since Diesel will be used as a fuel for D. G. Set
(back–up system) the flue gas emission will also be well within prescribed norms and
there is no need of any air pollution control measures for D. G. Set. Condenser System
will be provided at stack attached with laminated sheet dryer for Methanol recovery.
3. WATER ENVIRONMENT
Analysis of ground water and surface water samples revealed that it is suitable for
domestic activity including agricultural activity. Ground water and surface water
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 4
quality in the area meets the Water Quality Standards (IS 10500) for drinking water
except for Turbidity, E. Coli. and Coliforms at some locations.
Water Requirement
The total water requirement for the proposed project will be 51 kl/day. Out of this
said fresh water quantity 4.5 kl/day will be used for domestic purpose, 37 kl/day will
be used for industrial activities and 9.5 kl/day will be used for greenbelt development
purpose. The required water will be obtained through Borewell.
Wastewater Generation and its Disposal
The total generation of domestic wastewater will be 4 kl/day from the proposed
project activity. The domestic wastewater generated will be disposed off through
septic tank/soak pit system.
The total industrial effluent generation from proposed project activity will be 15.7
kl/day, which will be from boiler blow down, cooling tower purge, RO reject, process
and washing. Industrial wastewater from resin mfg. process & washing activity will be
1.6 kl/day, which will be given primary treatment by chemical oxidation. RO1 reject,
boiler blow down, cooling tower purge will be approx. 14.1 kl/day, which will be taken
to RO2, permeate will be reused for RO1 & reject will be mixed with primary treated
effluent in holding tank. Finally it will be evaporated in evaporator & condensate will
be recycled in RO1. Therefore no effluent will be required to be discharged and the
stated process would be a ZERO DISCHARGE process.
4. LAND / SOIL ENVIRONMENT
During operation activity the impact of air, water and solid waste pollution on soil
causes direct / indirect effect on soil.
As all necessary air pollution control steps will be provided and based on the results of
the dispersion model for the Ground Level Concentrations of various pollutants after
commissioning of the proposed project, there will not be any adverse impact of air
pollution on soil.
It may be noted that there will be no disposal of untreated effluent on land. So, there
will be no adverse effect on land / soil due to water.
All necessary control steps will be provided for handling, storage and disposal of
solid/hazardous waste generated from the plant. Thus, there will not be any
significant impact of solid/hazardous waste on the soil environment.
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 5
5. NOISE ENVIRONMENT
Noise level was recorded at eight locations within the study area to provide the
baseline data to describe the existing situations.
Sr.
No.
Location Noise Level (Leq) in dBA (Day Time)
Noise Level (Leq) in dBA (Night Time)
Measured Permissible Limit Measured Permissible Limit
1 Project Site 63.4 75 57.4 70
2 Kanpara 47.4 55 43.0 45
3 Panshina 49.4 55 39.1 45
4 Bajarda 52.8 55 38.1 45
5 Katariya 50.7 55 42.2 45
6 Ralol 46.7 55 40.6 45
7 Jasmatpar 51.1 55 41.7 45
8 Devpara 45.4 55 44.0 45
6. SOCIO‐ECONOMIC ENVIRONMENT
An assessment of socio‐economic environment forms an integral part of an EIA study.
Socio‐economic environment – demographic & related socio‐economic data was
collected from District Census Handbook to assess socio‐economic status of the study
area.
For proposed project activity, total 65 nos. of skilled and unskilled employees/ workers
will be required. The indirect employment will be generated by way of transportation,
shopkeepers and other casual employment for many people.
Local people will be given preference wherever found suitable for all the jobs in the
plant. Economic status of the local people will improve due to the increased business
opportunities, thereby, making a positive impact. Educational, medical and housing
facilities in the study area will considerably improve.
7. ECOLOGY & BIODIVERSITY
The study area was dominated by agriculture landscape. The floral and faunal diversity
was very less.
Domestic tree species found in the study area are Baval, Neem, Arduso, Gulmohar,
Karanj, Khijado and Kesudo. Major crops in the study area are Cotton, Castor, Rice,
Wheat, and Jowar.
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 6
The commonly spotted bird species of this area were House Sparrow, Blue Rock
Pigeon, Ring Dove, Asian Koel, Common Myna, Rose‐ringed Parakeet, House Crow,
Peacock, Cattle Egret, Black Headed Ibis and Common Kingfisher.
The wild mammals found other than domesticated ones from study area were Nilgai,
Golden Jackal, Grey Mongoose, Hare and Wild Boar.
8. SOLID WASTE MANAGEMENT
The main hazardous waste generation will be ETP Sludge + Evaporation Residue, Used
Oil, Discarded Plastic Bags/Drums, Edge Cutting Waste and Spent Carbon.
ETP Sludge + Evaporation Residue will be disposed off at approved TSDF site. Used Oil
will be reused within premises as a lubricant or sold to registered recycler. Discarded
Plastic Bags/Drums will be sold to authorized vendor. Edge Cutting Waste and Spent
Carbon will be disposed off to CHWIF site.
The unit will provide isolated area for the storage of hazardous waste. Thus,
hazardous waste management system provided by the unit will be adequate and there
will not be any major impact on the environment due to hazardous waste.
9. ENVIRONMENTAL MANAGEMENT PLAN
An Environmental Management Plan has been prepared for mitigation of the adverse
impacts.
The Environmental Management Plan describes in brief, the management’s plan for
proper and adequate implementation of treatment and control system for pollutants
and for maintaining the environment. It also includes development of green belt,
proper safety of workers, environmental monitoring plan, rain water harvesting, fire
protection system and measures etc.
An Environmental Management Cell will be formed for effective implementation of
Environmental Management Plan.
10. ENVIRONMENT MONITORING PROGRAME
Monitoring of environmental factors will enable us to identify the changes in the
environmental impacts at various locations and their mitigative measures. To ensure
the effective implementation of the EMP, monitoring of ambient air quality, stack
emissions, analysis & monitoring of water environment and noise level will be carried
out as required / specified by statutory authority.
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 7
11. RISK ASSESSMENT
Risk analysis and study have been carried out for identification of hazards, selection of
maximum credible scenarios, risk mitigation measures etc. All the hazardous
chemicals will be stored and handled as per MSDS guidelines. Personal protective
equipments will be provided to the workers.
12. GREEN BELT DEVELOPMENT
A greenbelt of approximately 6,915 m2 is developed within the project site to
minimize the air pollution, noise pollution, balancing eco‐environment, soil erosion /
protection etc. Greenbelt area is 39 % of the total plot area.
13. PROJECT BENEFITS:
The proposed project will become beneficial to the surrounding area or community in
terms of infrastructural development, social development, employment and other
benefits.
The proposed project has a potential for employment of skilled, semi‐skilled and
unskilled employees during construction phase as well as operation phase. A total 65
nos. of person is likely to get employment due to the proposed project. The project
will earmarked 2.5 % of project cost for socio‐economic development activities in
surrounding villages.
14. CONCLUSION:
Negligible impacts will occur on air quality. However, all the necessary air
pollution control measures will be provided.
No ecological damage will occur.
No adverse impacts will occur on water environment.
Local employment opportunities will increase.
Various other environment parameters like Forest/ National Park/ Sanctuary and
Religious / Historical Places will not be affected.
Environment Management Plan has been formulated to control all the pollutant
parameters and Environment Management Cell has been set‐up to ensure that
these parameters do not exceed the norms set out by the concerned authorities.
After commissioning of the proposed project the Environmental Management Cell
will take care of all the pollution control measures.
It can be concluded on a positive note that after the implementation of the mitigation
measures and environmental management plan during the construction & operational
phase, there will be negligible impact on the environment.
Environ
૧.
મેસસર્ એ
ગામ:-
ફોમાર્ ડી
લેમીનેટે
મ ં૧૨
૩
૪
ન ધ: ઉપ
માટે થશે
પ્ર તાિવ
૬,૯૧૫
બીનખેત
પ્ર તાિવ
પ્ર થાિપ
આશરે
nmental Impa
T. R. AssoNABET A
તાવના:-
એન એન પ
પાણશીણા,
ીહાઈડ રેઝી
ટડ શી સનુ ં
ાકં મે
૪
પરોક્ત રેઝીન
િવત એન એ
ચો.મી. (આ
તી માટેની મ
િવત એકમને
િપત કરવાની
િપયા ૭૫
act Assessmen
ociates (AhmeAccredited
EXECU
પોલીમર એ
તાલકુા:- લ
ીન, િફનોલ
ઉ પાદન ક
ોડમેલેમાઈન ફોિફનોલ ફોમ
યરુીયા ફોમ
લેમીન
ન નો ઉપયોગ
એન પોલીમ
આશરે કુલ
મજૂંરી અગાઉ
પ્ર થાિપત
ની િકંમત િ
લાખ ફાળવ
nt Report
edabad)
UTIVE SU
સં ી
એ પ્ર તાિવત
લીંબડી, જી
ફોમાર્ ડીહા
રવા માટેની
તાિવત ોડ
ડ ટ ુ ંનામ ોમાર્ ડીહાઈડમાર્ ડીહાઈડ ે
માર્ ડીહાઈડ ે
નેટેડ શી સ
કે ટીવ વપર
ર એકમનો
િવ તારના
ઉથી સબંિધ
કરવાની િક
િપયા ૧.૧
વવામા ંઆવ
UMMAR
ી ત અહ
ત એકમ છે.
લો:- સરેુ
ાઈડ રેઝીન
ી દરખા ત
ડ ટ (ઉ પાદ
ડ રેઝીન રેઝીન
રેઝીન
સ
રાશ માટે (લેમ
કુલ િવ તા
૩૯%) જમ
ધત સ ા પાસ
િકંમત િપય
કરોડ અને
વશે
Taluka: Li
RY – GU
વાલ
આ પ્ર તાિ
દ્રનગર, ગજુ
અને યરુીય
કરેલ છે.
દન) ની િવગ
૩૩
૩
૧
મીનેટેડ શીટન
ર આશરે ૧
મીન ગ્રીન બે
સેથી જમીન
યા ૮.૫ કરો
પયાર્વરણી
Survey No
imbdi, District
Execut
JARATI
િવત એકમે
જરાત રાજય
યા ફોમાર્ ડી
ગત
મત૩૦૦ મેટ્રીક ૩૦૦ મેટ્રીક
૩૦૦ મેટ્રીક
૧,૫૦,૦૦૦ ન
ના ઉ પાદન મ
૧૭,૭૦૫ ચો
બે ટ માટે ફ
ન માિલક ાર
ોડ થશે. મ
ીય યવ થ
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
સવેર્ ન.ં -
ય ખાતે મે
ીહાઈડ રેઝી
તા ટન/માસ ટન/માસ
ટન/માસ
નગં/માસ
માટે) તેમજ વે
ો. મીટર છે.
ફાળવવામા ં
રા મેળવેલ
માથંી રેઝીન
થાપન પ ધ
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 8
૧૪૫૮,
લેમાઈન
ીન તથા
વેચાણ હતે ુ
માથંી
આવશે.
છે.
ન લા ટ
ધિત માટે
Environ
મેસસર્
પયાર્વર
અતે્ર ન
યરુીયા
નોટીફીકે
ઓ ોિગ
નાના પ
Environ
(Enviro
પયાર્વર
એ યિુન
પયાર્વર
૨૦૧૬
(આસપ
અસર પ
૧૦ િકમ
આસપા
માકં ૧
૨
૩ ૪ ૫
nmental Impa
T. R. AssoNABET A
એન એન
રણીય પ ૃ થ
ન ધનીય છે
ફોમાર્ ડીહા
કેશન-૨૦૦૬
િગક િવ તારન
પાયાના ઓ
nment, Fo
onmental C
રણીય લોકસુ
નટને આપેલ
રણ ૃ થકર
થી ફે આુ
પાસ ની હવા
પામી શકે તે
મી. િત્ર યાન
સના ૧૦ ક
ુ યપ્ર તાિવત
અક્ષાશં – તાપમાન સમદુ્રી તરવાિષર્ક વર
act Assessmen
ociates (AhmeAccredited
પોલીમર
થકરણ અસ
કે મેલામા
ઈડ રેઝીન
૬ ના િવભ
ની બહાર છે
ઓ ોિગક એ
rest & C
Clearance)
સનુાવણી એ
ા TOR પ્રમ
ણ અસર અ
આરી ૨૦૧૭
ા, પાણી, જ
તેમ છે, તેનો
ના વતુર્ળાકાર
કમી િ યાન
ય લા ણ તએકમનુ ં થ
રેખાશં
રના સરેરાશરસાદ
nt Report
edabad)
ારા મેસસ
ર અ યાસ
ાઇન ફોમાર્
(સી થેટીક
ભાગ-૫(એફ)
અને સિૂચત
એકમ અંતગર્
Climate Ch
મેળવવાન
જાહરેનામા
ાણે કરવામાં
અ યાસ (En
દરિમયાન
જમીન, વિન
ો અ યાસ ક
ર િવ તારને
ના િવ તારન
તાઓ થાન
શ
સર્ ટી. આ
સ (EIA) કર
ડીહાઈડ રેઝ
ક ઓગેર્નીક
)મા ં આવે
ત પરીયોજન
ગર્ત આવતો
hange), ન
ની જ રીયા
ા પ્રમાણે તથ
ા ંઆવશે.
nvironment
કરવામા ં
િન, વન પિત
કરવામા ંઆ
અ યાિસત
ની ુ ય લા
સવેર્ ન:ં- ૧તાલકુા:- લરા ય:- ગુઅક્ષાશં:- રેખાશં:- ૭૨૧.૦°સે. ૧૪ મીટર૭૫૦.૯ મી
Taluka: Li
આર. એસોસી
રવા માટે
ઝીન, િફનો
ક કેિમકલ)
છે. તદ્ઉપ
ના ૨૫ જૂન
ો નથી તેથ
નવી િદ હી
ાત રહલે
થા એ પટર્ એ
tal Impact
આવેલ છે.
તઓ અને પ્ર
આ યો છે. પ્ર
કે્ષત્ર તરીકે
ા ણકતાઓ
વ૧૪૫૮, ગામલીંબડી, જીગજુરાત. ૨૨0૩૪’૦૯૭૧0૫૯’૩૮.૧થી ૩૪.૪°સે
મી.મી (સરેરા
Survey No
imbdi, District
Execut
ીએ સની પ્ર
િનમણ ૂકં કર
લ ફોમાર્ ડી
નુ ં પ્ર તાિવ
પરાતં એકમ
૨૦૧૪ના ન
થી MoEF&
પાસેથી પ
છે. આ પ્ર
એપ્રાઈઝલ
Assessmen
પયાર્વરણી
પ્રાણીઓ)
તાિવત એક
નક્કી કરવ
ઓ નીચે મા
વણન મ:- પાણશીણલો:- સરેુ દ્ર
.૭૨”N ૧૦”E સે. (સરેરાશ
ાશ)
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
પ્ર તાિવત
રવામા ં આ
ીહાઈડ રેઝી
િવત ઉ પાદ
મની જગ્યા
નોટીફીકેશન
&CC (Mini
પયાર્વરણીય
પ્રકીયાના ભ
કમીટી (ઇ
nt Study)
ણીય ઘટકો
પ્ર તાિવત
કમને કે દ્રમ
વામા ંઆવેલ
ાણે છે.
ણા, દ્રનગર,
)
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 9
એકમનો
વેલ છે.
ીન અને
દન EIA
સિૂચત
ન પ્રમાણે
istry Of
ય મજૂંરી
ભાગ પે
ડ ટ્રી-૨)
િડસે બર
વા કે
એકમથી
મા ંલઈને
લ છે.
Environ
માકં ૬ ૭ ૮ ૯ ૧૦
૧૧ ૧૨ ૧૩
૧૪
૨. હવ
પ્રવતર્મ
થળથી
થી ફે ુ
ગણુવ
પ્રા ત સ
(PM10 &
ની ચકા
ના પિ
કાનપપાણ
nmental Impa
T. R. AssoNABET A
ુ યભગૂભર્ જળજમીન પ્રકનજીક નુ ંરેનજીક નુ ંએનજીક નુ ંગ
નજીકનો રનજીકનો રનજીકના જોત
રા ટ્રીય પ્રાણીઓ મ
વા ુ ંપયાવ
માન આસપા
ી ૧૦ િકમી
આરી ૨૦૧
ા નક્કી કર
સિુવધાઓના
& PM2.5), સ
ાસણી કરવા
િરણામો નીચે
થળ
પરા ણશીણા
act Assessmen
ociates (AhmeAccredited
ય લા ણ તળની ઉડાઈં કાર રે વે ટેશન એરપોટર્ ગામ
રા ય ધોરીમરા ટ્રીય ધોરીજમીન પરન
ઉપવન -માટેનુ ંઅ ય
વરણ (Air
ાસની હવાન
િત્ર યાના વ
૧૭ દરિમયા
વા માટેના
ા આધારે ન
સ ફર ડાયો
ામા ંઆવી હ
ચેના ટેબલમ
PM૩૩.
૩૧.
nt Report
edabad)
તાઓ
માગર્ ીમાગર્ ના પાણીના
- જગંલી યાર ય
Environm
ની (Ambie
વતુર્ળાકાર િવ
ાન નમનૂા
થળની પસ
ક્કી કરેલ હ
કસાઈડ (SO
હતી.
મા ંદશાર્ યા
M2.5 .૯૬
.૩૯
૨૫.૩૬ મીકાળી જમીલીંબડી રેઅમદાવાદકાનપરા -પાણશીણાટેટ હાઈવેનેશનલ હભોગાવો નનમર્દા કેન૧૦ િકમી
ment) :-
nt Air) ગણુ
િવ તારમા ં૮
લઈને તેની
સદંગી વાયશુ
હતી. હવાની
O2), નાઈટ્રો
મજુબ છે.
પ રણામPM10 ૭૮.૪૬
૭૭.૩૪
Taluka: Li
વમીટર થી ૬૧ીન, લાલ રેવે ટેશન -દ એરપોટર્- ૦.૬૫ િકમા - ૩ િકમી વે ૩૮ - ૧૮હાઈવે ૮ એનદી – ૨.૨નાલ – ૧.૨ િત્રજયામા ંન
ણવ ા જાણ
૮ અલગ અ
ની ચકાસણી
શા , CPCB
ગણુવ ા ન
ોજન ડાયોક
મ (98thટકાવ
૧
૨
Survey No
imbdi, District
Execut
વણન ૧૧ મીટર તાળ, કાપંવ- ૨૧ િકમી - ૮૫ િકમી મી દિક્ષણ-પદિક્ષણ-પિ.૫ િકમી પિ- ૦.૧૯ િકમિકમી દિક્ષણિકમી દિક્ષણનથી
ણવા માટે પ્ર
અલગ થળેથ
કરવામા ંઆ
B ની માગર્દ
નક્કી કરવા
કસાઈડ (NO
વાર ) SO2 ૧૮.૫૫
૨૧.૦૦
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
વાળી જમીનપિ મ ઉ ર-પવૂર્ પિ મ િ મ િ મ મી ઉ ર ણ-પિ મ ણ
પ્ર તાિવત
થી ડીસે બર
આવી હતી.
દિશર્કા અને
માટે પાિટર્ક
O2), CO અ
NO2 ૨૫.૫૪
૨૬.૦૮
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 10
ન
એકમના
ર ૨૦૧૬
હવાની
નજીકની
કલ મેટર
અને VOC
૪
૮
Environ
કટારરળોલજશમદવપબાજોવી
ન ધ
આસપા
એર ક્વો
હવાના
અને થિ
એગ્રો વે
રહશેે. સ
ફેલાવ
િનયતં્રક
પાવ
ઉ સ ન
જ રી ન
િસ ટમ
૩. જળ
ભગૂભર્ જ
શકાય
nmental Impa
T. R. AssoNABET A
થળ
ર યા લ મતપર પરા જરડા
ટ સાઈટ કાય મયાદા
ધ: CO: Below
સની હવાન
વોલીટીના ધ
પ્રદૂષણનો
િમર્ક યડુ હ
વે ટ/િબ્રકેટસ
સભંિવત બ
માટે ચીમની
તરીકે સાય
વર કટ વખ
ન પણ િનય
નથી. મીથેન
લગાવવામ
ળ પયાવર
જળ તેમજ
કે અ યાિસ
act Assessmen
ociates (AhmeAccredited
PM૩૨.
૨૯.
૩૩.
૩૨.
૩૦.
૩૪.
ા ૬૦ µ
w Detectable
ના પિરણામ
ધારાધોરણ મુ
મખુ્ય ોત
હીટર, D. G
સ બળતણ
હાર િનકળત
ની ની પયાર્
યક્લોન સેપ
તે વપરાશે
યત ધારાધોર
નોલની રીક
મા ંઆવશે.
ણ (Water
જમીન પર
સત િવ તાર
nt Report
edabad)
M2.5 .૦૭
.૮૯
.૨૭
.૫૬
.૮૧
.૯૦
µg/m3
e Limit; VOC
પરથી તાર
મજુબ છે.
ચીમની મ
G. Set અને
તરીકે વાપ
તા પ્રદૂષકો
ત ઉંચાઈ
પરેટર અને બે
તેમા ંબળત
રણો મજુબ
કવરી માટે
r Environ
ના પાણીન
નુ ંભગૂભર્
પ રણામPM10 ૭૧.૦૧
૮૧.૪૬
૭૯.૫૪
૮૦.૪૫
૭૫.૯૧
૮૩.૮૧
૧૦૦ µg/m
C: Below Det
ણ કાઢી શક
માથંી નીકળત
લેમીનેટેડ શ
પરવામા ંઆ
PM, SO2
રાખવામા ંઆ
બેગ-િફ ટર
તણ તરીકે
રહશેે તેથી
લેમીનેટેડ શ
ment):-
ના નમનૂાઓ
જળ તેમજ
Taluka: Li
મ (98thટકાવ
૧
૧
૧
૨
૧
૨
m3 ૮૦
tectable Lim
કાય કે હવાન
તા લ ૂગેસ
શી સના ડ્રા
આવશે ની
& NO2
આવશે ટીમ
લગાવવામ
ડીઝલ વાપ
ી D. G. S
શી સના ડ્રા
ઓની ગણુવ
જ જમીન પ
Survey No
imbdi, District
Execut
વાર ) SO2 ૧૬.૯૫
૧૮.૩૯
૧૭.૯૪
૨૦.૩૬
૧૯.૦૪
૨૧.૮૯
૦ µg/m3
mit
ની ગણુવતા
સ ઉ સ ન કે
યરમાથંી િન
જ િરયાત
હશે ના વ
મ બોઈલર
મા ંઆવશે.
પરવામા ંઆ
et માટે હવ
ાયરની િચમ
ા પરીક્ષણ
પરનુ ંપાણી
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
NO2 ૨૪.૭૨
૨૮.૧૧
૨૭.૨૧
૨૯.૧૨
૨૬.૪૪
૩૦.૮૦
૮૦ µg/
ા નેશનલ એ
કે ટીમ
િનકળતો ધમુ
૭ મે. ટન
વાતાવરણમ
સાથે હવા
યારે D. G.
આવશે અને
વા પ્રદૂષણ
મની સાથે
પરથી તાર
કૃિષ પ્રવિૃ
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 11
૨
૧
૧
૨
૪
૦
m3
એ બીયટં
બોઈલર
માડો છે.
ન/િદવસ
મા ંયોગ્ય
પ્રદૂષણ
. SET કે
લ ૂ ગેસ
િનયતં્રક
ક ડે સર
રણ કાઢી
િ સિહત
Environ
થાિનક
નમનૂાઓ
પરનુ ંપ
પાણીની
પ્ર તાિવ
ઘરગ થુ
માટે ૩૭
િદવસ
મેળવવ
ગદંાપાણ
પ્ર તાિવ
ઘરગ થુ
પ્ર તાિવ
લોડાઉ
માથંી િન
ગદું પા
ઓ - ૧
િકલોલી
૧મા ંફર
મા ંભેળ
અને કં
પાણી ઉ
nmental Impa
T. R. AssoNABET A
પ્રવિૃ મા
ઓ મા ંડહોળ
પાણી પીવાલ
ી જ ર યાત
િવત પરીયોજ
થ ુવપરાશ મ
૭ િકલોલીટર
ટલુ ં પાણ
વામા ંઆવશે
ણીનો ઉદભવ
િવત પરીયોજ
થ ુગદંા પાણી
િવત પરીયોજ
ઉન, કુલીંગ
િનકળશે. રેઝી
ણી િનકળશે
૧ રી ક્ટ,
ીટર/િદવસ
રીથી વાપર
ળવવામા ંઆ
ડે સેટને આ
ઉદભવશે નિ
act Assessmen
ociates (AhmeAccredited
ાટે યોગ્ય છે
ળાશ અને બ
લાયક પાણી
:-
જના માટે
માટે ૪.૫ િક
ર/ િદવસ
ણી વપરાશે
.
વ અને ગદં
જના માથંી
ણીનો િનકાલ
જનામા ં કુલ
ટાવર પ ,
ઝીન ઉ પાદન
શ તેનુ ંપ્રાથિ
બોઈલર
રહશેે ને આ
વામા ંઆવ
આવશે. અંતમ
આર.ઓ. -૧
િહં અને એક
nt Report
edabad)
છે. કેટલાક
બૅક્ટેરીયા જો
ીની ગણુવ
પાણીનો કુ
કલોલીટર/ િ
ટલુ ંપાણી
શે. પ્ર તાિવ
ાપાણીનો િન
૪ િકલોલીટ
લ સે ટીંક ટક
૧૫.૭ િકલો
આર.ઓ. રી
ન પ્રિકયા અ
િમક શિુ કર
લો ડાઉન,
આર.ઓ. -
શે અને રી
મા ંઆ ગદંા
મા ંરીસાયક
મ ઝીરો ડી
થળોના ભ
જોવા મળેલ
ાના ધારાધો
કુલ વપરાશ
િદવસ ટલુ
તેમજ ગ્રીન
િવત પરીયોજ
િનકાલ:-
ટર/િદવસ
ક/સોક્પીટ સ
લોલીટર/િદવ
રી કટ, ઉ પ
અને વોશીંગન
ણ કેમીકલ
કુલીંગ ટાવ
૨ મા ંલઈ
ક્ટ ને પ્રાય
પાણીને ઈ
કલ કરવામ
ચા રહશેે
Taluka: Li
ભગૂભર્ જળ
લ છે તે િસવ
ધોરણો (આઇ
શ ૫૧ િકલ
લુ ંપાણી વપ
ન બે ટ ડેવલ
જના માટે
ટલુ ંઘરગ
સી ટમ ારા
વસ ટલુ ં
પાદન પ્રિકય
નુ ં૧.૬ િકલો
ઓકસીડેશન
વર પ નું
જવામા ંઆ
યમરી ટ્રીટેડ
ઈવોપરેટરમાં
મા ંઆવશે
.
Survey No
imbdi, District
Execut
તેમજ જમી
વાય ભગૂભર્
.એસ. ૧૦૫
લોલીટર/િદ
પરાશે યારે
લોપમે ટ મા
જ રી પા
ગ થ ુગદું પ
ા કરવામા ંઆ
ઓ ોિગક ગ
યા અને વોશ
લોલીટર/િદવ
ન ારા કરવ
નુ ંઓ ોગીક
આવશે, પરમી
ડ ગદંાપાણી
ા બા પીભવ
થી આ પ્રિ
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
મીન પરના
જળ તેમજ
૫૦૦) ની મજુ
વસ રહશેે
ર ઓ ોિગક
ાટે ૯.૫ િકલો
ાણી બોરવે
પાણી ઉદભવ
આવશે.
ગદું પાણી
શીંગ વી પ્ર
વસ ટલુ ંઓ
વામા ંઆવશે
ક ગદું પાણી
મીએટ ને આ
ી સાથે હો
વન કરવામાં
િકયામાથંી ક
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 12
પાણીના
જ જમીન
જબ છે.
માથંી
વપરાશ
લોલીટર/
લ ારા
વશે. આ
બોઈલર
પ્રિકયાઓ
ઓ ોિગક
શે. આર.
ણી ૧૪.૧
આર.ઓ. -
ડીંગ ટક
ા ંઆવશે
કોઈ ગદું
Environ
૪. જમ
કામગીર
આડકત
હવાના
આડઅસ
મા ં લ
માત્રા (
ન ધનીય
અતે્ર ન
આડઅસ
ઘન કચ
લેવામા ં
૫. વ
અ યાિસ
ચકાસણ
માકં
૧
૨
૩
૪
nmental Impa
T. R. AssoNABET A
મીન પયાવ
રી તબક્કા
તરી અસરો થ
પ્રદૂષણને ર
સર થશે નિ
લા ટના કામ
(Ground Le
ય આડઅસર
ન ધનીય છે
સર થશે નિહ
ચરાને સભંા
આવશે થ
િન પયાવ
િસત કે્ષત્રમા ં
ણી કરવામા ં
ક થળ
ો ટ સ
કાનપરા
પાણશીણ
બાજરડા
act Assessmen
ociates (AhmeAccredited
વરણ
દર યાન હ
થાય છે.
રોકવા માટે
િહં. હવાના
મગીરી તબ
evel Conce
ર થશે નિહ.ં
કે ગદું પા
િહં.
ાળવા, સગં્ર
થી ઘન કચર
વરણ :-
પ્રવતર્માન
આવી હતી.
સાઈટ
ણા
nt Report
edabad)
હવા, પાણી,
જ રી બધ
પ્રદૂષણથી
બક્કા દર યા
entration) ન
ાણી જમીન
હ કરવા અ
રાને કારણે જ
વિનનુ ંમા
ના પરીણ
ઘ ઘાટ ુ ત( દવસ
માપન
૬૩.૪
૪૭.૪
૪૯.૪
૫૨.૮
, ઘનકચરા
ધાજ પગલા
જમીન પર
ાન જમીન ન
ના પરીણામ
પર છોડવ
અને તેના િ
જમીન પર
ાપદંડ કાઢવ
ણામો નીચે
તર (Leq) in સ દર યાન)
વીકાય મ
૭૫
૫૫
૫૫
૫૫
Taluka: Li
ના પ્રદૂષણ
લેવામા ંઆ
સીધી અથ
ની સપાટી
મો પરથી ક
વામા ંઆવતુ
િનકાલ માટે
કોઈ આડઅ
વા માટે ૮ અ
પ્રમાણે છે.
dBA ઘ
મયાદા મ
૫
૪
૩
૩
Survey No
imbdi, District
Execut
ણથી જમીન
આવશે થી
થવા આડકત
પર હવાના
કહી શકાય
તુ ંનથી થી
ટના દરેક િ
અસર થશે ન
અલગ- અલ
ઘ ઘાટ ુ ત(રા ી
માપન
૫૭.૪
૪૩.૦
૩૯.૧
૩૮.૧
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
પર સીધી
જમીન પર
તરી અસરો
ા િવિવધ પ્ર
કે જમીન પ
થી જમીન પ
િનયતં્રીત પ
નિહં.
લગ થળે ઘ
તર (Leq) in dદર યાન) વીકાય મય
૭૦
૪૫
૪૫
૪૫
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 13
અથવા
કોઈ જ
થાય છે
પ્રદૂષકોની
પર કોઈ
પર કોઈ
પગલાઓ
ઘ ઘાટની
dBA
યાદા
Environ
માકં
૫
૬
૭
૮
ઘ ઘાટન
મજુબ છે
૬. સામ
સામાજી
મહ વની
વ તીનુ ં
પ્ર તાિવ
રોજગાર
દુકાનોમ
આ લ
પસદંગી
થાિનક
આજુબા
nmental Impa
T. R. AssoNABET A
ક થળ
કટાર યા
રળોલ
જશમતપ
દવપરા
ની ચકાસણી
છે.
મા ક-આ
ક અથર્ ય
ની િવગત છે
પ્રમાણ, કા
િવત પરીયોજ
રી પ્રા ત થ
મા ંવગેરેમા ં
લા ટની કામ
ી કરવામા ં
લોકોની આ
ાજુના િવ તા
act Assessmen
ociates (AhmeAccredited
ા
પર
ીના પિરણામ
િથક પયાવ
થાનો અ
છ. આ કારણ
મગીરીનો પ્ર
જનાને કારણે
થશે. પ્ર તાિવ
રોજગારીની
મગીરી માટે
આવશે. આ
આિથર્ક પિરિ
ારમા ંસાક્ષર
nt Report
edabad)
ઘ ઘાટ ુ ત( દવસ
માપન
૫૦.૭
૪૬.૭
૫૧.૧
૪૫.૪
મ પરથી તા
વરણ:-
યાસ એ પ
ણસર અ યા
પ્રકાર વગેરે
ણે કુલ ૬૫
િવત પરીયોજ
ી તકો ઉભી
જ ર લાગે
આજુબાજુના
િ થતી સધુર
તા, આરોગ્ય
તર (Leq) in સ દર યાન)
વીકાય મ
૫૫
૫૫
૫૫
૫૫
ારણ કાઢી શ
પયાર્વરણ ૃ
ાિસત કે્ષત્રમ
જી લા વ ત
ટલા કુશ
જનાને કારણે
થશે.
ગે યા ં થા
િવ તારમાં
રશે અને તે
ય અને રહણે
Taluka: Li
dBA ઘ
મયાદા મ
૪
૪
૪
૪
શકાય કે ઘ
ૃ થકરણ અ
મા ંસામાજીક
તીગણતરી પ
શળ અને અ
ણે આડકતરી
ાિનક લોકોન
ા ધધંાની ઉ
તથી એકમને
ણીકરણીમા ંસ
Survey No
imbdi, District
Execut
ઘ ઘાટ ુ ત(રા ી
માપન
૪૨.૨
૪૦.૬
૪૧.૭
૪૪.૦
ઘાટ ુ તર
અસર અ યા
અથર્ ય થ
પિુ તકામાથંી
ધર્કુશળ કાર
રી રીતે વી
ની તેમની
ઉ વળ ત
ન કારણે હકા
સધુારો થશે.
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
તર (Leq) in dદર યાન) વીકાય મય
૪૫
૪૫
૪૫
૪૫
ર િનયત ધા
ાસ માટેની
થાની માિહતી
થી મેળવેલ છે
રીગરોને સી
વી કે વાહન
કુશળતાના
તકોને કારણે
ારા મક અસ
.
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 14
dBA
યાદા
ારાધોરણ
ખબૂ જ
તી વીકે
છે.
ીધી રીતે
વહાર,
આધારે
ણે યાનંા
સર થશે.
Environ
૭. વ
અ યાિસ
અને પ્રા
અ યાિસ
કરંજ, ખ
કે્ષત્રના
અ યાિસ
પોપટ,
પાલતુ ંપ્ર
નોળીયો
૮. સોલ
મખુ્ય હે
થેલીઓ
ઈટીપી
આવશે.
નકામી
કાબર્નને
વે ટના
મેનેજમે
નહી.
૯. પય
પયાર્વર
બનાવવ
nmental Impa
T. R. AssoNABET A
વ પ ર થત
િસત કે્ષત્રનો
ાણી-પક્ષીઓ
િસત કે્ષત્રમા ં
ખીજડો અને
મખુ્ય ખેતીલ
િસત કે્ષત્રમા ં
કાગડો, મો
પ્રાણીઓ ઉપ
ો, સસલા અ
લીડ વે ટ
હઝેાડર્સ વે ટ
ઓ અને ડ્રમ,
કચરાનો +
વપરાયેલું
થેલીઓ અ
ને કોમન ઈ
સગં્રહ મા
મ ટ પિ ત
યાવરણીય
રણ પર થ
વામા ં આવેલ
act Assessmen
ociates (AhmeAccredited
તી અને
િવ તાર મુ
ઓની િવિવધત
થાિનક વન
ન કેસડુો જોવ
લાયક પાકો
સામા ય
ોર, બગલો,
પરાતં જ ં
અને જગંલી સ
મેનેજમે ટ
ટમા ંઈટીપી
એજ કટીંગ
+ ઈવેપોરેશ
ુ ઓઈલ
અને ડ્રમ મજૂં
સીનરરેશન
ાટે અલગ
પરૂતી હશે
યવ થાપ
તી આડઅસ
લ છે. આ
nt Report
edabad)
વ િવિવધ
મખુ્ય વે ખેત
તા બહ ુઓછ
ન પિતની પ્ર
વા મળેલ છે
છે.
રીતે દેખાત
, કાકંણસાર
ગલી સ તન
સવુરનો સમ
ટ :-
ી કચરો +
વે ટ અને
શન રેસીડ ુ
યબુ્રીકે ટ ત
જૂર થયેલ વે
ન ફેસીલીટી
જગ્યા ફાળ
અને હઝાડર્
પન યોજન
સરોને રોકવ
આ પયાર્વરણ
ધતા શા :-
તીલાયક જમ
છી જોવા મળે
પ્રજાિતઓ
છે. કપાસ, એ
તા પક્ષીઓમ
ર, કલકલીય
ન પ્રાણીઓ
માવેશ થાય
ઈવેપોરેશન
પે ટ કાબર્ન
નો મજુંર
તરીકે પનુઃ
વે ડર ને વે
ી (CHWIF)
ળવશે આથી
સ વે ટ ના
ના:-
વા/નાથવા
ણીય યવ
Taluka: Li
-
મીન ધરાવે
ળેલ છે.
વીકે બાવળ
એરંડા, ચોખ
મા ંચકલી,
યો જોવા મ
જોવા મળેલ
છે.
ન રેસીડ ,ુ વ
નનો સમાવેશ
થયેલ TS
વપરાશે અ
વચાશે અને
) મા ંમોકલ
થી એકમ
લીધે પયાર્
માટે પયાર્
થાપન યોજ
Survey No
imbdi, District
Execut
વ છે. આ િવ
ળ, લીમડો, અ
ખા, ઘઉં અને
કબતૂર, હો
મળે છે. અ
લ હતા ંતેમાં
વપરાયેલુ ંઓ
શ થાય છે.
DF Site મ
અથવા રીસ
એજ કટીંગ
લવામા ંઆવ
ારા અપાયે
વરણ પર ક
વરણીય ય
જનામા ં પય
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
િવ તારમા ંવ
અરડસૂો, ગુ
ને જુવાર અ
ોલો, કોયલ
યાિસત િવ
ા િનલગાય,
ઓઈલ અને
મા ં િનકાલ
સાઈકલરને
ગ વે ટ તેમજ
વશે. એકમ
યેલી હઝેાડર્
કોઈ આડઅ
યવ થાપન
યાર્વરણને
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 15
વન પિત
લુમહોર,
અ યાિસત
, કાબર,
િવ તારમા ં
િશયાળ,
ન નકામી
કરવામા ં
વેચાશે,
જ પે ટ
હઝેાડર્સ
સ વે ટ
અસર થશે
યોજના
યથાવત
Environ
જાળવવ
વા કે
પયાર્વર
ન લાગે
કરવામાં
આ પય
એકમની
૧૦. પ
પયાર્વર
ઓળખવ
આ હતે ુ
ચકાસણ
માપદંડ
૧૧. જો
જોખમ
રસાયણો
રક્ષા મક
૧૨. ી
આશરે
કરવામાં
અ ટકાવ
ગ્રીનબે
nmental Impa
T. R. AssoNABET A
વા માટે અને
ક ગ્રીન બે
રણીય ઘટકો
ગ તેવા તકેદ
ા ંઆવે છે.
યાવરણીય ય
ની રચના કર
પયાવરણીય
રણીય પિરબ
વા માટે મદ
થી પયાર્વર
ણી, ચીમનીમ
ની ચકાસણી
જોખમનીઆ
આકારણીનો
ણોનો સગં્રહણ
ક સાધનો ક
ીન બે ટ
કુલ ૬,૯૧
ા ંઆવશે કે
વવા વા
ટ તરીકે િવ
act Assessmen
ociates (AhmeAccredited
ને પ્રદૂષકોને
ટ ડવેલપ
ોની ચકસણી
દારીના પગલ
ય થાપન ય
રવામા ંઆવ
ય ચકાસણ
બળોની ચક
દદ પ થશે.
રણીય યવ
માથંી િનકળ
ણી કાયદામા ં
આકારણી:-
નો અ યાસ
ણ અને િનય
ારીગરો ને આ
ડવલપમે
૫ ચો.મી.
ક વિન
કે્ષત્રોમા ં મદ
િવકસાવવામાં
nt Report
edabad)
ને િનયતં્રીત
કરવો અને
ી યોજનાનો
લા લેવા અ
યોજનાના અ
વશે.
ણી યોજના:
ાસણી િવિવ
થાપન યોજ
ળતા પ્રદૂષકો
જણા યા મુ
જોખમી ર
યતં્રણ MSDS
આપવામા ંઆ
ટ :-
ટલો ગ્રીન
પ્રદૂષણ ત
દદ પ થશે
ા આવશે.
ત માત્રામા ં ર
ને તેનુ ં જત
અમલ કરવ
અને આગ ન
અસરકારક અ
:-
વધ થળોએ
જનાના પાલ
કો તથાપાણ
મજુબ કરવામ
સાયણો મા
S ની માગર્
આવશે.
ન બે ટ િવ
તથા હવા પ્ર
શ. કુલ પ્રો
Taluka: Li
રાખવા માટે
તન કરવુ,ં
વો, વરસાદ
ાથવાના સા
અમલીકરણ
એ પયાર્વરણી
લન માટે આ
ણીનુ ં પયાર્વ
મા ંઆવશે.
ટે કરવામા ં
ગદિશર્કા હઠેળ
િવ તાર પ્રો
પ્રદૂષણ નાથ
ક્ટ િવ તા
Survey No
imbdi, District
Execut
ટ જ રી અને
કામદારોની
ના પાણીનો
ાધનો રાખવ
માટ પયાવ
ણીય અસરો
આસપાસની
રણની ચકા
આવેલ છે
ળ કરવામા ં
ક્ટ સાઈટ
થવા, જમીન
ારના ૩૯
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
ને યોગ્ય પ
ની યોગ્ય સ
ો સગં્રહ કરવ
વા વગેરેનો
વરણીય ય
તથા તેના
હવાની ગણુ
ાસણી તેમજ
છે. બધા જ
આવશે. ય
ટની અંદર
નનુ ંપ્રદૂષણ/
% ટલો
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 16
પગલાઓં
સલામતી,
વો, આગ
સમાવેશ
થાપન
ફેરફારો
ણવ ાની
જ વિન
જોખમી
યિક્તગત
ડેવલોપ
/ધોવાણ
િવ તાર
Environ
૧૩. ો સિૂચત િવકાસ, સિૂચત તબક્કા પ્રો ક્ટ આિથર્ક
૧૪.ઉપ
આ
આથી અપયાર્વરપર થત
nmental Impa
T. R. AssoNABET A
ો ટ થી
પ્રો ક્ટ આરોજગાર અ
પ્રો ક્ટ કુશદરિમયાન ારા રોજગિવકાસ માટે
પસહંાર :-
પયાર્વરણ અ હવાની
તમામ કોઈ ઈકો જળ પય થાિનક િવિવધ
ધામીર્ક પયાર્વર
ઘડવામધારાધોસિુનિ ત
પયાર્વરપગલા ં
અનમુાન કરરણીય ય થતી અસરોને
act Assessmen
ociates (AhmeAccredited
થતા લાભ
આસપાસના અને અ ય ફ
શળ, અધર્કુશરોજગારી આ
ગાર મળી શ ેટ કરાશે.
અસર પ ૃ થગણુવ ા પપગલા લેવકોલોજીકલ નયાર્વરણ પર રોજગારીનપયાર્વરણીતથા ઐતીહરણીય યવમા ં આવી છેરણ કરતા ત કરવામા ંરણ ય થાલેશે.
રી શકાય કેથાપન યોજઘટાડી શકા
nt Report
edabad)
ભો:-
િવ તારના ાયદાઓની
શળ અને િબઆપવાની ક્ષકે છે. આ પ્રો
કરણ અ યપર નજીવી વામા ંઆવશેનકુશાન થશેર કોઈ પ્રિતકૂની તકો વધશય પિરમાણોહાિસક થળોથાપન યોજછે. અને આવધી ના આવે છે. પન એકમ
ક બાધંકામજના અને શમાશે.
સમદુાયનાદ્રિ ટએ લાભ
બનકુશળ કારક્ષમતા ધરાપ્રો કટ કુલ
યાસ પરથી કઅસર થાય. શે નિહ. કળૂ અસર થશે. ણો વા કે ો પર કોઈ અજના બધા આ પિરણામોજાય એ મ
સિૂચત પ્રો
મ અને કામગમનના પગલ
Taluka: Li
ા અથવા મભદાયી બન
રીગરો ને બવે છે. કુલનફાના ૨.૫
કહી શકાય કેય છે. જો કે
થશે નિહ.
જગંલ, રા ટ્રઅસર થશે નપ્રદૂષણ પિમો સબંિધતમાટે પયાર્વ
કટની શ આ
ગીરી તબક્કલાનંા હકારા
Survey No
imbdi, District
Execut
માળખાકીય શે.
બાધંકામ તબ૬૫ ટલા ૫% ટલો ખ
કે... હવા પ્રદૂષ
ટ્રીય બગીચનિહ. િરમાણોને િનત સ ાિધકાવરણ ય થ
આત પછી
ક્કા દરિમયાના મક અમલી
M/s. N
o. 1458, Villag
t: Surendranag
tive Summary
િવકાસ, સ
બક્કા અને કયિક્તઓને
ખચર્ સામાજી
ષણ િનયતં્રણ
ચા, અ યાર
િનયિંત્રત કરરો ારા થાપન એક
પ્રદૂષણ િન
ન મકૂવામાંલીકરણથી પ
NN Polymers
ge: Panshina,
gar, Gujarat.
y - Gujarati 17
સામાજીક
કામગીરી ને સિૂચત જીક તેમજ
ણ માટેના
ય અને
રવા માટે થપાયેલ કમ ારા
યતં્રણના ં
ા આવેલ પયાર્વરણ
TOR
&
IT’S COMPLIANCE
Environm
Point wis
J‐11011/3
manufact
Formalde
Limbdi, D
A tabula
Sr.
No.
A
1 P
is
m
t
E
t
f
c
2 Z
b
3 R
t
a
b
T
4 Bs
mental Impact
T. R. AssocNABET Ac
TERM
se complian
337/2016‐IA
turing of
ehyde Resin
District: Sure
ar chart with
TO
Public heari
ssues raise
made by the
the same s
EIA/EMP Re
tabular char
for com
commitmen
Zero Liquid
be adopted.
Revised layo
to be deve
around the
boundary w
Trees.
Briquettes ssource.
t Assessment R
ciates (Ahmedccredited
MS OF
ce to the TO
A II (I) dat
Melamine
n as well as
endranagar,
h index for
OR Conditio
ng to be co
ed and co
e project pr
should be
eport in t
rt with fina
plying w
nts made.
Discharge
.
out in whic
loped for
e periphe
with Neem, S
shall be use
Report
dabad)
REFERE
OR points is
ted 29th Ap
Formaldeh
Laminated
, Gujarat.
point wise c
on
nducted an
ommitment
roponent o
included i
he form o
ncial budge
with th
system wi
ch Greenbe
10 m widt
ery of th
Sesam, Tea
ed as a fue
ENCE (T
ssued by EA
pril, 2017 (
hyde Resin
Sheets at S
compliance
Additiona
d
ts
n
n
of
et
e
We hav
Minutes
with
budgeta
be incor
public c
ll We will
is given
‐ 2.
lt
h
e
k
Please r
for revis
wide gre
the proj
Please a
10 for d
for gre
Neem, S
el We are
and w
Briquett
Taluka: Limb
TOR) CO
AC, MoEFCC
(attached a
n, Phenol
Survey No.:
is as given
Complia
al TOR
ve taken
s of public
commitme
ary allocatio
rporated in
onsultation
adopt ZLD s
in Section 2
refer Figure
sed plant la
eenbelt aro
ject.
also refer Ta
details of p
enbelt dev
Shisham and
agree to t
would only
tes as a fuel
Survey No. 1
bdi, District: Su
OMPLIA
C, New Delh
as Annexur
Formaldeh
1458, Villag
below:
nce Status
note of th
c consultati
ents mad
on for the
EIA report
.
system and
2.11.1 (A) o
e 2.5 of Ch
ayout show
ound the pe
able 10.1 of
lant species
velopment
d Teak trees
the stated
y use Ag
l source.
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
ANCE
hi vide their
re ‐ 1) for
yde Resin
ge: Panshin
he same.
ion along
de and
same will
t after the
the same
of Chapter
hapter ‐ 2
wing 10 m
riphery of
Chapter ‐
s selected
including
s.
condition
ro‐waste/
Polymers
Panshina,
, Gujarat.
mpliance 1
letter no.
proposed
& Urea
na, Taluka:
Page
No.
‐‐
2.26
2.8
10.11 ‐ 10.12
‐‐
Environm
Sr.
No.
5 S
m
c
o
E
b
j
r
t
1 E
2 In
i.
ii
ii
3 P
i.
ii
ii
mental Impact
T. R. AssocNABET Ac
TO
Source of w
mentioned
concerned
obtained pr
EC. Possibilit
be explo
ustification
requirement
the EIA/EMP
AN
Executive Su
ntroduction
Details o
including
. Informat
propone
i. Importan
project
Project Desc
Cost of
completio
. Product w
proposed
i. If expans
existing p
and whe
available
reference
t Assessment R
ciates (Ahmedccredited
OR Conditio
water shal
and app
authority
rior to sub
ty of fresh w
ored and
for exis
t to be m
P report.
NNEXURE ‐
ummary
n
of the EIA
g NABET acc
tion about
ent.
nce and be
cription
project &
on
with capaci
d project
sion project
products wit
ther adequ
for
e of earlier E
Report
dabad)
on
l be clearl
proval from
shall b
bmission fo
water use t
d prope
sting wate
mentioned i
I : GENERIC
A Consultan
creditation.
the projec
nefits of th
& time o
ities for th
t, details o
th capacitie
uate land i
expansion
EC if any
ly
m
e
or
o
er
er
n
We hav
CGWB
groundw
same is
Please
project
requirem
describe
2.
C TOR WITH
Executiv
both En
been inc
nt
Details
incorpo
report.
is attach
ct Refer Se
e Refer Se
of Refer Se
e Refer Se
of
es
is
n,
Not ap
project.
Taluka: Limb
Complia
ve already
for obtain
water abstr
attached as
note that
and details
ment for t
ed in Sectio
H RESPECT T
ve summar
nglish & Gu
corporated
of EIA co
rated in Ch
NABET acc
hed as Anne
ection 1.3 in
ection 1.4 in
ection 2.4 of
ection 2.5 of
plicable as
Survey No. 1
bdi, District: Su
nce Status
made appl
ning permi
raction. Pro
s Annexure
this is a
s of total fre
he entire
n 2.11.1 of
TO INDUSTR
ry of the p
ujarati lang
in the EIA r
onsultant h
apter – 12 o
reditation c
exure – 8.
n Chapter ‐ 1
n Chapter ‐ 1
f Chapter ‐
f Chapter ‐
this is a
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
ication to
ssion for
oof of the
– 3.
proposed
esh water
project is
Chapter –
RY SECTOR
project in
guage has
report.
has been
of the EIA
certificate
1
1
2
2
proposed
Polymers
Panshina,
, Gujarat.
mpliance 2
Page
No.
‐‐
2.23 ‐
2.25
‐‐
12.1‐
12.4
1.2
1.2 ‐1.3
2.7
2.9
‐‐
Environm
Sr.
No.
iv
v
v
v
v
mental Impact
T. R. AssocNABET Ac
TO
v. List of r
and thei
mode of t
v. Other ch
required
storage ca
vi. Details o
hazardou
their man
vii. Requirem
with sour
approval,
diagram,
requirem
contract)
viii. Proc
with ma
machiner
t Assessment R
ciates (Ahmedccredited
OR Conditio
aw materia
ir source
transportati
hemicals &
with qua
apacities
of emission
s waste gen
nagement.
ment of wa
rce of supp
water
ent (reg
cess descri
ajor equip
ries, process
Report
dabad)
on
als require
along wit
ion.
& material
antities an
n, effluents
neration an
ater, powe
ply, status o
balanc
man‐powe
gular an
ption alon
pments an
s flow shee
d
h
Refer Se
ls
d
Refer Se
s,
d
Details
flue gas
2.11.2 o
Details
effluent
Chapter
Details
& their
2.11.3 o
r,
of
e
er
d
Refer Se
the det
water b
It may
made
obtainin
abstract
attached
Refer Se
the det
its sourc
Refer Se
the deta
g
d
et
Process
flow dia
in Sectio
Taluka: Limb
Complia
ection 2.5 a
ection 2.5 a
of air emiss
s emission
of Chapter ‐
of dome
t is given i
r ‐ 2
of hazardo
manageme
of Chapter ‐
ection 2.11
ails of wat
alance diag
be noted th
application
ng permissi
tion. Proof
d as Annexu
ection 2.9.1
ails of pow
ce.
ection 2.9.2
ails of man‐
description
agram and m
on 2.6 of Ch
Survey No. 1
bdi, District: Su
nce Status
and 2.7 of C
and 2.7 of C
sion i.e. pro
is given i
2
estic and
in Section
us waste g
nt is given
2
.1 of Chapt
er consump
ram.
hat we hav
n to CG
on for gro
f of the
ure – 3.
1 of Chapte
wer requirem
2 of Chapte
power requ
n along wit
mass balanc
hapter ‐ 2
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
hapter ‐ 2
hapter ‐ 2
ocess and
n Section
industrial
2.11.1 of
generation
in Section
ter ‐ 2 for
ption and
ve already
GWB for
oundwater
same is
er ‐ 2 for
ment and
er ‐ 2 for
uirement.
h process
ce is given
Polymers
Panshina,
, Gujarat.
mpliance 3
Page
No.
2.9 &
2.18
2.9 &
2.18 –
2.19
2.28 –
2.32
2.23 –
2.27
2.32 –
2.33
2.23‐
2.25
2.20
2.20‐
2.21
2.10 –
2.17
Environm
Sr.
No.
ix
x
mental Impact
T. R. AssocNABET Ac
TO
(quantitie
products
x. Hazard id
of propos
. Expansion
proposals
a. Copy o
Cleara
Amend
obtain
MOEF/
attach
certifie
Monito
Region
Minist
Forest
30th M
of com
stipula
enviro
includi
be pr
status
Consen
ongoin
the pr
be att
EMO r
b. In cas
has
enviro
reason
under
EIA No
t Assessment R
ciates (Ahmedccredited
OR Conditio
es) from raw
to be provid
dentification
sed safety sy
n/moderniz
s:
of all the En
nce(s)
dments
ed for the p
/SEIAA
ed as an A
ed copy of
oring Repo
nal Office
ry of Enviro
as per cir
May, 2012 o
mpliance of
ated in all
nmental
ing Amend
rovided. I
of com
nt to Oper
ng/existing o
roject from
tached wit
eport.
e the exis
not
nmental
ns for not
the provis
otification 1
Report
dabad)
on
w material t
ded.
n and detail
ystems.
ation
nvironmenta
includin
theret
project from
shall b
Annexure. A
f the lates
ort of th
e of th
onment an
rcular date
on the statu
f condition
the existin
clearance
ments sha
n addition
mpliance o
rate for th
operation o
m SPCB sha
th the EIA
sting projec
obtaine
clearance
t taking E
sions of th
1994 and/o
o Major e
given in
ls Refer Se
‐ 7.
al
g
o
m
e
A
st
e
e
d
d
us
ns
g
es
ll
n,
of
e
of
ll
A‐
ct
d
e,
C
e
or
Not ap
project
Taluka: Limb
Complia
equipments
Section 2.9
ection 7.3.2
plicable as
Survey No. 1
bdi, District: Su
nce Status
s & machin
9.5 of Chapt
and 7.3.3 o
this is a
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
neries are
ter ‐ 2
of Chapter
proposed
Polymers
Panshina,
, Gujarat.
mpliance 4
Page
No.
2.21‐
2.22
7.4‐
7.13
‐‐
Environm
Sr.
No.
4 S
i.
ii
ii
iv
mental Impact
T. R. AssocNABET Ac
TO
EIA No
provid
to Es
Certific
Operat
operat
Notific
CTO
obtain
be
compli
condit
the SP
Site Details
. Location
covering
Tehsil,
Justificat
site, wh
consider
i. A topo
area o
and
1:50,000
A3/A2
eco‐sens
environm
places.
ii. Details w
selection
v. Co‐ordin
four corn
t Assessment R
ciates (Ahmedccredited
OR Conditio
otification 2
ed. Copies
stablish/No
cate and
te (in cas
ting prior
cation 2006
of FY
ed from th
submitted.
iance repo
ions of con
CB shall be
of the p
g village,
District a
tion for se
ether othe
red.
osheet of
f radius
site loc
0/ 1:25,000
sheet. (In
sitive ar
mentally
w.r.t. option
n of site.
nates (lat‐lo
ners of the s
Report
dabad)
on
2006 shall b
of Consen
Objectio
Consent t
se of unit
r to EIA
6, CTE an
2005‐2006
e SPCB sha
Furthe
ort to th
nsents form
submitted.
project sit
, Taluka
and State
electing th
r sites wer
the stud
of 10 km
ation o
scale on a
cluding a
reas an
sensitiv
n analysis fo
ong) of a
site.
e
nt
n
o
ts
A
d
6)
ll
r,
e
m
e
a/
e,
e
e
Refer Se
requisite
y
m
n
n
ll
d
e
A topos
area a
incorpo
Report.
or Refer Se
as Secti
report f
ll Refer Fi
EIA repo
Taluka: Limb
Complia
ection 2.2 o
e details.
sheet of the
along with
rated as Fi
ection 1.5 o
on 5.3 of C
or the requ
igure 1.1 o
ort.
Survey No. 1
bdi, District: Su
nce Status
of Chapter ‐
e 10 km rad
h site loc
igure 2.3 in
of Chapter ‐
hapter ‐ 5 o
isite details
f Chapter ‐
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
‐ 2 for the
dius study
cation is
n the EIA
‐ 1 as well
of the EIA
s.
‐ 1 of the
Polymers
Panshina,
, Gujarat.
mpliance 5
Page
No.
2.1‐ 2.6
2.4
1.3 ‐1.6
5.1‐5.2
1.3‐1.4
Environm
Sr.
No.
v
v
v
v
ix
x
mental Impact
T. R. AssocNABET Ac
TO
v. Google m
of the pr
vi. Layout
existing
proposed
storage
greenbe
located
area/Est
Industria
location
Industria
vii. Photogr
and exist
site.
photogra
greenbe
viii. Land use
of
{identifi
governm
agricultu
water b
shall be
for indu
x. A list of
name and
{10 km
incorpora
the study
x. Geologica
hydrolog
area shal
t Assessment R
ciates (Ahmedccredited
OR Conditio
map‐Earth
roject site.
maps
unit as
d unit
area, p
lt area, uti
within an
ate/Comple
al Area
of unit
al area/Esta
raphs of th
ting (if appl
If existi
aphs of
lt, in particu
e break‐up
the p
ed and
ment/privat
ural, forest,
odies, settl
included.(n
strial area).
f major ind
d type withi
m radius}
ted. Land u
area
al features
ical status o
l be include
Report
dabad)
on
downloade
indicatin
s well a
indicatin
plant area
ilities etc.
n Industria
ex, layout o
indicatin
within th
ate.
he propose
icable) plan
ng, show
plantation
ular.
of total lan
project sit
acquired
e‐
, wasteland
ements, etc
not require
dustries wit
n study are
shall b
use details o
s and Geo
of the stud
d.
d Refer Fi
EIA repo
g
as
g
a,
If
al
of
g
e
Refer Fi
EIA repo
the proj
d
nt
w
n/
Refer Fi
EIA repo
d
e
},
d,
c.
d
Refer Se
land use
Refer Se
the sali
project
h
ea
be
of
Refer Se
the requ
Land us
given in
o‐
dy
Refer Se
requisite
Taluka: Limb
Complia
igure 2.2 o
ort.
igure 2.5 of
ort for deta
ject.
igure 1.2 o
ort.
ection 2.3 o
e break‐up o
ection 2.2.3
ient feature
site.
ection 2.2.2
uisite detail
se details o
Section 3.7
ection 3.6 o
e details.
Survey No. 1
bdi, District: Su
nce Status
f Chapter ‐
f Chapter –
ailed Plant
f Chapter ‐
of Chapter ‐
of project si
3 of Chapte
es of the
2 of Chapte
s.
of the stud
7 of Chapter
of Chapter –
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
‐ 2 of the
– 2 of the
Layout of
‐ 1 of the
‐ 2 for the
ite.
er ‐ 2 for
proposed
er ‐ 2 for
dy area is
r ‐ 3
– 3 for the
Polymers
Panshina,
, Gujarat.
mpliance 6
Page
No.
2.3
2.8
1.4
2.7
2.6
2.5
3.34 ‐
3.40
3.28‐
3.33
Environm
Sr.
No.
x
x
x
5 F
i
ii
mental Impact
T. R. AssocNABET Ac
TO
xi. Details of
upto 5 km
the site i
any maj
season ri
flood oc
based on
the pas
Flood Le
and maxi
river sh
(mega gr
xii. Status of
acquisitio
stage of
and expe
possessio
xiii. R&R
land in
Governm
Forest and
. Permiss
the use
clearanc
recomm
Forest
applicab
i. Landuse
resolutio
(GPS) o
delineat
case o
forest la
t Assessment R
ciates (Ahmedccredited
OR Conditio
f Drainage o
m radius of s
s within 1 k
jor river, pe
ver discharg
ccurrence
n peak rain
t 30 year
evel of the
imum Flood
all also b
reen field pr
f acquisition
on is not
the acquisi
ected time
on of the lan
details in
n line w
ment policy
Wildlife rela
ion and a
of forest la
ce), if
mendations
Departm
ble)
e map bas
on satellit
of the pro
ting the fo
of projects
and more th
Report
dabad)
on
of the projec
study area.
km radius o
eak and lea
ge as well a
frequenc
fall data o
rs. Details o
project sit
d Level of th
e provided
rojects)
n of land.
t complete
ition proces
of complet
nd.
n respect o
with stat
lated Issues
approval fo
and (forestr
any, an
of the Stat
ment. (
ed on Hig
te imager
oposed sit
orestland (i
s involvin
han 40 ha)
ct
If
of
n
as
cy
of
of
te
e
d.
Refer Se
requisite
If
e,
ss
te
It may
lease. N
copy is a
of
te
Not app
(if applica
or
ry
d
e
if
Not App
h
ry
e
n
g
Not App
Taluka: Limb
Complia
ection 3.6 o
e details.
be noted
NA permiss
attached as
plicable
able):
plicable
plicable
Survey No. 1
bdi, District: Su
nce Status
of Chapter –
that the la
ion and Le
Annexure –
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
– 3 for the
and is on
ase Deed
– 2.
Polymers
Panshina,
, Gujarat.
mpliance 7
Page
No.
3.28‐
3.33
‐‐
‐‐
‐‐
‐‐
Environm
Sr.
No.
ii
iv
v
v
6 E
i
mental Impact
T. R. AssocNABET Ac
TO
ii. Status o
for ob
forestry
latest
submitte
v. The pr
within 1
Parks, S
Reserve
of Wild
propone
map d
Chief W
these f
project
recomm
commen
Warden
v. Wildlife
authent
Wildlife
Governm
of Sche
exists in
vi. Copy of
for cle
Wildlife
to the S
the Nati
Environmen
. Determin
inversion
and
meteorol
t Assessment R
ciates (Ahmedccredited
OR Conditio
of Applicatio
btaining th
clearance
status
ed.
ojects to
10 km of t
Sanctuaries
s, Migrato
d Animals,
ent shall
uly authen
Wildlife Ward
features v
location
mendations
nts of the C
n‐thereon
Conservati
icated by
Warden o
ment for c
edule I fau
the study a
f applicatio
earance
(Protection
Standing Co
ional Board
ntal Status
nation of
level at the
site‐specific
ogical d
Report
dabad)
on
on submitte
he stage
along wit
shall b
be locate
the Nationa
s, Biospher
ry Corridor
the projec
submit th
nticated b
den showin
vis‐à‐vis th
and th
o
Chief Wildlif
on Plan dul
the Chie
of the Stat
conservatio
una, if an
area
n submitte
under th
n) Act, 1972
ommittee o
for Wildlife
atmospheri
e project sit
c micro
ata usin
d
I
h
e
Not App
d
al
re
rs
ct
e
by
g
e
e
or
fe
Not app
is locate
project
ly
ef
e
n
ny
Not App
d
e
2,
of
e
Not App
ic
te
o‐
g
Site spe
are give
Taluka: Limb
Complia
plicable
plicable as n
ed within 1
site.
plicable
plicable
ecific micro‐
en in Annexu
Survey No. 1
bdi, District: Su
nce Status
no wild life
10 km radi
‐meteorolo
ure – 4.
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
sanctuary
us of the
gical data
Polymers
Panshina,
, Gujarat.
mpliance 8
Page
No.
‐‐
‐‐
‐‐
‐‐
‐‐
Environm
Sr.
No.
ii
ii
iv
v
mental Impact
T. R. AssocNABET Ac
TO
temperat
hourly wi
and rainfa
i. AAQ data
locations
NOX, CO
relevant
collected.
stations
guidelines
the p
direction,
sensitive
reserved
ii. Raw d
measurem
stations a
in the N
Nov. 200
max., ave
for each o
from dat
should
annexure
v. Surface w
River (10
downstre
and other
locations
guidelines
v. Whether
polluted
identified
CC, if yes
t Assessment R
ciates (Ahmedccredited
OR Conditio
ture, relativ
ind speed a
all.
a (except mo
for PM10,
and other
to the proj
. The
shall be b
s and take
pre‐domina
, populatio
receptors
forests.
ata of
ment for 12
as per freq
NAQQM No
09 along w
erage and
of the AAQ
ta of all A
be provid
e to the EIA
water qualit
00 m ups
eam of disc
r surface dr
as per CPC
s.
the site f
stretch
d by the CP
give details
Report
dabad)
on
ve humidity
and directio
onsoon) at
PM2.5, SO2
parameter
ject shall b
monitorin
based CPC
into accoun
nt win
n zone an
s includin
all AAQ
weeks of a
uency give
otification o
with – min
98% value
Q parameter
AAQ station
ded as a
Report.
ty of nearb
stream an
harge point
rains at eigh
CB/MoEF&C
alls near t
of rive
PCB/MoEF &
s.
y,
n
Refer Se
requisite
8
2,
rs
e
g
B
nt
d
d
g
Refer Se
requisite
Q
ll
n
of
.,
es
rs
ns
n
Refer T
requisite
Please r
of all AA
for all se
by
d
t)
ht
C
Refer T
surface
o
er
&
Not App
Taluka: Limb
Complia
ection 3.2.1
e details.
ection 3.2.2
e AAQ data
Table 3.6 o
e detail.
refer Annex
AQ measur
elected sam
Table 3.12
water quali
plicable
Survey No. 1
bdi, District: Su
nce Status
1 of Chapte
2 of Chapte
.
of Chapter
xure – 5 for
rement for
mpling statio
of Chapter
ity data.
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
er – 3 for
er – 3 for
– 3 for
r raw data
12 weeks
ons.
r – 3 for
Polymers
Panshina,
, Gujarat.
mpliance 9
Page
No.
3.2 ‐
3.6
3.7 –
3.11
3.10‐
3.11
‐‐
3.22 ‐
3.24
‐‐
Environm
Sr.
No.
v
v
v
ix
x
x
7 Im
i
mental Impact
T. R. AssocNABET Ac
TO
vi. Ground
minimum
included.
vii. Noiselocations
viii. Soil
CPCB guid
x. Traffic stu
vehicles,
for trans
additiona
proposed
arrangem
x. Detailed d
fauna (te
existing i
be given
to rar
endanger
I fauna
study
Conservat
prepared
xi. Socio‐eco
study are
mpact and
. Assessme
concentra
the stack
specific m
In case th
a hilly
Modelling
t Assessment R
ciates (Ahmedccredited
OR Conditio
water mo
m at 8 locati
e levels mowithin the s
characteris
delines.
udy of the a
frequency
portation o
al traffic
d project
ment etc.
description
errestrial a
n the stud
with speci
re, ende
red species.
are found
area, a
tion Plan
and furnish
onomic sta
a.
Environmen
ent of gr
ation of pol
emission ba
meteorologi
he project i
terrain,
g shall be
Report
dabad)
on
onitoring a
ions shall b
nitoring at study area.
stic as pe
area, type o
of vehicle
of materials
due t
t, parkin
of flora an
and aquatic
y area sha
al referenc
emic an
If Schedule
within th
a Wildlif
shall b
hed.
atus of th
nt Managem
round leve
lutants from
ased on site
cal features
s located o
the AQI
done usin
at
e
Refer T
ground
8 Refer Ta
Level M
er Refer Ta
Charact
of
es
s,
o
g
Refer S
traffic st
d
c)
ll
e
d
e‐
e
fe
e
Refer S
ecology
e Refer S
socio e
area.
ment Plan
el
m
e‐
s.
n
P
g
Please
Figure 4
4.12 of C
Taluka: Limb
Complia
Table 3.11
water quali
able 3.9 of C
onitoring D
able 3.14 of
eristic Data
Section 3.10
tudy data.
ection 3.8
& biodivers
ection 3.9
economic s
refer Sect
4.1, 4.2 & 4.
Chapter – 4
Survey No. 1
bdi, District: Su
nce Status
of Chapter
ty data.
Chapter – 3
Data.
f Chapter –
.
0 of Chapt
of Chapte
sity study d
of Chapte
status of t
ion 4.8 as
.3 & Table 4
4 for requisit
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
r – 3 for
for Noise
3 for Soil
ter 3 for
r – 3 for
ata.
r – 3 for
the study
s well as
4.10, 4.11,
te details.
Polymers
Panshina,
, Gujarat.
mpliance 10
Page
No.
3.19 ‐
3.21
3.14 ‐
3.15
3.27
3.67‐
3.68
3.46‐
3.58
3.54‐
3.66
4.18 ‐
4.24
Environm
Sr.
No.
ii
ii
iv
mental Impact
T. R. AssocNABET Ac
TO
inputs o
character
the pote
project o
impact
emissions
transport
the area
Details o
the inp
modelling
The air q
plotted
showing
site, habit
receptors
i. Water Q
case of di
ii. Impact o
raw mate
on the su
shall be a
In this
transport
finished
(large qu
cum road
cum‐rail
examined
v. A note
wastewat
operation
reused f
shall be
t Assessment R
ciates (Ahmedccredited
OR Conditio
f the spe
ristics for
ential impa
n the AAQ.
of all s
s
tation) on
a shall be
f the mode
put data
g shall also b
uality conto
on a loc
the locatio
tation near
s, if any.
Quality mod
scharge in w
f the trans
erials and e
urrounding e
assessed an
regard, o
t of raw m
products
antities) by
d transport o
transport
d.
on tre
ter from dif
ns, extent r
for differen
included
Report
dabad)
on
cific terrai
determinin
acts of th
. Cumulativ
sources o
(includin
the AAQ o
e assessed
el used an
used fo
be provided
ours shall b
cation ma
n of projec
by, sensitiv
delling – i
water body
sport of th
end product
environmen
nd provided
options fo
materials an
and waste
y rail or rai
or conveyor
shall b
atment o
fferent plan
recycled an
nt purpose
. Complet
n
g
e
ve
of
g
of
d.
d
or
d.
e
p
ct
ve
n Not ap
discharg
of wate
e
ts
nt
d.
or
d
es
l‐
r‐
e
Refer S
requisite
of
nt
d
es
te
Refer Se
the requ
Taluka: Limb
Complia
pplicable,
ge from the
r body.
ection 4.9
e data.
ection 2.11
uisite detail
Survey No. 1
bdi, District: Su
nce Status
as no wa
e industry in
of Chapte
.1 of Chapt
s.
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
astewater
n any type
r – 4 for
ter ‐ 2 for
Polymers
Panshina,
, Gujarat.
mpliance 11
Page
No.
‐‐
4.24 ‐
4.25
2.23 ‐
2.27
Environm
Sr.
No.
v
v
v
v
ix
mental Impact
T. R. AssocNABET Ac
TO
scheme o
Character
treated e
prescribe
discharge
v. Details o
action p
emissions
vi. Measures
control
vii. Details
generat
utilizatio
Copies
utilizatio
hazardo
plant sh
EMP sh
of
recycle/
techniqu
conserv
resource
viii. Proper
shall be
Notificat
plan o
provided
x. Action pl
developm
i.e. land w
trees per
t Assessment R
ciates (Ahmedccredited
OR Conditio
of effluent
ristics of un
effluent to
d stand
e under E(P)
of stack em
plan for
s to meet st
s for fugiti
of hazard
ion and th
on and m
of MOU
on of
ous waste
hall also b
all include
waste‐m
/reuse/recov
ues,
ation, an
e conservat
utilization
ensured as
tion, 2009.
of action
d.
lan for the
ment plan in
with not les
r ha. Givin
Report
dabad)
on
t treatment
ntreated an
o meet th
dards o
Rules.
mission an
control o
tandards.
ve emissio
dous wast
heir storage
management
U regardin
solid an
in cemen
be included
the concep
minimization
ver
Energ
nd natura
ion.
of fly as
s per Fly As
. A detaile
shall b
e green be
n 33 % are
s than 1,50
g details o
t.
d
e
of
d
of
Refer Se
the requ
n Refer Se
the requ
e
e,
t.
g
d
nt
d.
pt
n,
gy
al
Refer Se
the requ
Refer Se
the deta
h
h
d
e
Refer Se
the EIA
lt
ea
0
of
Refer Se
detailed
Taluka: Limb
Complia
ection 2.11
uisite detail
ection 2.11
uisite detail
ection 2.11
uisite detail
ection 10.9
ails of clean
ection 10.4
report.
ection 10.5
d greenbelt
Survey No. 1
bdi, District: Su
nce Status
.2 of Chapt
s.
.2 of Chapt
s.
.3 of Chapt
s.
of Chapte
er producti
.2 of Chapt
of Chapter
developme
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
ter ‐ 2 for
ter ‐ 2 for
ter ‐ 2 for
r ‐ 10 for
on.
er ‐ 10 of
r – 10 for
nt plan.
Polymers
Panshina,
, Gujarat.
mpliance 12
Page
No.
2.28 ‐
2.31
2.31‐
2.32
2.32‐
2.33
10.23
10.9
10.11 –
10.12
Environm
Sr.
No.
x
x
x
x
mental Impact
T. R. AssocNABET Ac
TO
species,
planning
included.
around t
and a sc
the roads
shall also
. Action
harvestin
site sha
harvest ra
tops and
recharge
also to
activities
conserve
the wat
other sou
xi. Total ca
cost/ann
pollutio
shall be
xii. Action
environm
be subm
xiii. Onsite
(natural
Prepare
Manage
Risk Ass
control.
plan sh
District
Plan.
t Assessment R
ciates (Ahmedccredited
OR Conditio
width of
schedule e
The green
the projec
cheme for
s used for
be incorpo
plan for
g measure
all be su
ainwater fr
storm wat
the ground
use for t
at the pro
fresh water
er require
urces.
pital cost a
num for en
n control
included.
plan for
mental mon
mitted.
and Offsi
and
dness and
ement Plan
sessment a
Disaster m
hould be
Disaster M
Report
dabad)
on
plantation
etc. shall b
belt shall b
ct boundar
greening o
the projec
rated.
rainwate
es at plan
bmitted t
om the roo
ter drains t
d water an
the variou
oject site t
r and reduc
ement from
nd recurrin
nvironmenta
measure
post‐projec
nitoring sha
ite Disaste
Man‐made
Emergenc
n includin
and damag
managemen
linked wit
Managemen
n,
e
e
ry
of
ct
er
nt
o
of
o
d
us
o
e
m
Refer Se
the det
scheme
g
al
es
Refer Se
the EIA
ct
ll
Refer Se
EIA repo
er
e)
cy
g
e
nt
h
nt
Refer Se
7 of the
Taluka: Limb
Complia
ection 10.6
tail of rai
.
ection 10.10
report.
ection 6.2 o
ort.
ection 7.10
details.
Survey No. 1
bdi, District: Su
nce Status
of Chapter
n water h
0 of Chapte
of Chapter –
& 7.11 of C
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
r – 10 for
harvesting
er – 10 of
– 6 of the
Chapter –
Polymers
Panshina,
, Gujarat.
mpliance 13
Page
No.
10.12‐
10.21
10.23 –
10.24
6.2 ‐
6.3
7.37 –
7.50
Environm
Sr.
No.
8 O
i.
ii
ii
iv
mental Impact
T. R. AssocNABET Ac
TO
Occupationa
. Plan and
ensure th
& safety
casual wo
i. Details health s
worker. If
being eva
format,
Audiomet
testing (F
vision an
defect)
placemen
examinat
the same
month an
mentione
age, sex,
and depa
ii. Details of& Safety
exposure
whether
Permissib
If these a
measures
adopted
PEL so
workers c
v. Annual reworkers
to Occu
Safety.
t Assessment R
ciates (Ahmedccredited
OR Conditio
al Health
d fund al
he occupat
y of all co
orkers
of exposu
status eva
f the worke
aluated by p
chest
try, Spirom
ar & Near v
nd any o
ECG, du
nt and
ions give th
e. Details re
nalyzed dat
ed paramet
duration
rtment wise
f existing O
Hazards. W
levels of
they a
ble Exposure
re not with
s the com
to keep t
that hea
can be prese
eport of hea
with specia
upational H
Report
dabad)
on
llocation t
ional healt
ontract an
ure specifi
aluation o
ers’ health i
pre designe
x rays
metry, Visio
vision, colou
ther ocula
uring pre
periodica
he details o
egarding las
ta of abov
ters as pe
of exposur
e.
Occupationa
What are th
hazards an
are withi
e level (PEL
in PEL, wha
mpany ha
them withi
lth of th
erved
alth status o
al referenc
Health an
o
h
d
Refer Se
the EIA
ic
of
is
d
s,
n
ur
ar
e‐
al
of
st
ve
er
re
Not ap
project
al
e
d
n
).
at
as
n
e
It may b
project.
taken
commis
in the Se
of
e
d
Not ap
project
Taluka: Limb
Complia
ection 10.10
report.
plicable as
be noted th
Neverthele
by the
ssioning of t
ection 7.9 o
plicable as
Survey No. 1
bdi, District: Su
nce Status
0 of Chapte
this is a
hat this is a
ess, measu
compan
the project
of Chapter ‐
this is a
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
er – 10 of
proposed
proposed
res to be
ny after
are given
7
proposed
Polymers
Panshina,
, Gujarat.
mpliance 14
Page
No.
10.23 –
10.24
‐‐
7.32‐
7.36
‐‐
Environm
Sr.
No.
9 C
i
ii
ii
iv
10 D
f
r
mental Impact
T. R. AssocNABET Ac
TO
Corporate E
. Does the
laid dow
approved
Directors?
detailed i
. Does the
prescribe
process
into focu
deviation
environm
condition
detailed i
i. What is t
or Admin
company
environm
ensuring
environm
condition
system m
v. Does the
of rep
complianc
environm
Board o
company
stakehold
reporting
detailed i
Details reg
facilities su
restroom et
t Assessment R
ciates (Ahmedccredited
OR Conditio
Environmen
company
wn Environm
d by its
? If so,
n the EIA re
e Environm
for standa
/procedure
us any infr
/ violati
mental or fo
ns? If so,
n the EIA.
the hierarc
nistrative o
to deal
mental issue
complianc
mental
ns? Details
may be given
company h
porting
ces/violatio
mental norm
of Directo
and/or sha
ders at l
mechanis
n the EIA re
garding in
ch as sani
c. to be pro
Report
dabad)
on
t Policy
have a we
ment Polic
Board o
it may b
eport.
ment Polic
rd operatin
es to brin
ringement
ion of th
rest norms
it may b
hical system
order of th
with th
es and fo
ce with th
clearanc
s of thi
n.
have system
of non
ons o
ms to th
rs of th
reholders o
large? Thi
m shall b
eport
nfrastructur
tation, fue
ovided to th
ell
cy
of
e
At pres
environ
such a
operatio
cy
g
g
/
e
/
e
Our u
product
to it tha
have fro
and any
environ
m
e
e
or
e
e
is
Not app
project
cell will
the sam
Chapter
m
n‐
of
e
e
or
is
e
We hav
Howeve
system
partners
re
l,
e
Workers
as truck
basic a
Taluka: Limb
Complia
sent, we h
ment policy
policy on
on.
unit has
tion. Nevert
at Environm
ozen will br
y future is
ment.
plicable as
but enviro
be establi
me is given
r – 10 of the
ve not yet
er, we shal
to repor
s.
s including
k drivers w
amenities
Survey No. 1
bdi, District: Su
nce Status
have not la
y. We will
nce our u
yet not
theless, we
mental Polic
ring things i
ssues relate
our is the
nment man
shed and d
in Section
e EIA Repot.
started pr
l definitely
rt such i
casual wor
will be prov
like water
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
aid down
lay down
nit is in
started
shall see
y that we
into focus
ed to the
proposed
nagement
details for
10.3.3 of
.
roduction.
set up a
ssues to
rkers such
ided with
r supply,
Polymers
Panshina,
, Gujarat.
mpliance 15
Page
No.
‐‐
‐‐
10.3
‐‐
‐‐
Environm
Sr.
No.
la
w
i
o
11 E
i
12
13 A
w
14 T
f
s
mental Impact
T. R. AssocNABET Ac
TO
abour force
well as to
ncluding t
operation ph
Enterprise S
. Adequate
the proj
earmarked
Enterprise
based on
and item‐w
time boun
included.
developme
be elabora
Any litigat
project
direction/o
Court of L
if so, deta
included.
any notice
Environme
1986 or r
and Wate
thereof a
the notice
of the case
A tabular ch
wise compli
The TORs pr
for a period
submission o
t Assessment R
ciates (Ahmedccredited
OR Conditio
e during con
o the casu
truck driv
hase.
Social Comm
funds (at le
ect cost)
d towa
e Social C
Public He
wise details
nd action p
Soc
ent activiti
ated upon.
ion pending
and/o
order pass
Law against
ils thereof
Has the u
e under the
ent (Prote
elevant Sec
er Acts? If
nd complia
e(s) and pre
e.
hart with ind
iance of abo
rescribed sh
of three ye
of the EIA‐E
Report
dabad)
on
nstruction a
ual worker
vers durin
mitment (ES
east 2.5 % o
shall b
ards th
Commitmen
aring issue
s along wit
plan shall b
cio‐economi
es need t
g against th
r an
sed by an
the project
shall also b
nit receive
Section 5 o
ection) Act
ctions of A
f so, detail
ance/ATR t
esent statu
dex for poin
ove TORs.
hall be valid
ars for
EMP reports
as
rs
g
sanitatio
protecti
roads, c
SC)
of
e
e
nt
es
h
e
ic
o
Refer Se
EIA repo
e
y
ny
t,
e
d
of
t,
ir
ls
o
us
Not ap
project
nt Complie
s.
We have
Taluka: Limb
Complia
on facilities
ive equip
communicat
ection 8.5 o
ort for requ
plicable as
ed
e taken not
Survey No. 1
bdi, District: Su
nce Status
s, first aid,
pments,
tion etc.
of Chapter –
isite details
this is a
e of the sam
M/s. NN P
1458, Village: P
urendranagar,
TOR Com
personal
approach
– 8 of the
.
proposed
me
Polymers
Panshina,
, Gujarat.
mpliance 16
Page
No.
8.3
‐‐
‐‐
‐‐
INDEX
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 1
INDEX
CHAPTER
NO.
CONTENT PAGE NO.
1 INTRODUCTION 1.1‐ 1.9
1.1 Preamble 1.1
1.2 Purpose of the report 1.1
1.3 Promoters and their back ground 1.2
1.4 Need of the project and its importance in the country 1.2
1.5 Location of the proposed project and siting criteria 1.3
1.6 Scope of EIA study 1.6
1.7 Regulatory frame work 1.8
2 PROJECT DESCRIPTION 2.1‐2.33
2.1 Introduction 2.1
2.2 Project location 2.1
2.2.1. Justification of site selection 2.5
2.2.2. List of major industries within 10 km study area 2.5
2.2.3. Salient features of the proposed project site 2.6
2.3 Details of project land & plant lay‐out 2.7
2.4 Capital cost of the proposed project 2.7
2.5 Details of product and raw material consumption 2.9
2.6 Manufacturing Process 2.10
2.6.1. Melamine Formaldehyde Resin 2.10
2.6.2. Phenol Formaldehyde Resin 2.12
2.6.3. Urea Formaldehyde Resin 2.14
2.6.4. Laminated Sheets 2.16
2.7 Storage details of raw materials and products 2.18
2.8 Solvent requirement & recovery system 2.19
2.9 Requirement of Resources 2.20
2.9.1. Electricity / Power 2.20
2.9.2. Manpower 2.20
2.9.3. Water 2.21
2.9.4. Fuel 2.21
2.9.5. Plant, Machineries & Utilities 2.21
2.10 Energy Balance 2.22
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 2
CHAPTER
NO.
CONTENT PAGE NO.
2.11 Pollution Potential & Mitigation Measures 2.23
2.11.1 Water Pollution 2.23
2.11.2 Air Pollution 2.28
2.11.3 Solid / Hazardous Waste 2.32
2.11.4 Noise & Vibration 2.33
3 DESCRIPTION OF ENVIRONMENT 3.1‐3.68
3.1 Introduction 3.1
3.2 Air Environment 3.2
3.2.1 Micrometeorological Data 3.2
3.2.1.1 Meteorological Data from Secondary Sources 3.3
3.2.1.2 Meteorology ‐ Data Generated at the Project Site 3.5
3.2.2 Selection of AAQ Stations 3.7
3.2.2.1 Existing AAQ Status 3.7
3.2.2.2 Baseline Status of AAQ of Study Area 3.11
3.3 Noise Environment 3.12
3.3.1 Existing Noise Levels 3.12
3.3.2 Baseline Status of Ambient Noise Quality 3.15
3.4 Water Environment 3.15
3.4.1 Water Quality 3.15
3.4.1.1 Sample Collection and Analysis 3.16
3.4.1.2 Baseline Status of Ground Water 3.21
3.4.1.3 Baseline Status of Surface Water 3.24
3.5 Soil Environment 3.25
3.5.1 Methodology of Sample Collection and Analysis 3.25
3.5.2 Baseline Status of Soil Quality 3.28
3.6 Geo‐Hydrological Features 3.28
3.7 Land Use Status 3.34
(A) Data Used 3.35
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 3
CHAPTER
NO.
CONTENT PAGE NO.
(B) Methodology 3.35
(C) Interpretation of Remote Sensing Data 3.36
3.7.1 Topography 3.41
3.8 Ecology 3.44
3.8.1 Macro Level Approach: Secondary Data Collection 3.44
3.8.2 Micro Level Approach‐ Field Data Collection 3.44
3.8.2.1 Floral Status 3.45
3.8.2.2 Faunal Status 3.45
3.8.3 Biodiversity Status 3.45
3.8.3.1 Biodiversity ‐ Status of Flora 3.46
3.8.3.2 Biodiversity ‐ Status of Fauna 3.49
3.8.4 Conclusion 3.53
3.9 Socio Economic Environment 3.54
3.9.1 Introduction 3.54
3.9.2 Socioeconomics 3.54
3.9.3 Households 3.55
3.9.4 Population 3.55
3.9.5 Occupational Structure 3.57
3.9.6 Literacy 3.59
3.9.7 Amenities 3.61
3.9.8 Site Specific Studies 3.65
3.10 Traffic Survey 3.67
4 ANTICIPATED IMPACTS & MITIGATION MAESURES 4.1‐ 4.25
4.1 Preamble 4.1
4.2 Prediction and Evaluation of Impacts 4.2
4.3 Impact Identification 4.3
4.4 Assessment of Impacts 4.6
4.5 Quantification of Impacts 4.9
4.5.1 Environmental Attributes & Relative Importance 4.9
4.5.2 Magnitude Criteria 4.10
4.5.3 Matrix Development 4.11
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 4
CHAPTER
NO.
CONTENT PAGE NO.
4.6 Mitigation Measures for Impacts on environment during
Construction Phase
4.14
4.7 Mitigation Measures for Impacts on Environment during
Operational Phase
4.15
4.8 Impact on Air Quality 4.18
4.9 Existing Traffic & Vehicular Pollution 4.24
5 ANALYSIS OF ALTERNATIVES 5.1‐5.2
5.1 Introduction 5.1
5.2 Project Details 5.1
5.3 Site Alternatives 5.1
5.4 Alternative for Technologies 5.2
6 ENVIRONMENT MONITORING PROGRAM 6.1‐6.4
6.1 Introduction 6.1
6.2 Environment Monitoring Program 6.2
6.3 Budget for Implementation of Environmental Monitoring Plan 6.3
7 ADDITIONAL STUDIES 7.1‐7.50
A Public Consultation 7.1
B Risk Assessment Study 7.1
C Social Impact Assessment, R & R Action Plan 7.1
7.1 Overview of Project 7.2
7.2 Surrounding Area 7.2
7.2.1 Objective and Scope 7.2
7.2.2 Risk Analysis Methodology 7.3
7.3 Hazard Identification and Risk Analysis 7.3
7.3.1 Hazard Identification and Risk Analysis 7.4
7.3.2 Identification of Hazardous Chemicals used within
Premises
7.4
7.3.3 Storage Details of Raw Material and Products 7.6
7.3.4 Hazard Indices 7.13
7.3.5 Credible Accident Sources/Worst Case Scenarios 7.15
7.4 Consequence Modeling 7.16
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 5
CHAPTER
NO.
CONTENT PAGE NO.
7.4.1 Damage Criteria 7.16
7.4.2 Details of Model Used for Consequence Analysis 7.19
7.5 Failure Frequency 7.28
7.6 Estimation of Effect of Damage / Impact Identification 7.29
7.7 Summary 7.29
7.8 Proposed Risk Reduction Measures 7.30
7.9 Occupational Health Surveillance Program 7.32
7.9.1 Treatment Facilities Provided to Workers affected by
accidental Spillage of Chemicals
7.33
7.9.2 Minimization of the manual handling of hazardous
substance
7.34
7.9.3 DO’S and DONT’S 7.34
7.10 Disaster Management Plan 7.37
7.10.1 Disaster 7.37
7.10.2 Statutory Provisions 7.37
7.10.3 On‐Site Emergency Plan 7.37
7.10.4 Site Plan of the Factory and Surrounding 7.38
7.10.5 Types of Overall Emergencies 7.38
7.10.6 Assessment of In‐plant Hazards 7.39
7.10.7 Emergency Control System 7.39
7.10.8 General Procedures and responsibilities 7.43
7.11 Offsite Emergency Preparedness Plan 7.45
8 PROJECT BENEFITS 8.1‐8.3
8.1 Introduction 8.1
8.2 Employment Potential 8.1
8.3 Improvement in Physical & Social Infrastructure 8.1
8.4 Other Tangible Benefits 8.2
8.5 Corporate Social Responsibility (CSR) 8.3
9 ENVIRONMENTAL COST BENEFIT ANALYSIS 9.1
9.1 Environmental cost benefit analysis 9.1
10 ENVIRONMENTAL MANAGEMENT PLAN 10.1‐10.24
10.1 Introduction 10.1
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 6
CHAPTER
NO.
CONTENT PAGE NO.
10.2 Objectives of Environmental Management Plan 10.2
10.3 Components of Environmental Management Plan 10.2
10.3.1 Environment Management System (EMS) 10.2
10.3.2 Environmental Health & Safety (EHS) 10.3
10.3.3 Environmental Management Cell (EMC) 10.3
10.4 Environmental Management Plan for Proposed Project 10.4
10.4.1 Environmental Management during Construction Phase 10.4
10.4.2 Environmental Management during Operation Phase 10.6
10.5 Greenbelt Development Plan 10.11
10.6 Rain Water Harvesting Scheme 10.12
10.7 Occupational Health Management Plan 10.21
10.8 Fire & Safety Management Plan 10.22
10.9 Cleaner Production Technologies 10.23
10.10 Budget for Environment Protection Measures 10.23
11 SUMMARY & CONCLUSION 11.1–11.4
11.1 Introduction 11.1
11.2 Air Environment 11.1
11.3 Water Environment 11.1
11.4 Noise Environment 11.2
11.5 Land/Soil Environment 11.2
11.6 Ecology & Biodiversity 11.3
11.7 Socio‐Economic Environment 11.3
11.8 Conclusion 11.3
12 DISCLOSURE OF CONSULTANT ORGANIZATION 12.1‐12.4
12.1 Declaration for Involvement in EIA study 12.1
12.2 Company Profile 12.3
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 7
LIST OF TABLES
TABLE
NO. LIST OF TABLES PAGE NO.
1.1 Details of Proposed Product 1.1
1.2 Promoters and their Background 1.2
1.3 General Siting Criteria 1.5
1.4 Scope of the study 1.6
1.5 Regulatory Frame Work 1.8
2.1 Salient Features of the Proposed Project Site 2.6
2.2 Area Break‐up of Project Site 2.7
2.3 Break‐up of capital cost for Proposed Project 2.7
2.4 Details of Product 2.9
2.5 Details of Raw Material Consumption 2.9
2.6 Details of Proposed Raw Materials 2.18
2.7 Details of Proposed Products 2.19
2.8 Manpower Requirement 2.21
2.9 Fuel Requirement 2.21
2.10 List of Plant, Machineries and Utilities 2.22
2.11 Energy Balance 2.22
2.12 Stream‐wise Water Requirement & Wastewater Generation 2.23
2.13 Stream‐wise Quality of Effluent 2.27
2.14 Details of Flue Gas Emissions 2.28
2.15 Details of Air Pollution Control System 2.28
2.16 Details of Process Gas Emissions 2.31
2.17 Details of Hazardous Waste Management 2.32
3.1 Period of Meteorological Data Collection 3.2
3.2 Monthly Mean values of Meteorological Data (Secondary Data) 3.3
3.3 Ambient Air Monitoring Locations 3.8
3.4 Air – Parameters Analyzed and Sampling Duration 3.9
3.5 Ambient Air Quality – Methodology 3.9
3.6 Ambient Air Monitoring Results 3.10
3.7 Baseline Status of Ambient Air Quality 3.11
3.8 Noise Monitoring Locations 3.13
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 8
TABLE
NO. LIST OF TABLES PAGE NO.
3.9 Noise Level Monitoring Data 3.14
3.10 Water Monitoring Locations 3.17
3.11 Water Quality ‐ Physico‐Chemical Analysis of Ground Water 3.19
3.12 Water Quality ‐ Physico‐chemical Analysis of Surface Water 3.22
3.13 Soil Sampling Locations 3.27
3.14 Physico‐Chemical Characteristic of Soil 3.27
3.15 Rainfall Data of the Region 3.29
3.16 Land Use / Land Cover Classification 3.37
3.17 Taxonomic Status of Plant Species 3.46
3.18 Life Form Status of Plant Species 3.46
3.19 Common Tree Species 3.47
3.20 Wild/Forest Tree Species 3.48
3.21 List of Agriculture and Commercial Crop Species Recorded 3.48
3.22 Taxonomical Status of Herpetofauna 3.49
3.23 Overall Status of Terrestrial and Aquatic Birds 3.50
3.24 Overall Status of Mammals 3.52
3.25 List of Villages covered in 10 km Radius Area 3.54
3.26 Population Distribution in the Study Area 3.55
3.27 Occupational Structure in the Study Area 3.58
3.28 Literacy Status in the Study Area 3.60
3.29 Basic amenities detail for study villages covered in 10 km radius 3.61
3.30 Traffic Count Data 3.68
4.1 Impact Identification Matrix 4.4
4.2 Assessment of Impacts 4.7
4.3 Environmental Attributes 4.9
4.4 The Activity – Impact Evaluation Matrix 4.11
4.5 Cumulative Impact Matrix 4.13
4.6 Construction Phase: Impacts & its Mitigation Measures 4.14
4.7 Operation Phase: Impacts & its Mitigation Measures 4.15
4.8 Details of Flue Gas Stacks 4.18
4.9 Expected Pollutants and its Emission Rate 4.19
4.10 Predicted 24 Hourly Short term incremental concentration of PM10 4.23
4.11 Predicted 24 hourly short term incremental Concentrations of SO2 4.23
4.12 Predicted 24 hourly short term incremental Concentrations of NO2 4.24
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 9
TABLE
NO. LIST OF TABLES PAGE NO.
4.13 Assessment of Proposed Traffic Load 4.25
5.1 Proposed Technology Alternatives 5.2
6.1 Environmental Monitoring Program 6.2
6.2 Budget for Implementation of Environmental Monitoring Plan 6.3
7.1 Chemical Properties of Hazardous Chemicals 7.5
7.2 Storage Details of Raw Material 7.6
7.2 (A) Storage Details of Products 7.7
7.3 Identification Hazard Associated with Storage of Raw Materials 7.7
7.4 Fire & Explosion Index 7.14
7.5 Scenarios Considered for MCA Analysis 7.15
7.6 Damage Due to Incident Radiation Intensities 7.16
7.7 Radiation Exposure and Lethality 7.17
7.8 Damage Due to Peak Over Pressure 7.18
7.9 Consequence analysis and Damage Distance (Failure of raw
material storage tanks) 7.21
7.10 Atmospheric Storage Tank Leak/ Tank Fire Frequencies 7.28
7.11 Estimation of Fatality 7.29
7.12 Types of Emergencies 7.38
7.13 Details of Fire Extinguishers 7.42
7.14 Offsite Action Plan 7.48
10.1 Details of Plant Species in Greenbelt 10.11
10.2 Budgetary allocation towards Environmental Management 10.23
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 10
LIST OF FIGURES
FIGURE
NO. LIST OF FIGURES PAGE NO.
1.1 Location of the project site 1.3
1.2 Photograph of the project site 1.4
2.1 Index Map 2.2
2.2 Google Image showing surrounding 1,5,10 km radius area
from the project site 2.3
2.3 Toposheet showing surrounding 10 km radius area from
the project site 2.4
2.4 Google Map showing nearby Industries 2.5
2.5 Plant Lay‐out 2.8
2.6 Methanol Recovery System 2.20
2.7 Water Balance Diagram 2.25
2.8 Schematic Flow Diagram of Effluent Treatment Plant 2.26
3.1 Wind Rose Diagram of Entire Year (Secondary Source) 3.4
3.2 Photograph showing Automatic Weather Station installed
near project site
3.5
3.3 Wind Rose Diagram based on Primary Meteorological Data 3.6
3.4 Map showing Ambient Air Quality Locations 3.7
3.5 Photograph showing Ambient Air Monitoring 3.9
3.6 Map Showing Noise Sampling Locations 3.13
3.7 Photograph showing Noise Measurement 3.14
3.8 Photograph showing Ground & Surface Water Sample
Collection
3.17
3.9 Map showing Surface & Ground Water Quality Locations 3.18
3.10 Photograph showing Soil Sample Collection 3.26
3.11 Map showing Soil Sampling Locations 3.26
3.12 Ground Water Prospect Map 3.33
3.13 Land use and Land cover map of the 10 km radius study
area
3.38
3.14 Satellite Image of the 10 km radius study area 3.39
3.15 Infrastructure Map of the 10 km radius study area 3.40
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 11
FIGURE
NO. LIST OF FIGURES PAGE NO.
3.16 Topography Map of the 10 km radius study area 3.43
3.17 Photographs showing Surrounding Habitat 3.44
3.18 Percentage of Total Population Distribution 3.56
3.19 Percentage Distribution of Workers 3.59
3.20 Percentage Distribution of Literacy Levels 3.60
3.21 Photograph showing Socio‐Economic Data Collection 3.64
3.22 Image showing Traffic Surveying Location 3.67
4.1 Ground Level Concentration of PM10 4.20
4.2 Ground Level Concentration of SO2 4.21
4.3 Ground Level Concentration of NO2 4.22
7.1 Methanol Pool Fire (Threat Zone) 7.22
7.2 Methanol BLEVE Worst Case Scenario (Threat Zone) 7.23
7.3 Methanol Toxic Dispersion (Threat Zone) 7.24
7.4 Methanol Toxic Dispersion (1.5 m/s Weather Condition –
Stability Class F) 7.25
7.5 Formaldehyde (37 %) Toxic Dispersion (Threat Zone) 7.26
7.6 Phenol Toxic Dispersion (Threat Zone) 7.27
7.7 Off‐Site Emergency Plan 7.46
10.1 Environmental Management Cell 10.3
Environmental Impact Assessment Report
M/s. NN Polymers
Survey No. 1458, Village: Panshina,
Taluka: Limbdi, District: Surendranagar, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 12
LIST OF ANNEXURES
ANNEXURE
NO.
LIST OF ANNEXURES
1 TOR Letter issued by MoEFCC, New Delhi
2 Lease Deed Copy including NA permission
3 Proof of CGWB Application
4 Site Specific Primary Meteorological Data
5 Raw data of all AAQ measurement for all Sampling Locations
6 Checklist of Plant Species recorded in and around the Project Site
7 Material Safety Data Sheets of Raw Materials
8 Copy of NABET Accreditation Certificate
9 Copy of NABL Accreditation Certificate
top related