drg no 1 0-2574 iso 3 8 - planning inspectorate...june 2014 tollingham block valve 3d visualisation...

Post on 15-Jul-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

DRG

No

OFSCALE

DRG

No

SHEET A1

ISSUE

PROJECT

TITLE

DRAWN

DATE

CLIENT

© National Grid Carbon Limited (2014)

Tel : 01530 563000

Email: info@premtechltd.com

www.premtechltd.com

All rights reserved. No part of this work may

be reproduced or used in any form

(including storage by electronic means)

without the written permission of National

Grid Carbon Limited.

Warning: Any unauthorised act in relation to

the work may result in both a civil claim for

damages and criminal prosecution

JUNE 2014

TOLLINGHAM BLOCK VALVE

3D VISUALISATION (ISOMETRIC)

Steve Rocks

REGULATION 5(2)(0)

1 1 NTS

A

10-2574-ISO-01-0308

YORKSHIRE AND HUMBER

CARBON CAPTURE AND STORAGE

10-2574-ISO-01-0308

ISSUE DRAWNDATE

AMENDMENT

CHECKED APPROVED

A

JUNE 2014 S.ROCKS IB JB

APPROVED

AMENDMENT

DRAWNDATE CHECKEDISSUEAPPROVED

AMENDMENT

DRAWNDATE CHECKEDISSUEAPPROVED

AMENDMENT

DRAWNDATE CHECKEDISSUEAPPROVED

AMENDMENT

DRAWNDATE CHECKEDISSUEAPPROVED

AMENDMENT

DRAWNDATE CHECKEDISSUE

NOTES:

DCO SUBMISSION

31 Homer Road

Solihull

West Midlands

B91 3LT

Co-financed by the European Union's European

Energy Programme for Recovery.

National Grid Carbon LTD

PINS REFERENCE No: EN070001

DOCUMENT REFERENCE 2.35

CROSS COUNTRY PIPELINE

top related