4 CP Response Methodology
Analysis limited to ESIIDs in competitive ERCOT areas with ‘BUSIDRRQ’ profile types Transmission charges are based on ESIID-specific load during CP intervals ESIIDs classified by connection at transmission or distribution voltage level Distribution ESIIDs were classified based on weather sensitivity
Classified days as CP Days, Near-CP Days and Non-CP Days Near-CP days
Base-lined transmission total load for all summer weekdays using the 20 days nearest in time (before and after) excluding CP days and holidays Applied Day-of-Adjustment factor to baseline
Days with at least 100 MW reduction for Hour-ending 5:00 PM were classified as near CP days – found 69 Near-Peak days between 2009 - 2014
Non-CP days were all remaining non-holiday weekdays (June 1 – Sep 30)
Classified ESIIDs based on Weather Sensitivity and Load Factor Weather sensitivity (R2 for week-day use vs average temperature >= 0.6) Load Factor based on week-day afternoon usage (1:00 PM – 6:00 PM) High LF > 0.85 Medium LF > 0.60 Low LF ≤ 0.60
3
4 CP Response Type Classification
All ESIIDs subject to 4-CP charges were base-lined Non-weather sensitive: 20 Non-CP days clostest in time (before and after) Weather sensitive using regression baseline Day-of-adjustment factor from midnight to 3:00 PM was applied to baseline
Used baselines to calculate hour-ending 5:00 pm CP and Near-CP reductions (MW and percent) for three years closest to the analysis year (40 – 48 days of possible reductions)
Usually used the analysis year, the year before and the year after If the frequency and magnitude of MW17 reductions on CP and Near-CP days met
thresholds the ESIID was classified as 4-CP responder If not, just the analysis year and year after were examined
This was done to improve the classification of ESIIDs that started responding to 4-CP during the analysis year)
ESIIDs classified as responders were also examined for usage patterns indicating ‘day-use’ reduction for the 9:00 am – 4:00 pm time period on CP- and Near-CP days.
Based on the frequency and magnitude of ‘day-use’ reductions ESIIDs were classified as reducing or not reducing ‘day-use’ on CP- and Near-CP days.
4
Quantifying 4-CP and Near-CP Reductions
ESIIDs already classified as responders were used in the calculation for a day if they reduced by more than the lesser of 10% or the ESIID’s average reduction determined during the classification for the hour-ending 5:00 PM
ESIIDs with a lower reduction or ESIIDs already classified as non-responders were not part of the reduction calculation.
If the ESIID was classified as a peak responder, a scalar day-of-adjustment was applied to the baseline for calculating the load reduction for the CP/Near-CP day.
No scalar adjustment was applied to ESIIDs previously classified as having ‘day-use’ response.
The methodology was modified from last year to narrow in on response from responding ESIIDs and to more effectively remove the impact of non-responding ESIIDs from reduction calculations.
5
ERCOT Daily Peaks June – September 2014
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
MW
Day of Month
Daily ERCOT Peaks June 2014
Day Peak Interval
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
MW
Day of Month
Daily ERCOT Peaks September 2014
Day Peak Interval
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
MW
Day of Month
Daily ERCOT Peaks July 2014
Day Peak Interval
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
MW
Day of Month
Daily ERCOT Peaks August 2014
Day Peak Interval
Examined ERCOT Load daily peaks to determine possible Near-CP days
6
Total Load - Transmission Connected ESIIDs - 2014
3000
3200
3400
3600
3800
4000
4200
4400
0 20 40 60 80
6/16/2014 16:00-17:00
3000
3200
3400
3600
3800
4000
4200
4400
0 20 40 60 80
9/10/2014 16:00-17:00
3000
3200
3400
3600
3800
4000
4200
4400
0 20 40 60 80
7/21/2014 16:00-17:00
3000
3200
3400
3600
3800
4000
4200
4400
0 20 40 60 80
8/25/2014 16:00-17:00
Examined Transmission ESIID Load to Identify Near-CP days
7
200.0
300.0
400.0
500.0
600.0
700.0
800.0
2009
-Jun
2009
-Jul
2009
-Aug
2009
-Sep
2010
-Jun
2010
-Jul
2010
-Aug
2010
-Sep
2011
-Jun
2011
-Jul
2011
-Aug
2011
-Sep
2012
-Jun
2012
-Jul
2012
-Aug
2012
-Sep
2013
-Jun
2013
-Jul
2013
-Aug
2013
-Sep
2014
-Jun
2014
-Jul
2014
-Aug
2014
-Sep
MW
Year-Mon
4-CP Day MW17 Reductions 2009 - 2014
MW17 Reduce MW17Largest Near-CP
700
900
1,100
1,300
1,500
1,700
1,900
2,100
2,300
2,500
2009
-Jun
2009
-Jul
2009
-Aug
2009
-Sep
2010
-Jun
2010
-Jul
2010
-Aug
2010
-Sep
2011
-Jun
2011
-Jul
2011
-Aug
2011
-Sep
2012
-Jun
2012
-Jul
2012
-Aug
2012
-Sep
2013
-Jun
2013
-Jul
2013
-Aug
2013
-Sep
2014
-Jun
2014
-Jul
2014
-Aug
2014
-Sep
ESIID
s
Year-Mon
ESIIDs with 4-CP Reductions 2009 - 2014
ESIIDs Respond
Hour Ending 17:00 Response on 4 CP Days 2009 - 2014
2009-Jun 2009-Jul 2009-Aug 2009-Sep 2010-Jun 2010-Jul 2010-Aug 2010-Sep 2011-Jun 2011-Jul 2011-Aug 2011-SepMW-17 516.4 385.1 544.0 452.6 332.3 448.5 459.5 471.5 624.7 566.8 715.5 633.5
Largest Near CP17 389.6 336.7 392.8 388.6 444.8 533.5 556.4 442.1 550.8 620.7 643.7 547.6 MW-CP-Int 524.3 428.1 408.1 398.5 591.1 564.5 634.2 553.3 672.5 583.4 495.3 527.6
ESIIDs 1,988 1,504 1,575 1,396 1,427 1,724 1,743 1,349 1,827 1,977 2,480 1,737
2012-Jun 2012-Jul 2012-Aug 2012-Sep 2013-Jun 2013-Jul 2013-Aug 2013-Sep 2014-Jun 2014-Jul 2014-Aug 2014-SepMW-17 726.1 594.0 505.6 643.7 578.1 593.4 585.1 468.9 643.1 299.2 715.2 779.6
Largest Near CP17 649.4 667.1 513.1 697.8 535.5 399.1 582.8 482.1 311.0 540.0 439.9 534.0 MW-CP-Int 672.5 583.4 495.3 527.6 545.9 589.0 566.0 425.8 211.2 258.7 633.1 750.6
ESIIDs 2,413 2,112 2,031 1,770 1,819 1,495 1,751 1,761 1,842 1,617 1,983 1,806
8
4 CP 15-Minute Response 2009 - 2014
CP Date CP TimeReduce
MWNear-CP
DateNear-CP
TimeReduce
MWCP Date CP Time Reduce MW
Near-CP Date
Near-CP Time
Reduce MW
6/25/2009 16:15 558.8 6/4/2009 17:00 348.2 6/26/2012 16:30 725.2 6/11/2012 16:30 532.67/13/2009 17:00 394.5 6/12/2009 17:00 349.2 7/31/2012 17:00 599.6 6/25/2012 17:00 641.78/5/2009 16:00 486.7 6/16/2009 17:00 407.8 8/1/2012 17:00 526.7 7/20/2012 16:00 489.19/3/2009 16:00 401.7 6/24/2009 16:30 535.0 9/5/2012 17:00 655.6 7/30/2012 16:45 665.7
7/8/2009 16:45 397.0 8/2/2012 16:45 518.17/10/2009 16:45 402.2 9/4/2012 16:45 549.07/17/2009 16:45 403.1 9/6/2012 17:00 683.67/31/2009 16:00 377.7 9/7/2012 16:30 694.6
8/4/2009 17:00 405.7 9/28/2012 14:30 171.28/6/2009 17:00 333.79/2/2009 17:00 416.5
average 460.4 n=11 average 397.8 average 626.8 n=9 average 549.5
6/21/2010 16:45 335.6 6/18/2010 16:00 353.6 6/27/2013 17:00 585.7 6/19/2013 16:30 337.87/16/2010 16:30 434.2 6/22/2010 16:30 468.1 7/31/2013 17:00 600.5 6/26/2013 17:00 385.88/23/2010 16:00 424.9 6/23/2010 17:00 344.7 8/7/2013 16:45 601.9 6/28/2013 17:00 603.59/14/2010 16:45 474.3 6/23/2010 17:00 428.8 9/3/2013 16:45 471.7 7/9/2013 16:45 339.2
7/14/2010 17:00 522.0 7/10/2013 17:00 413.57/15/2010 16:45 560.9 8/1/2013 16:45 607.3
8/3/2010 16:30 445.1 8/6/2013 16:45 515.98/4/2010 16:45 508.0 9/4/2013 17:00 477.08/5/2010 16:30 448.9
8/11/2010 15:15 126.78/20/2010 15:30 176.5
9/1/2010 15:30 336.7
average 417.3 n=12 average 393.3 average 565.0 n=8 average 460.0
6/15/2011 17:00 631.2 6/14/2011 17:00 494.0 6/30/2014 16:30 662.5 6/3/2014 17:00 316.57/27/2011 16:30 566.4 6/16/2011 17:00 355.1 7/21/2014 16:45 304.0 7/8/2014 16:30 436.38/3/2011 17:00 707.7 6/17/2011 16:45 562.9 8/25/2014 17:00 714.0 7/14/2014 15:00 249.09/2/2011 16:30 639.6 6/28/2011 17:00 428.1 9/10/2014 17:00 781.9 7/22/2014 16:45 476.2
7/7/2011 16:45 461.3 7/25/2014 17:00 490.47/13/2011 17:00 594.6 8/6/2014 17:00 396.57/14/2011 16:45 636.2 8/8/2014 15:45 448.5
8/1/2011 16:45 468.7 8/21/2014 16:00 318.48/2/2011 16:45 640.3 8/22/2014 16:30 565.08/5/2011 16:45 478.0 9/2/2014 16:30 729.8
8/23/2011 16:45 403.7 9/9/2014 16:45 560.59/1/2011 16:45 540.6
9/13/2011 16:30 533.3
average 636.2 n=13 average 507.4 average 615.6 n=11 average 416.1
9
4 CP 15-Minute Response 2009 - 2014
• Number of Near-CP days averaged about 10 per year
• Since 2009, no CP intervals have occurred prior to interval ending 4:00 pm
• Of the 24 CP intervals since 2009, only 5 appear to have been shifted by 4-CP response– 2 shifted one interval earlier– 2 shifted one interval later– 1 (7/16/2010) shifted one day earlier and one interval later
14:30 0 1 114:45 0 0 015:00 0 1 115:15 0 1 115:30 0 2 215:45 0 1 116:00 3 4 716:15 1 0 116:30 5 11 1616:45 5 21 2617:00 10 22 32
CP Near-CP Total
Date Time Date Time7/16/2010 16:30 7/15/2010 16:456/15/2011 17:00 6/15/2011 16:457/27/2011 16:30 7/27/2011 16:458/3/2011 17:00 8/3/2011 16:456/26/2012 16:30 6/26/2012 16:45
4-CP Peak Shifting
Actual Peak Peak with no 4-CP Reduction
10
4 CP Response – ERCOT REP Survey
232
REPs with 4_CP in 2013 OnlyREPs with 4_CP in both 2013 and 2014
REPs with 4_CP in 2014 Only
228
83
145ESIIDs on 4-CP in 2014 and not on other
2014 program(s)
Total ESIIDs on 4_CP in 2014ESIIDs on 4-CP in 2014 and on other 2014
program(s)
NO: ESIID submitted but not for this programNO REPT: ESIID not submitted for any program
YES/N: ESIID submitted for REP 4-CP notification - no DLCBI/N: ESIID on Block and Index - no DLC
OLC/Y: ESIID on Other Load Control - no DLCRTP/NP: ESIID on Real Time Pricing - no DLC
# : Used to separate multiple programs
Key
2013 2014 2013 2014NO YES/N BI/N BI/N 1 0.4%NO YES/N BI/N BI/N#RTP/N 6 2.5%NO YES/N BI/N NO 6 2.5%NO YES/N BI/N RTP/N 13 5.5%NO YES/N PR/N PR/N 32 13.4%NO YES/N RTP/N RTP/N 5 2.1%
NO REPT YES/N NO REPT NO 139 58.4%NO REPT YES/N NO REPT PR/N 1 0.4%NO REPT YES/N NO REPT RTP/N 21 8.8%
YES/N NO OLC/Y OLC/N#RTP/N 2 0.8%YES/N NO REPT BI/N NO REPT 1 0.4%YES/N NO REPT NO NO REPT 1 0.4%YES/N YES/N BI/N RTP/N 3 1.3%YES/N YES/N NO RTP/N 1 0.4%
YES/Y NO REPT NO NO REPT 6 2.5%
238 100.0%
Pct
Total
4-CP Reports Other Programs Reported Number of ESIIDs
11
4 CP Response – ERCOT REP Survey
Response Date
Entity ERCOT Analysis
Near CP Day
CP Day
CP Interval
Near CP Day
CP Day
CP Interval
6/3/2014 Yes 7/1/20146/4/2014 7/2/2014 REP 16/5/2014 7/7/20146/6/2014 7/8/2014 Yes6/11/2014 7/9/2014 REP 16/16/2014 REP 2 7/10/2014 REP 16/17/2014 7/11/2014 REP 16/23/2014 REP 1 7/14/2014 REP 1 REP 2 Yes6/24/2014 REP 1 7/21/2014 REP 2 REP 3 Yes 16:456/30/2014 REP 1 REP 2 REP 3 Yes 16:30 7/22/2014 REP 1 REP 2 Yes
7/23/2014 REP 1 REP 27/24/2014 REP 1
8/4/2014 REP 1 7/25/2014 REP 1 REP 2 Yes8/5/2014 REP 1 7/28/2014 REP 1 REP 28/6/2014 REP 1 Yes8/7/2014 REP 1 REP 28/8/2014 REP 1 REP 2 Yes 9/2/2014 REP 1 REP 2 Yes8/15/2014 REP 1 Yes 9/3/2014 REP 18/21/2014 REP 2 Yes 9/5/20148/22/2014 REP 1 REP 2 Yes 9/8/2014 REP 18/25/2014 REP 1 REP 2 REP 3 Yes 17:00 9/9/2014 REP 1 REP 2 Yes8/26/2014 REP 1 9/10/2014 REP 1 REP 2 REP 3 Yes 17:00
Response Date
EntityERCOT Analysis
• Notifications: REP 1 – 27 REP 2 – 16 REP 3 – 4• REP 1 missed July CP, otherwise REP notifications were sent for all actual CP days
12
4 CP Response – ERCOT REP Survey
• 238 ESIIDs reported by REPS as being on 4-CP notification programs in 2013 or 2014• 182 (76%) were classified by ERCOT as 4-CP responders.
4-CP 2013
4-CP 2014
Non Responders
RespondersPercent Respond
NO YES/N 12 51 81.0NO REPT YES/N 43 128 74.9
YES/N NO 1 1 50.0YES/N NO REPT 1 2 66.7YES/N YES/N 1 3 75.0YES/Y NO REPT 1 7 87.5
59 192 76.5
ERCOT AnalysisREP Reports
Total
13
Number of ESIIDs with 4 CP Responses – 2014
Load Factor
Response TypeReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
Respond
JuneTransmission 11 1 152 15 8 120 7 18 39 33 27 311
Distribution NWS 136 1 1,704 321 50 5,207 791 269 2,299 1,248 320 9,210 Distribution WS 69 5 521 91 35 1,202 6 8 62 166 48 1,785
Total 216 7 2,377 427 93 6,529 804 295 2,400 1,447 395 11,306
JulyTransmission 5 1 159 15 8 122 7 19 39 27 28 320
Distribution NWS 68 2 1,771 231 56 5,293 725 266 2,365 1,024 324 9,429 Distribution WS 40 6 549 109 39 1,180 11 9 56 160 54 1,785
Total 113 9 2,479 355 103 6,595 743 294 2,460 1,211 406 11,534
AugustTransmission 8 1 156 19 10 116 8 18 39 35 29 311
Distribution NWS 142 5 1,695 351 59 5,169 757 270 2,337 1,250 334 9,201 Distribution WS 112 6 477 160 37 1,131 11 9 56 283 52 1,664
Total 262 12 2,328 530 106 6,416 776 297 2,432 1,568 415 11,176
SeptemberTransmission 12 3 150 22 10 113 13 23 29 47 36 292
Distribution NWS 143 3 1,696 340 56 5,178 595 242 2,522 1,078 301 9,396 Distribution WS 113 6 476 166 36 1,126 13 10 53 292 52 1,655
Total 268 12 2,322 528 102 6,417 621 275 2,604 1,417 389 11,343
High Medium Low Total
14
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Responding Transmission Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
30-Jun-14 99.0 79.0 20.0 124.7 75.3 49.4 132.3 109.5 22.8 355.9 263.8 92.1
21-Jul-14 25.3 20.1 5.2 35.6 14.0 21.6 48.3 31.9 16.4 109.2 66.0 43.2
25-Aug-14 110.1 78.5 31.6 122.8 79.0 43.8 127.4 104.8 22.6 360.3 262.3 98.0
10-Sep-14 119.5 81.8 37.7 127.6 82.3 45.3 177.6 134.4 43.2 424.8 298.6 126.2
8-Aug-14 72.0 65.8 6.1 99.4 73.6 25.8 147.1 125.9 21.2 318.5 265.3 53.2
4 CP Days
Near CP Day with Largest Response
Reductions for Hour Ending 17:00
TotalHigh Load Factor Medium Load Factor Low Load Factor
15
Hour-ending 17:00 MW Reductions on 4 CP Days - 2014
Responding NWS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
30-Jun-14 51.4 50.8 0.6 102.9 84.8 18.1 108.8 63.8 45.1 263.2 199.4 63.8
21-Jul-14 9.4 8.2 1.2 62.3 46.4 16.0 99.3 54.6 44.7 171.1 109.2 62.0
25-Aug-14 78.6 76.4 2.1 106.2 85.4 20.8 134.5 82.5 52.0 319.3 244.3 75.0
10-Sep-14 73.0 71.6 1.4 121.7 90.2 31.5 121.9 72.0 49.9 316.7 233.9 82.8
8-Aug-14 45.0 43.8 1.1 103.1 88.1 15.0 130.4 95.5 34.9 278.4 227.4 51.0
4 CP Days
Near CP Day with Largest Response
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
16
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Responding WS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
30-Jun-14 9.0 8.6 0.4 14.0 5.4 8.6 0.9 0.1 0.8 23.9 14.0 9.9
21-Jul-14 2.8 2.2 0.5 14.7 5.7 9.0 1.4 0.6 0.9 18.8 8.5 10.4
25-Aug-14 10.7 10.0 0.8 23.1 9.9 13.1 1.9 0.5 1.4 35.6 20.4 15.2
10-Sep-14 11.7 11.0 0.7 24.5 11.2 13.3 2.0 0.5 1.4 38.2 22.8 15.4
8-Aug-14 8.6 7.9 0.7 17.3 4.0 13.3 1.4 0.2 1.2 27.3 12.1 15.1
Reductions for Hour Ending 17:00
4 CP Days
Medium Load Factor Low Load Factor TotalHigh Load Factor
Near CP Day with Largest Response
17
Hour-ending 17:00 MW Reductions on 4 CP Days - 2014
All Responding 4-CP ESIIDS
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
30-Jun-14 159.4 138.4 21.0 241.7 165.5 76.1 242.0 173.4 68.7 643.1 477.3 165.8
21-Jul-14 37.5 30.5 7.0 112.7 66.1 46.6 149.0 87.1 62.0 299.2 183.6 115.5
25-Aug-14 199.4 164.9 34.5 252.0 174.3 77.7 263.8 187.8 76.0 715.2 526.9 188.2
10-Sep-14 204.3 164.4 39.8 273.9 183.8 90.1 301.5 207.0 94.5 779.6 555.2 224.4
8-Aug-14 125.5 117.6 7.9 219.8 165.7 54.1 278.8 221.6 57.2 624.2 504.9 119.3
Reductions for Hour Ending 17:00
High Load Factor Low Load FactorMedium Load Factor Total
4 CP Days
Near CP Day with Largest Response
18
Hour-ending 17:00 MW Reductions on 4 CP Days - 2014
Reductions by Voltage Group
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
30-Jun-14 355.9 263.8 92.1 263.2 199.4 63.8 23.9 14.0 9.9 643.1 477.3 165.8
21-Jul-14 109.2 66.0 43.2 171.1 109.2 62.0 18.8 8.5 10.4 299.2 183.6 115.5
25-Aug-14 360.3 262.3 98.0 319.3 244.3 75.0 35.6 20.4 15.2 715.2 526.9 188.2
10-Sep-14 424.8 298.6 126.2 316.7 233.9 82.8 38.2 22.8 15.4 779.6 555.2 224.4
8-Aug-14 318.5 265.3 53.2 278.4 227.4 51.0 27.3 12.1 15.1 624.2 504.9 119.3 Near CP Day with Largest Response
4 CP Days
Reductions for Hour Ending 17:00
Transmission Distribution Non-Weather Sensitive Distribution Weather Sensitive Total
19
Hour-ending 17:00 MW Reductions on 4 CP Days - 2014
Reductions as a Percent of Total Voltage Group LoadTotal
ReductionResponders Total Load
Non-Responders Total Load
Total Load
Response as Percent of Total
Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total Load
Response as Percent of Total
Load
30-Jun-14 159.4 527.8 5,436.6 5,964.4 2.7% 241.7 769.8 5,967.0 6,736.9 3.6%
21-Jul-14 37.5 277.8 5,782.9 6,060.7 0.6% 112.7 563.9 6,344.9 6,908.8 1.6%
25-Aug-14 199.4 570.0 5,473.0 6,043.0 3.3% 252.0 868.2 6,115.1 6,983.3 3.6%
10-Sep-14 204.3 625.2 5,417.4 6,042.6 3.4% 273.9 874.5 6,036.3 6,910.9 4.0%
30-Jun-14 242.0 409.1 850.9 1,260.0 19.2% 643.1 1,706.7 12,254.6 13,961.3 4.6%
21-Jul-14 149.0 325.7 987.5 1,313.2 11.3% 299.2 1,167.3 13,115.3 14,282.7 2.1%
25-Aug-14 263.8 506.6 1,095.6 1,602.2 16.5% 715.2 1,944.7 12,683.8 14,628.5 4.9%
10-Sep-14 301.5 492.4 1,115.4 1,607.8 18.8% 779.6 1,992.1 12,569.1 14,561.2 5.4%
CP Date
Low Load FactorTotal
High Load Factor MW Medium Load Factor MW
20
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Percentage of Load Reduction by Load Factor and Voltage Group
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction30-Jun-14 159.4 24.8% 241.7 37.6% 242.0 37.6% 643.1
21-Jul-14 37.5 12.5% 112.7 37.7% 149.0 49.8% 299.2
25-Aug-14 199.4 27.9% 252.0 35.2% 263.8 36.9% 715.2
10-Sep-14 204.3 26.2% 273.9 35.1% 301.5 38.7% 779.6
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction30-Jun-14 355.9 55.3% 263.2 40.9% 23.9 3.7% 643.1
21-Jul-14 109.2 36.5% 171.1 57.2% 18.8 6.3% 299.2
25-Aug-14 360.3 50.4% 319.3 44.6% 35.6 5.0% 715.2
10-Sep-14 424.8 54.5% 316.7 40.6% 38.2 4.9% 779.6
High Load Factor Medium Load Factor Low Load FactorTotal
Reduction
TransmissionTotal
Reduction
Distribution NWS Distribution WS
21
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Percentage of Load Reduction based on Customer Peak
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction30-Jun-14 72.7 11.3% 202.9 31.6% 98.4 15.3% 269.0 41.8% 643.1
21-Jul-14 58.8 19.6% 134.7 45.0% 30.6 10.2% 75.1 25.1% 299.2
25-Aug-14 92.8 13.0% 212.1 29.7% 99.3 13.9% 310.9 43.5% 715.2
10-Sep-14 82.8 10.6% 234.9 30.1% 123.6 15.8% 338.4 43.4% 779.6
10 - 30 MWTotal
Reduction
> 30 MW< 1 MW 1 - 10 MW
22
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Peak Response Day-use Response
0
200
400
600
800
1000
1200
1400
1600
1800
0 20 40 60 80
MW
Interval
June 30, 2014
base actual reduce
0
50
100
150
200
250
300
350
400
450
500
0 20 40 60 80
MW
Interval
July 21, 2014
base actual reduce
0
50
100
150
200
250
300
350
400
450
500
0 20 40 60 80
MW
Interval
June 30, 2014
base actual reduce
0
200
400
600
800
1000
1200
1400
1600
1800
0 20 40 60 80
MW
Interval
July 21, 2014
base actual reduce
23
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Peak Response Day-use Response
0
200
400
600
800
1000
1200
1400
1600
1800
0 20 40 60 80
MW
Interval
August 25, 2014
base actual reduce
0
50
100
150
200
250
300
350
400
450
500
0 20 40 60 80
MW
Interval
September 10, 2014
base actual reduce
0
50
100
150
200
250
300
350
400
450
500
0 20 40 60 80
MW
Interval
August 25, 2014
base actual reduce
0
200
400
600
800
1000
1200
1400
1600
1800
0 20 40 60 80
MW
Interval
September 10, 2014
base actual reduce
24
Hour-ending 17:00 Reductions on 4 CP Days - 2014
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 30, 2014
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 10, 2014
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 25, 2014
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 21, 2014
Actual Baseline Reduce HR 17:00
25
ON
OFF
Questions?
craish@ercot.com 512/248-3876
26
Appendix 1 – ESIIDs Responding
27
Number of ESIIDs with 4 CP Responses – 2009
Load Factor
Response TypeReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
Respond
JuneTransmission 7 2 131 15 4 112 19 17 34 41 23 277
Distribution NWS 117 3 1,717 384 41 4,598 864 196 2,009 1,365 240 8,324 Distribution WS 30 1 893 219 28 1,629 31 10 78 280 39 2,600
Total 154 6 2,741 618 73 6,339 914 223 2,121 1,686 302 11,201
JulyTransmission 4 1 135 13 9 109 13 18 39 30 28 283
Distribution NWS 62 4 1,770 243 35 4,746 684 229 2,153 989 268 8,669 Distribution WS 27 1 896 101 26 1,749 28 6 85 156 33 2,730
Total 93 6 2,801 357 70 6,604 725 253 2,277 1,175 329 11,682
AugustTransmission 9 1 130 10 5 116 13 14 43 32 20 289
Distribution NWS 101 2 1,733 261 38 4,726 689 200 2,178 1,051 240 8,637 Distribution WS 34 1 889 140 22 1,745 28 7 84 202 30 2,718
Total 144 4 2,752 411 65 6,587 730 221 2,305 1,285 290 11,644
SeptemberTransmission 6 1 133 9 6 116 13 11 45 28 18 294
Distribution NWS 61 1 1,771 236 54 4,733 595 215 2,257 892 270 8,761 Distribution WS 26 1 895 109 22 1,028 20 10 89 155 33 2,012
Total 93 3 2,799 354 82 5,877 628 236 2,391 1,075 321 11,067
High Medium Low Total
28
Number of ESIIDs with 4 CP Responses – 2010
Load Factor
Response TypeReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
Respond
JuneTransmission 6 1 147 7 4 107 7 17 50 20 22 304
Distribution NWS 54 1 2,106 196 32 4,697 710 250 2,125 960 283 8,928 Distribution WS 27 2 892 83 10 1,101 18 2 46 128 14 2,039
Total 87 4 3,145 286 46 5,905 735 269 2,221 1,108 319 11,271
JulyTransmission 3 1 150 10 6 102 15 21 39 28 28 291
Distribution NWS 96 1 2,065 347 29 4,547 821 214 2,052 1,264 244 8,664 Distribution WS 38 2 881 100 10 1,084 8 2 56 146 14 2,021
Total 137 4 3,096 457 45 5,733 844 237 2,147 1,438 286 10,976
AugustTransmission 7 3 144 12 5 101 14 22 39 33 30 284
Distribution NWS 89 1 2,072 255 39 4,630 787 237 2,071 1,131 277 8,773 Distribution WS 61 2 858 186 12 1,118 10 1 55 257 15 2,031
Total 157 6 3,074 453 56 5,849 811 260 2,165 1,421 322 11,088
SeptemberTransmission 7 3 143 10 9 99 10 16 50 27 28 292
Distribution NWS 93 1 2,064 253 38 4,629 580 217 2,293 926 256 8,986 Distribution WS 26 2 893 64 12 1,028 7 1 57 97 15 1,978
Total 126 6 3,100 327 59 5,756 597 234 2,400 1,050 299 11,256
High Medium Low Total
29
Number of ESIIDs with 4 CP Responses – 2011
Load Factor
Response TypeReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
Respond
JuneTransmission 8 4 147 16 7 113 13 16 30 37 27 290
Distribution NWS 138 1 2,151 328 50 4,707 777 196 2,000 1,243 247 8,858 Distribution WS 79 1 1,093 145 29 1,376 12 7 54 236 37 2,523
Total 225 6 3,391 489 86 6,196 802 219 2,084 1,516 311 11,671
JulyTransmission 5 1 153 9 12 115 14 16 30 28 29 298
Distribution NWS 110 3 2,177 305 46 4,734 723 203 2,049 1,138 252 8,960 Distribution WS 40 1 1,132 99 23 1,428 17 5 51 156 29 2,611
Total 155 5 3,462 413 81 6,277 754 224 2,130 1,322 310 11,869
AugustTransmission 7 1 151 18 12 106 16 18 26 41 31 283
Distribution NWS 155 4 2,131 358 66 4,662 764 212 2,001 1,277 282 8,794 Distribution WS 93 - 1,080 212 23 1,315 13 5 55 318 28 2,450
Total 255 5 3,362 588 101 6,083 793 235 2,082 1,636 341 11,527
SeptemberTransmission 7 2 150 13 9 114 16 16 28 36 27 292
Distribution NWS 182 3 2,104 540 47 4,496 1,038 212 1,723 1,760 262 8,323 Distribution WS 100 1 1,072 240 28 1,282 19 7 47 359 36 2,401
Total 289 6 3,326 793 84 5,892 1,073 235 1,798 2,155 325 11,016
High Medium Low Total
30
Number of ESIIDs with 4 CP Responses – 2012
Load Factor
Response TypeReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
Respond
JuneTransmission 13 1 147 14 17 102 17 16 25 44 34 274
Distribution NWS 106 4 1,717 322 52 5,061 778 214 2,256 1,206 270 9,034 Distribution WS 195 1 469 598 13 983 38 14 54 831 28 1,506
Total 314 6 2,333 934 82 6,146 833 244 2,335 2,081 332 10,814
JulyTransmission 11 - 149 12 14 107 11 15 32 34 29 288
Distribution NWS 99 2 1,725 316 50 5,068 784 247 2,216 1,199 299 9,009 Distribution WS 106 1 558 398 11 1,185 27 8 71 531 20 1,814
Total 216 3 2,432 726 75 6,360 822 270 2,319 1,764 348 11,111
AugustTransmission 6 - 155 10 11 112 10 12 36 26 23 303
Distribution NWS 81 1 1,745 329 40 5,065 788 223 2,236 1,198 264 9,046 Distribution WS 117 - 548 359 9 1,226 25 10 71 501 19 1,845
Total 204 1 2,448 698 60 6,403 823 245 2,343 1,725 306 11,194
SeptemberTransmission 10 1 150 15 13 104 8 16 34 33 30 288
Distribution NWS 94 - 1,733 302 50 5,079 684 220 2,342 1,080 270 9,154 Distribution WS 70 - 595 238 12 1,344 25 12 69 333 24 2,008
Total 174 1 2,478 555 75 6,527 717 248 2,445 1,446 324 11,450
High Medium Low Total
31
Number of ESIIDs with 4 CP Responses – 2013
Load Factor
Response TypeReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
Respond
JuneTransmission 11 1 152 17 11 97 11 15 37 39 27 286
Distribution NWS 133 4 1,761 317 51 5,102 876 235 2,153 1,326 290 9,016 Distribution WS 36 - 362 90 2 753 6 3 31 132 5 1,146
Total 180 5 2,275 424 64 5,952 893 253 2,221 1,497 322 10,448
JulyTransmission 7 4 153 15 7 103 14 19 30 36 30 286
Distribution NWS 86 3 1,808 254 40 5,174 736 229 2,299 1,076 272 9,281 Distribution WS 19 - 379 54 2 789 2 4 34 75 6 1,202
Total 112 7 2,340 323 49 6,066 752 252 2,363 1,187 308 10,769
AugustTransmission 9 2 152 15 8 102 11 20 32 35 30 286
Distribution NWS 165 1 1,731 377 43 5,051 760 225 2,280 1,302 269 9,062 Distribution WS 23 - 375 75 5 765 6 6 28 104 11 1,168
Total 197 3 2,258 467 56 5,918 777 251 2,340 1,441 310 10,516
SeptemberTransmission 7 2 154 12 15 98 8 14 39 27 31 291
Distribution NWS 98 4 1,795 236 64 5,171 714 240 2,308 1,048 308 9,274 Distribution WS 23 - 375 39 6 800 4 5 31 66 11 1,206
Total 128 6 2,324 287 85 6,069 726 259 2,378 1,141 350 10,771
High Medium Low Total
32
Number of ESIIDs with 4 CP Responses – 2014
Load Factor
Response TypeReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
RespondReduce
HourReduce
DayNon
Respond
JuneTransmission 11 1 152 15 8 120 7 18 39 33 27 311
Distribution NWS 136 1 1,704 321 50 5,207 791 269 2,299 1,248 320 9,210 Distribution WS 69 5 521 91 35 1,202 6 8 62 166 48 1,785
Total 216 7 2,377 427 93 6,529 804 295 2,400 1,447 395 11,306
JulyTransmission 5 1 159 15 8 122 7 19 39 27 28 320
Distribution NWS 68 2 1,771 231 56 5,293 725 266 2,365 1,024 324 9,429 Distribution WS 40 6 549 109 39 1,180 11 9 56 160 54 1,785
Total 113 9 2,479 355 103 6,595 743 294 2,460 1,211 406 11,534
AugustTransmission 8 1 156 19 10 116 8 18 39 35 29 311
Distribution NWS 142 5 1,695 351 59 5,169 757 270 2,337 1,250 334 9,201 Distribution WS 112 6 477 160 37 1,131 11 9 56 283 52 1,664
Total 262 12 2,328 530 106 6,416 776 297 2,432 1,568 415 11,176
SeptemberTransmission 12 3 150 22 10 113 13 23 29 47 36 292
Distribution NWS 143 3 1,696 340 56 5,178 595 242 2,522 1,078 301 9,396 Distribution WS 113 6 476 166 36 1,126 13 10 53 292 52 1,655
Total 268 12 2,322 528 102 6,417 621 275 2,604 1,417 389 11,343
High Medium Low Total
33
Appendix 2 – Transmission MW Response
34
Hour-ending 17:00 Reductions on 4 CP Days - 2009
Responding Transmission Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
25-Jun-09 87.0 67.8 19.2 70.6 57.8 12.8 149.9 125.1 24.8 307.5 250.7 56.8
13-Jul-09 72.3 55.7 16.6 85.4 57.7 27.7 69.1 51.4 17.6 226.7 164.7 61.9
5-Aug-09 87.0 70.4 16.6 75.1 49.8 25.3 204.2 158.3 45.9 366.3 278.5 87.8
3-Sep-09 87.5 76.2 11.4 80.7 59.0 21.8 116.0 101.6 14.4 284.3 236.7 47.6
24-Jun-09 84.3 64.2 20.1 80.1 56.1 24.0 159.3 128.6 30.7 323.8 249.0 74.8
Reductions for Hour Ending 17:00
TotalHigh Load Factor Medium Load Factor Low Load Factor
4 CP Days
Near CP Day with Largest Response
35
Hour-ending 17:00 Reductions on 4 CP Days - 2010
Responding Transmission Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
21-Jun-10 76.2 58.0 18.2 65.9 8.7 57.2 32.2 5.4 26.8 174.3 72.1 102.2
16-Jul-10 54.0 35.9 18.1 56.3 18.6 37.7 131.5 104.1 27.4 241.7 158.6 83.1
23-Aug-10 81.9 59.9 22.0 90.7 29.2 61.5 63.4 11.7 51.7 236.0 100.8 135.2
14-Sep-10 99.1 62.9 36.2 63.8 13.3 50.5 140.1 113.1 26.9 303.0 189.3 113.6
20-Aug-10 127.3 118.0 9.3 110.3 60.7 49.6 38.5 6.3 32.2 276.1 185.0 91.1
Reductions for Hour Ending 17:00
TotalHigh Load Factor Medium Load Factor Low Load Factor
4 CP Days
Near CP Day with Largest Response
36
Hour-ending 17:00 Reductions on 4 CP Days - 2011
Responding Transmission Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
15-Jun-11 78.9 74.8 4.0 110.5 26.1 84.4 218.1 190.7 27.4 407.4 291.6 115.8
27-Jul-11 89.1 67.4 21.7 134.0 31.4 102.6 130.4 116.1 14.4 353.6 214.9 138.7
3-Aug-11 89.2 67.5 21.7 130.1 33.0 97.1 204.2 179.9 24.2 423.5 280.5 143.0
24-Sep-11 73.5 63.8 9.6 89.5 25.5 64.0 166.0 139.8 26.2 329.0 229.2 99.8
2-Aug-11 81.4 81.4 0.0 140.7 38.5 102.1 175.4 162.8 12.6 397.5 282.8 114.7
4 CP Days
Near CP Day with Largest Response
Reductions for Hour Ending 17:00
TotalHigh Load Factor Medium Load Factor Low Load Factor
37
Hour-ending 17:00 Reductions on 4 CP Days - 2012
Responding Transmission Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
26-Jun-12 94.3 92.5 1.8 138.8 58.2 80.6 184.3 157.3 27.0 417.4 308.0 109.4
31-Jul-12 106.5 106.5 0.0 112.7 31.4 81.3 97.1 64.8 32.2 316.3 202.8 113.5
1-Aug-12 67.3 67.3 0.0 91.1 14.5 76.7 90.5 69.8 20.7 248.9 151.6 97.3
5-Sep-12 116.1 105.3 10.8 107.5 43.9 63.6 183.4 164.0 19.4 407.0 313.2 93.8
7-Sep-12 107.4 104.5 2.8 102.4 44.1 58.3 170.2 152.1 18.1 379.9 300.6 79.3
4 CP Days
Near CP Day with Largest Response
Reductions for Hour Ending 17:00
TotalHigh Load Factor Medium Load Factor Low Load Factor
38
Hour-ending 17:00 Reductions on 4 CP Days - 2013
Responding Transmission Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
27-Jun-13 73.1 69.6 3.5 109.6 73.2 36.4 139.8 110.0 29.8 322.5 252.8 69.7
31-Jul-13 111.5 75.6 35.9 117.9 85.0 32.9 127.7 97.8 29.8 357.0 258.4 98.6
7-Aug-13 75.4 54.2 21.2 99.7 82.9 16.7 128.4 104.8 23.6 303.5 241.9 61.6
3-Sep-13 101.1 70.3 30.8 105.5 38.7 66.8 30.8 18.7 12.1 237.5 127.7 109.7
1-Aug-13 77.2 56.9 20.3 90.7 61.9 28.8 150.1 123.5 26.6 318.0 242.3 75.7
Reductions for Hour Ending 17:00
TotalHigh Load Factor Medium Load Factor Low Load Factor
4 CP Days
Near CP Day with Largest Response
39
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Responding Transmission Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
16-Jun-14 99.0 79.0 20.0 124.7 75.3 49.4 132.3 109.5 22.8 355.9 263.8 92.1
21-Jul-14 25.3 20.1 5.2 35.6 14.0 21.6 48.3 31.9 16.4 109.2 66.0 43.2
25-Aug-14 110.1 78.5 31.6 122.8 79.0 43.8 127.4 104.8 22.6 360.3 262.3 98.0
10-Sep-14 119.5 81.8 37.7 127.6 82.3 45.3 177.6 134.4 43.2 424.8 298.6 126.2
8-Aug-14 72.0 65.8 6.1 99.4 73.6 25.8 147.1 125.9 21.2 318.5 265.3 53.2
Reductions for Hour Ending 17:00
TotalHigh Load Factor Medium Load Factor Low Load Factor
4 CP Days
Near CP Day with Largest Response
40
Appendix 3 – Distribution NWS MW Response
41
Hour-ending 17:00 Reductions on 4 CP Days – 2009
Responding NWS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
25-Jun-09 22.5 20.7 1.8 76.0 59.0 17.0 109.8 78.7 31.2 208.3 158.4 50.0
13-Jul-09 8.3 6.8 1.5 58.4 33.7 24.7 88.5 53.2 35.3 155.2 93.7 61.5
5-Aug-09 17.3 16.8 0.5 66.4 47.2 19.1 94.6 65.7 28.9 178.3 129.7 48.6
3-Sep-09 7.9 7.6 0.3 65.2 46.8 18.4 91.9 62.1 29.8 165.1 116.5 48.6
24-Jun-09 17.4 15.6 1.7 64.3 47.2 17.1 95.5 65.1 30.4 177.2 128.0 49.2 Near CP Day with Largest Response
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
4 CP Days
42
Hour-ending 17:00 Reductions on 4 CP Days – 2010
Responding NWS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
21-Jun-10 8.2 8.2 0.0 49.0 25.5 23.4 93.0 57.6 35.4 150.2 91.3 58.9
16-Jul-10 12.6 12.1 0.5 74.6 60.3 14.3 110.3 76.8 33.5 197.5 149.2 48.3
23-Aug-10 13.2 13.2 0.0 61.3 42.7 18.6 132.5 86.1 46.4 206.9 141.9 65.0
14-Sep-10 12.1 11.7 0.4 59.1 49.7 9.4 91.2 55.4 35.8 162.4 116.8 45.5
20-Aug-10 73.3 73.3 0.0 84.7 76.3 8.4 106.7 73.0 33.6 264.7 222.6 42.0
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
4 CP Days
Near CP Day with Largest Response
43
Hour-ending 17:00 Reductions on 4 CP Days – 2011
Responding NWS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
15-Jun-11 27.2 24.7 2.5 73.6 49.8 23.8 96.7 63.5 33.1 197.5 138.1 59.5
27-Jul-11 24.9 24.6 0.3 64.5 45.0 19.5 110.2 76.8 33.4 199.6 146.4 53.3
3-Aug-11 23.6 23.0 0.6 99.2 66.5 32.7 141.2 108.5 32.7 264.0 198.0 66.0
24-Sep-11 19.6 17.6 2.1 96.8 79.8 17.0 160.6 127.6 33.1 277.0 224.9 52.1
2-Aug-11 14.3 13.9 0.4 80.9 50.9 30.0 124.6 91.7 32.9 219.8 156.6 63.2
4 CP Days
Near CP Day with Largest Response
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
44
Hour-ending 17:00 Reductions on 4 CP Days – 2012
Responding NWS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
26-Jun-12 37.7 30.8 6.8 84.1 69.3 14.8 116.2 70.3 45.9 238.0 170.4 67.5
31-Jul-12 24.8 24.7 0.1 94.6 82.4 12.2 124.3 80.5 43.8 243.6 187.6 56.1
1-Aug-12 12.9 12.0 0.9 89.6 78.2 11.4 120.8 80.8 40.0 223.4 171.1 52.3
5-Sep-12 24.3 24.3 0.0 79.0 65.5 13.6 113.3 72.7 40.6 216.7 162.4 54.2
7-Sep-12 44.3 44.3 0.0 119.0 102.7 16.4 133.4 87.7 45.7 296.7 234.6 62.1
4 CP Days
Near CP Day with Largest Response
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
45
Hour-ending 17:00 Reductions on 4 CP Days - 2013
Responding NWS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
27-Jun-13 35.4 33.1 2.3 90.2 71.9 18.3 117.3 80.4 36.9 242.9 185.4 57.5
31-Jul-13 39.0 38.4 0.6 78.7 62.9 15.8 112.4 70.3 42.1 230.1 171.6 58.5
7-Aug-13 37.9 37.7 0.1 109.0 88.8 20.1 120.2 79.1 41.1 267.0 205.6 61.4
3-Sep-13 34.9 34.3 0.6 72.2 52.8 19.3 117.0 73.2 43.8 224.0 160.3 63.7
1-Aug-13 33.4 33.3 0.2 99.9 84.2 15.7 117.4 73.3 44.1 250.8 190.8 60.0 Near CP Day with Largest Response
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
4 CP Days
46
Hour-ending 17:00 MW Reductions on 4 CP Days - 2014
Responding NWS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
16-Jun-14 51.4 50.8 0.6 102.9 84.8 18.1 108.8 63.8 45.1 263.2 199.4 63.8
21-Jul-14 9.4 8.2 1.2 62.3 46.4 16.0 99.3 54.6 44.7 171.1 109.2 62.0
25-Aug-14 78.6 76.4 2.1 106.2 85.4 20.8 134.5 82.5 52.0 319.3 244.3 75.0
10-Sep-14 73.0 71.6 1.4 121.7 90.2 31.5 121.9 72.0 49.9 316.7 233.9 82.8
8-Aug-14 45.0 43.8 1.1 103.1 88.1 15.0 130.4 95.5 34.9 278.4 227.4 51.0
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
4 CP Days
Near CP Day with Largest Response
47
Appendix 4 – Distribution WS MW Response
48
Hour-ending 17:00 Reductions on 4 CP Days - 2009
Responding WS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
25-Jun-09 1.7 1.7 0.1 18.2 16.1 2.1 3.0 2.1 0.9 23.0 19.9 3.1
13-Jul-09 1.5 1.4 0.1 7.8 5.7 2.0 2.3 1.6 0.7 11.6 8.7 2.9
5-Aug-09 2.3 2.2 0.1 11.8 10.7 1.2 2.6 2.0 0.6 16.7 14.9 1.9
3-Sep-09 1.4 1.3 0.1 7.3 6.0 1.3 2.4 2.0 0.5 11.1 9.3 1.9
24-Jun-09 3.4 3.3 0.1 17.4 15.4 1.9 2.5 1.7 0.8 23.3 20.5 2.9
Reductions for Hour Ending 17:00
4 CP Days
Medium Load Factor Low Load Factor TotalHigh Load Factor
Near CP Day with Largest Response
49
Hour-ending 17:00 Reductions on 4 CP Days - 2010
Responding WS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
21-Jun-10 1.2 1.0 0.2 5.8 4.9 1.0 0.8 0.7 0.1 7.8 6.6 1.2
16-Jul-10 2.1 1.9 0.2 6.9 5.6 1.2 0.3 0.3 0.1 9.3 7.8 1.4
23-Aug-10 3.7 3.4 0.3 12.4 11.4 1.0 0.5 0.4 0.0 16.6 15.2 1.3
14-Sep-10 1.1 1.0 0.1 4.9 4.3 0.6 0.2 0.2 0.0 6.1 5.5 0.7
20-Aug-10 3.0 2.8 0.1 12.3 11.5 0.8 0.3 0.3 0.0 15.6 14.6 1.0 Near CP Day with Largest Response
Reductions for Hour Ending 17:00
4 CP Days
Medium Load Factor Low Load Factor TotalHigh Load Factor
50
Hour-ending 17:00 Reductions on 4 CP Days - 2011
Responding WS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
15-Jun-11 6.5 6.4 0.1 12.3 10.1 2.2 0.9 0.6 0.4 19.7 17.1 2.6
27-Jul-11 3.3 3.3 0.0 9.5 8.2 1.4 0.8 0.4 0.3 13.6 11.9 1.7
3-Aug-11 5.9 5.9 0.0 21.4 19.9 1.5 0.6 0.4 0.2 28.0 26.3 1.7
24-Sep-11 7.0 6.9 0.0 19.0 17.2 1.8 1.5 1.3 0.3 27.5 25.4 2.1
2-Aug-11 6.4 6.3 0.1 19.4 18.0 1.4 0.8 0.6 0.2 26.5 24.9 1.7
Reductions for Hour Ending 17:00
4 CP Days
Medium Load Factor Low Load Factor TotalHigh Load Factor
Near CP Day with Largest Response
51
Hour-ending 17:00 Reductions on 4 CP Days - 2012
Responding WS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
26-Jun-12 15.9 15.8 0.1 51.8 50.4 1.4 3.1 2.2 0.9 70.7 68.4 2.4
31-Jul-12 6.4 6.2 0.2 26.0 25.4 0.6 1.7 1.2 0.5 34.1 32.7 1.4
1-Aug-12 7.0 7.0 0.0 24.7 24.2 0.6 1.6 1.1 0.5 33.3 32.2 1.1
5-Sep-12 3.8 3.8 0.0 15.0 14.2 0.8 1.2 0.7 0.5 20.1 18.7 1.3
7-Sep-12 4.2 4.2 0.0 15.6 14.2 1.4 1.3 0.7 0.5 21.1 19.2 2.0
Reductions for Hour Ending 17:00
4 CP Days
Medium Load Factor Low Load Factor TotalHigh Load Factor
Near CP Day with Largest Response
52
Hour-ending 17:00 Reductions on 4 CP Days - 2013
Responding WS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
27-Jun-13 2.3 2.3 0.0 10.0 4.0 6.0 0.5 0.4 0.1 12.8 6.7 6.1
31-Jul-13 1.5 1.5 0.0 4.5 3.8 0.7 0.2 0.1 0.1 6.3 5.4 0.9
7-Aug-13 2.2 2.2 0.0 11.7 4.5 7.2 0.7 0.5 0.2 14.6 7.2 7.4
3-Sep-13 1.8 1.8 0.0 5.3 2.0 3.3 0.3 0.2 0.1 7.4 3.9 3.4
1-Aug-13 2.7 2.7 0.0 10.6 7.6 3.0 0.6 0.4 0.2 13.9 10.7 3.2
Reductions for Hour Ending 17:00
4 CP Days
Medium Load Factor Low Load Factor TotalHigh Load Factor
Near CP Day with Largest Response
53
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Responding WS Distribution Connected ESIIDs
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
16-Jun-14 9.0 8.6 0.4 14.0 5.4 8.6 0.9 0.1 0.8 23.9 14.0 9.9
21-Jul-14 2.8 2.2 0.5 14.7 5.7 9.0 1.4 0.6 0.9 18.8 8.5 10.4
25-Aug-14 10.7 10.0 0.8 23.1 9.9 13.1 1.9 0.5 1.4 35.6 20.4 15.2
10-Sep-14 11.7 11.0 0.7 24.5 11.2 13.3 2.0 0.5 1.4 38.2 22.8 15.4
8-Aug-14 8.6 7.9 0.7 17.3 4.0 13.3 1.4 0.2 1.2 27.3 12.1 15.1
Reductions for Hour Ending 17:00
4 CP Days
Medium Load Factor Low Load Factor TotalHigh Load Factor
Near CP Day with Largest Response
54
Appendix 5 – Total MW Response
55
Hour-ending 17:00 Reductions on 4 CP Days - 2009
All Responding 4-CP ESIIDS
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
25-Jun-09 88.7 69.5 19.3 164.9 133.0 31.9 262.8 205.8 56.9 516.4 408.3 108.1
13-Jul-09 73.8 57.1 16.7 151.5 97.1 54.4 159.8 106.2 53.7 385.1 260.4 124.7
5-Aug-09 89.3 72.6 16.8 153.3 107.7 45.6 301.4 226.0 75.4 544.0 406.2 137.8
3-Sep-09 88.9 77.4 11.5 153.3 111.8 41.5 210.4 165.7 44.7 452.6 354.9 97.7
24-Jun-09 105.1 83.2 22.0 161.8 118.8 43.0 257.4 195.5 61.9 524.3 397.4 126.9
Low Load Factor
Near CP Day with Largest Response
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Total
4 CP Days
56
Hour-ending 17:00 Reductions on 4 CP Days - 2010
All Responding 4-CP ESIIDS
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
21-Jun-10 85.6 67.1 18.4 120.7 39.1 81.6 126.1 63.8 62.3 332.3 170.0 162.3
16-Jul-10 68.7 49.9 18.7 137.7 84.5 53.2 242.1 181.2 60.9 448.5 315.7 132.8
23-Aug-10 98.8 76.4 22.4 164.4 83.3 81.0 196.3 98.2 98.1 459.5 257.9 201.5
14-Sep-10 112.3 75.6 36.7 127.8 67.3 60.5 231.5 168.7 62.7 471.5 311.7 159.9
20-Aug-10 203.5 194.1 9.5 207.4 148.5 58.8 145.5 79.6 65.8 556.4 422.2 134.1
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
4 CP Days
Near CP Day with Largest Response
57
Hour-ending 17:00 Reductions on 4 CP Days - 2011
All Responding 4-CP ESIIDS
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
15-Jun-11 112.6 106.0 6.6 196.4 86.0 110.4 315.7 254.8 60.9 624.7 446.8 177.9
27-Jul-11 117.3 95.3 22.1 208.1 84.6 123.5 241.4 193.3 48.1 566.8 373.1 193.6
3-Aug-11 118.7 96.4 22.3 250.8 119.5 131.2 346.0 288.8 57.2 715.5 504.8 210.7
24-Sep-11 100.0 88.3 11.7 205.3 122.5 82.7 328.2 268.6 59.5 633.5 479.5 154.0
2-Aug-11 102.1 101.6 0.4 240.9 107.4 133.5 300.8 255.1 45.7 643.8 464.2 179.6
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
4 CP Days
Near CP Day with Largest Response
58
Hour-ending 17:00 Reductions on 4 CP Days - 2012
All Responding 4-CP ESIIDS
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
26-Jun-12 147.8 139.1 8.7 274.7 177.9 96.8 303.5 229.7 73.8 726.1 546.8 179.3
31-Jul-12 137.7 137.3 0.3 233.3 139.2 94.1 223.1 146.5 76.5 594.0 423.1 170.9
1-Aug-12 87.2 86.3 0.9 205.5 116.9 88.6 213.0 151.7 61.3 505.6 354.8 150.7
5-Sep-12 144.2 133.4 10.8 201.6 123.6 78.0 297.9 237.3 60.6 643.7 494.3 149.4
7-Sep-12 155.9 153.1 2.8 237.0 160.9 76.1 304.9 240.5 64.4 697.8 554.4 143.4
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Low Load Factor Total
4 CP Days
Near CP Day with Largest Response
59
Hour-ending 17:00 Reductions on 4 CP Days - 2013
All Responding 4-CP ESIIDS
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
27-Jun-13 110.7 104.9 5.8 209.8 149.1 60.6 257.6 190.9 66.8 578.1 444.9 133.2
31-Jul-13 152.0 115.5 36.5 201.1 151.7 49.4 240.3 168.2 72.1 593.4 435.4 158.0
7-Aug-13 115.5 94.1 21.4 220.3 176.3 44.1 249.3 184.4 64.9 585.1 454.8 130.3
3-Sep-13 137.7 106.4 31.4 183.0 93.5 89.5 148.2 92.1 56.0 468.9 292.0 176.9
1-Aug-13 113.4 92.9 20.4 201.2 153.7 47.5 268.1 197.2 71.0 582.8 443.8 138.9
Low Load Factor
Near CP Day with Largest Response
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Total
4 CP Days
60
Hour-ending 17:00 MW Reductions on 4 CP Days - 2014
All Responding 4-CP ESIIDS
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
16-Jun-14 159.4 138.4 21.0 241.7 165.5 76.1 242.0 173.4 68.7 643.1 477.3 165.8
21-Jul-14 37.5 30.5 7.0 112.7 66.1 46.6 149.0 87.1 62.0 299.2 183.6 115.5
25-Aug-14 199.4 164.9 34.5 252.0 174.3 77.7 263.8 187.8 76.0 715.2 526.9 188.2
10-Sep-14 204.3 164.4 39.8 273.9 183.8 90.1 301.5 207.0 94.5 779.6 555.2 224.4
8-Aug-14 125.5 117.6 7.9 219.8 165.7 54.1 278.8 221.6 57.2 624.2 504.9 119.3
Reductions for Hour Ending 17:00
High Load Factor Medium Load Factor Total
4 CP Days
Near CP Day with Largest Response
Low Load Factor
61
Appendix 6 – Reductions by Voltage Level
DSWG Loads in SCEDv1April 23, 2014
62
Hour-ending 17:00 Reductions on 4 CP Days - 2009
Reductions by Voltage Group
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
25-Jun-09 307.5 250.7 56.8 185.9 137.7 48.2 23.0 19.9 3.1 516.4 408.3 108.1
13-Jul-09 226.7 164.7 61.9 146.9 86.9 60.0 11.6 8.7 2.9 385.1 260.4 124.7
5-Aug-09 366.3 278.5 87.8 161.0 112.9 48.1 16.7 14.9 1.9 544.0 406.2 137.8
3-Sep-09 284.3 236.7 47.6 157.2 108.9 48.2 11.1 9.3 1.9 452.6 354.9 97.7
24-Jun-09 323.8 249.0 74.8 177.2 128.0 49.2 23.3 20.5 2.9 524.3 397.4 126.9 Near CP Day with Largest Response
4 CP Days
Reductions for Hour Ending 17:00
Transmission Distribution Non-Weather Sensitive Distribution Weather Sensitive Total
63
Hour-ending 17:00 Reductions on 4 CP Days - 2010
Reductions by Voltage Group
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
21-Jun-10 174.3 72.1 102.2 150.2 91.3 58.9 7.8 6.6 1.2 332.3 170.0 162.3
16-Jul-10 241.7 158.6 83.1 197.5 149.2 48.3 9.3 7.8 1.4 448.5 315.7 132.8
23-Aug-10 236.0 100.8 135.2 206.9 141.9 65.0 16.6 15.2 1.3 459.5 257.9 201.5
14-Sep-10 303.0 189.3 113.6 162.4 116.8 45.5 6.1 5.5 0.7 471.5 311.7 159.9
20-Aug-10 276.1 185.0 91.1 264.7 222.6 42.0 15.6 14.6 1.0 556.4 422.2 134.1
4 CP Days
Reductions for Hour Ending 17:00
Transmission Distribution Non-Weather Sensitive Distribution Weather Sensitive Total
Near CP Day with Largest Response
64
Hour-ending 17:00 Reductions on 4 CP Days - 2011
Reductions by Voltage Group
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
15-Jun-11 407.4 291.6 115.8 197.5 138.1 59.5 19.7 17.1 2.6 624.7 446.8 177.9
27-Jul-11 353.6 214.9 138.7 199.6 146.4 53.3 13.6 11.9 1.7 566.8 373.1 193.6
3-Aug-11 423.5 280.5 143.0 264.0 198.0 66.0 28.0 26.3 1.7 715.5 504.8 210.7
24-Sep-11 329.0 229.2 99.8 277.0 224.9 52.1 27.5 25.4 2.1 633.5 479.5 154.0
14-Jul-11 397.5 282.8 114.7 219.8 156.6 63.2 26.5 24.9 1.7 643.8 464.2 179.6
4 CP Days
Reductions for Hour Ending 17:00
Transmission Distribution Non-Weather Sensitive Distribution Weather Sensitive Total
Near CP Day with Largest Response
65
Hour-ending 17:00 Reductions on 4 CP Days - 2012
Reductions by Voltage Group
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
26-Jun-12 417.4 308.0 109.4 238.0 170.4 67.5 70.7 68.4 2.4 726.1 546.8 179.3
31-Jul-12 316.3 202.8 113.5 243.6 187.6 56.1 34.1 32.7 1.4 594.0 423.1 170.9
1-Aug-12 248.9 151.6 97.3 223.4 171.1 52.3 33.3 32.2 1.1 505.6 354.8 150.7
5-Sep-12 407.0 313.2 93.8 216.7 162.4 54.2 20.1 18.7 1.3 643.7 494.3 149.4
7-Sep-12 379.9 300.6 79.3 296.7 234.6 62.1 21.1 19.2 2.0 697.8 554.4 143.4
4 CP Days
Reductions for Hour Ending 17:00
Transmission Distribution Non-Weather Sensitive Distribution Weather Sensitive Total
Near CP Day with Largest Response
66
Hour-ending 17:00 Reductions on 4 CP Days - 2013
Reductions by Voltage Group
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
27-Jun-13 322.5 252.8 69.7 242.9 185.4 57.5 12.8 6.7 6.1 578.1 444.9 133.2
31-Jul-13 357.0 258.4 98.6 230.1 171.6 58.5 6.3 5.4 0.9 593.4 435.4 158.0
7-Aug-13 303.5 241.9 61.6 267.0 205.6 61.4 14.6 7.2 7.4 585.1 454.8 130.3
3-Sep-13 237.5 127.7 109.7 224.0 160.3 63.7 7.4 3.9 3.4 468.9 292.0 176.9
1-Aug-13 318.0 242.3 75.7 250.8 190.8 60.0 13.9 10.7 3.2 582.8 443.8 138.9 Near CP Day with Largest Response
4 CP Days
Reductions for Hour Ending 17:00
Transmission Distribution Non-Weather Sensitive Distribution Weather Sensitive Total
67
Hour-ending 17:00 MW Reductions on 4 CP Days - 2014
Reductions by Voltage Group
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
Total Response
Peak Response
Day Response
16-Jun-14 355.9 263.8 92.1 263.2 199.4 63.8 23.9 14.0 9.9 643.1 477.3 165.8
21-Jul-14 109.2 66.0 43.2 171.1 109.2 62.0 18.8 8.5 10.4 299.2 183.6 115.5
25-Aug-14 360.3 262.3 98.0 319.3 244.3 75.0 35.6 20.4 15.2 715.2 526.9 188.2
10-Sep-14 424.8 298.6 126.2 316.7 233.9 82.8 38.2 22.8 15.4 779.6 555.2 224.4
8-Aug-14 318.5 265.3 53.2 278.4 227.4 51.0 27.3 12.1 15.1 624.2 504.9 119.3 Near CP Day with Largest Response
4 CP Days
Reductions for Hour Ending 17:00
Transmission Distribution Non-Weather Sensitive Distribution Weather Sensitive Total
68
Appendix 7 – Reductions as a Percent of Total Load
DSWG Loads in SCEDv1April 23, 2014
69
Hour-ending 17:00 Reductions on 4 CP Days - 2009
Reductions as a Percent of Total Voltage Group Load
Total ReductionResponders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
25-Jun-09 88.7 232.9 2,914.8 3,147.7 2.8% 164.9 697.1 6,217.3 6,914.4 2.4%
13-Jul-09 73.8 192.0 3,019.4 3,211.4 2.3% 151.5 486.5 6,565.6 7,052.1 2.1%
5-Aug-09 89.3 227.0 2,951.3 3,178.3 2.8% 153.3 513.2 6,506.0 7,019.1 2.2%
3-Sep-09 88.9 201.2 2,955.1 3,156.3 2.8% 153.3 449.3 6,188.6 6,637.9 2.3%
25-Jun-09 262.8 633.6 920.6 1,554.2 16.9% 516.4 1,563.5 10,052.7 11,616.3 4.4%
13-Jul-09 159.8 342.9 1,042.0 1,384.9 11.5% 385.1 1,021.4 10,627.0 11,648.4 3.3%
5-Aug-09 301.4 583.0 997.1 1,580.2 19.1% 544.0 1,323.2 10,454.5 11,777.6 4.6%
3-Sep-09 210.4 421.9 1,204.8 1,626.7 12.9% 452.6 1,072.4 10,348.5 11,420.9 4.0%
CP Date
Low Load FactorTotal
High Load Factor MW Medium Load Factor MW
70
Hour-ending 17:00 Reductions on 4 CP Days - 2009
Reductions as a Percent of Total Voltage Group Load
Total ReductionResponders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
21-Jun-10 85.6 214.6 5,910.9 6,125.5 1.4% 120.7 388.6 5,596.9 5,985.5 2.0%
16-Jul-10 68.7 246.2 5,887.6 6,133.8 1.1% 137.7 611.2 5,290.6 5,901.8 2.3%
23-Aug-10 98.8 347.3 5,812.0 6,159.2 1.6% 164.4 573.2 5,628.5 6,201.8 2.7%
14-Sep-10 112.3 346.1 5,606.5 5,952.6 1.9% 127.8 475.4 5,512.3 5,987.7 2.1%
21-Jun-10 126.1 325.2 1,088.9 1,414.1 8.9% 332.3 928.4 12,596.7 13,525.0 2.5%
16-Jul-10 242.1 512.8 838.9 1,351.7 17.9% 448.5 1,370.2 12,017.1 13,387.4 3.4%
23-Aug-10 196.3 532.9 1,017.9 1,550.8 12.7% 459.5 1,453.4 12,458.4 13,911.8 3.3%
14-Sep-10 231.5 476.9 1,197.3 1,674.3 13.8% 471.5 1,298.5 12,316.1 13,614.6 3.5%
Low Load FactorTotal
High Load Factor MW Medium Load Factor MWCP Date
71
Hour-ending 17:00 Reductions on 4 CP Days - 2010
Reductions as a Percent of Total Voltage Group Load
Total ReductionResponders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
15-Jun-11 112.6 387.4 6,094.5 6,481.9 1.7% 196.4 636.9 5,981.2 6,618.1 3.0%
27-Jul-11 117.3 277.7 6,213.3 6,491.0 1.8% 208.1 668.8 6,099.1 6,767.9 3.1%
3-Aug-11 118.7 377.7 6,212.5 6,590.2 1.8% 250.8 906.5 5,964.2 6,870.7 3.6%
24-Sep-11 100.0 421.9 6,069.7 6,491.6 1.5% 205.3 841.9 5,545.3 6,387.2 3.2%
15-Jun-11 315.7 612.3 880.5 1,492.9 21.1% 624.7 1,636.6 12,956.3 14,592.9 4.3%
27-Jul-11 241.4 464.1 965.6 1,429.8 16.9% 566.8 1,410.6 13,278.1 14,688.8 3.9%
3-Aug-11 346.0 624.7 900.9 1,525.5 22.7% 715.5 1,908.8 13,077.5 14,986.3 4.8%
24-Sep-11 328.2 733.2 790.6 1,523.9 21.5% 633.5 1,997.0 12,405.7 14,402.7 4.4%
CP Date
Low Load FactorTotal
High Load Factor MW Medium Load Factor MW
72
Hour-ending 17:00 Reductions on 4 CP Days - 2011
Reductions as a Percent of Total Voltage Group Load
Total ReductionResponders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
26-Jun-12 147.8 590.5 5,342.1 5,932.6 2.5% 274.7 1,176.6 5,870.7 7,047.3 3.9%
31-Jul-12 137.7 427.1 5,428.9 5,856.0 2.4% 233.3 967.8 6,005.3 6,973.1 3.3%
1-Aug-12 87.2 274.8 5,623.2 5,898.0 1.5% 205.5 832.2 6,201.1 7,033.3 2.9%
5-Sep-12 144.2 431.9 5,476.5 5,908.5 2.4% 201.6 770.3 6,166.9 6,937.2 2.9%
26-Jun-12 303.5 533.3 834.1 1,367.4 22.2% 726.1 2,300.4 12,046.9 14,347.3 5.1%
31-Jul-12 223.1 447.4 893.1 1,340.6 16.6% 594.0 1,842.3 12,327.4 14,169.7 4.2%
1-Aug-12 213.0 489.4 907.5 1,396.9 15.2% 505.6 1,596.3 12,731.8 14,328.1 3.5%
5-Sep-12 297.9 509.2 1,112.1 1,621.3 18.4% 643.7 1,711.4 12,755.6 14,467.0 4.4%
CP Date
Low Load Factor Total
High Load Factor MW Medium Load Factor MW
73
Hour-ending 17:00 Reductions on 4 CP Days - 2012
Reductions as a Percent of Total Voltage Group Load
Total ReductionResponders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
26-Jun-12 139.2 397.5 5,517.4 5,914.9 2.4% 233.7 745.4 6,257.2 7,002.6 3.3%
31-Jul-12 135.4 321.6 5,523.5 5,845.1 2.3% 214.7 618.6 6,333.2 6,951.8 3.1%
1-Aug-12 83.5 162.3 5,722.8 5,885.1 1.4% 180.2 493.8 6,511.3 7,005.0 2.6%
4-Sep-12 130.2 328.5 5,559.7 5,888.2 2.2% 168.1 491.0 6,392.2 6,883.3 2.4%
26-Jun-12 302.2 522.9 855.9 1,378.8 21.9% 675.0 1,665.8 12,630.5 14,296.3 4.7%
31-Jul-12 225.8 438.2 916.5 1,354.7 16.7% 575.9 1,378.4 12,773.2 14,151.6 4.1%
1-Aug-12 213.7 482.6 927.2 1,409.8 15.2% 477.3 1,138.6 13,161.2 14,299.9 3.3%
4-Sep-12 211.7 425.7 1,115.5 1,541.1 13.7% 510.0 1,245.3 13,067.3 14,312.6 3.6%
Low Load FactorTotal
High Load Factor MW Medium Load Factor MWCP Date
74
Hour-ending 17:00 Reductions on 4 CP Days - 2013
Reductions as a Percent of Total Voltage Group Load
Total ReductionResponders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total LoadResponse as
Percent of Total Load
27-Jun-13 110.7 319.1 5,221.8 5,540.8 2.0% 209.8 783.8 5,624.1 6,407.9 3.3%
31-Jul-13 152.0 379.4 5,188.9 5,568.2 2.7% 201.1 648.4 5,697.4 6,345.8 3.2%
7-Aug-13 115.5 328.4 5,184.5 5,512.9 2.1% 220.3 850.6 5,612.1 6,462.7 3.4%
3-Sep-13 137.7 396.3 5,149.3 5,545.6 2.5% 183.0 627.0 5,640.9 6,268.0 2.9%
27-Jun-13 257.6 481.7 915.7 1,397.4 18.4% 578.1 1,584.6 11,761.6 13,346.1 4.3%
31-Jul-13 240.3 491.2 883.7 1,374.9 17.5% 593.4 1,519.0 11,769.9 13,288.9 4.5%
7-Aug-13 249.3 470.8 1,004.7 1,475.5 16.9% 585.1 1,649.9 11,801.2 13,451.1 4.3%
3-Sep-13 148.2 365.8 1,138.1 1,503.9 9.9% 468.9 1,389.2 11,928.3 13,317.5 3.5%
CP Date
Low Load FactorTotal
High Load Factor MW Medium Load Factor MW
75
Hour-ending 17:00 MW Reductions on 4 CP Days - 2014
Reductions as a Percent of Total Voltage Group Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total Load
Response as Percent of Total
Load
Total Reduction
Responders Total Load
Non-Responders Total Load
Total Load
Response as Percent of Total
Load
16-Jun-14 159.4 527.8 5,436.6 5,964.4 2.7% 241.7 769.8 5,967.0 6,736.9 3.6%
21-Jul-14 37.5 277.8 5,782.9 6,060.7 0.6% 112.7 563.9 6,344.9 6,908.8 1.6%
25-Aug-14 199.4 570.0 5,473.0 6,043.0 3.3% 252.0 868.2 6,115.1 6,983.3 3.6%
10-Sep-14 204.3 625.2 5,417.4 6,042.6 3.4% 273.9 874.5 6,036.3 6,910.9 4.0%
16-Jun-14 242.0 409.1 850.9 1,260.0 19.2% 643.1 1,706.7 12,254.6 13,961.3 4.6%
21-Jul-14 149.0 325.7 987.5 1,313.2 11.3% 299.2 1,167.3 13,115.3 14,282.7 2.1%
25-Aug-14 263.8 506.6 1,095.6 1,602.2 16.5% 715.2 1,944.7 12,683.8 14,628.5 4.9%
10-Sep-14 301.5 492.4 1,115.4 1,607.8 18.8% 779.6 1,992.1 12,569.1 14,561.2 5.4%
Low Load Factor Total
High Load Factor MW Medium Load Factor MWCP Date
76
Appendix 8 – Percent of Load by Group
DSWG Loads in SCEDv1April 23, 2014
77
Hour-ending 17:00 Reductions on 4 CP Days - 2009
Percentage of Load Reduction by Load Factor and Voltage Group
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction25-Jun-09 88.7 17.2% 164.9 31.9% 262.8 50.9% 516.4
13-Jul-09 73.8 19.2% 151.5 39.3% 159.8 41.5% 385.1
5-Aug-09 89.3 16.4% 153.3 28.2% 301.4 55.4% 544.0
3-Sep-09 88.9 19.6% 153.3 33.9% 210.4 46.5% 452.6
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction25-Jun-09 307.5 59.6% 185.9 36.0% 23.0 4.5% 516.4
13-Jul-09 226.7 58.9% 146.9 38.1% 11.6 3.0% 385.1
5-Aug-09 366.3 67.3% 161.0 29.6% 16.7 3.1% 544.0
3-Sep-09 284.3 62.8% 157.2 34.7% 11.1 2.5% 452.6
Medium Load Factor Low Load FactorTotal
Reduction
Distribution NWS Distribution WS
High Load Factor
TransmissionTotal
Reduction
78
Hour-ending 17:00 Reductions on 4 CP Days - 2010
Percentage of Load Reduction by Load Factor and Voltage Group
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction21-Jun-10 85.6 25.8% 120.7 36.3% 126.1 37.9% 332.3
16-Jul-10 68.7 15.3% 137.7 30.7% 242.1 54.0% 448.5
23-Aug-10 98.8 21.5% 164.4 35.8% 196.3 42.7% 459.5
14-Sep-10 112.3 23.8% 127.8 27.1% 231.5 49.1% 471.5
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction21-Jun-10 174.3 52.4% 150.2 45.2% 7.8 2.4% 332.3
16-Jul-10 241.7 53.9% 197.5 44.0% 9.3 2.1% 448.5
23-Aug-10 236.0 51.4% 206.9 45.0% 16.6 3.6% 459.5
14-Sep-10 303.0 64.3% 162.4 34.4% 6.1 1.3% 471.5
Distribution WSTotal
Reduction
Transmission Distribution NWS
High Load Factor Medium Load Factor Low Load FactorTotal
Reduction
79
Hour-ending 17:00 Reductions on 4 CP Days - 2011
Percentage of Load Reduction by Load Factor and Voltage Group
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction15-Jun-11 112.6 18.0% 196.4 31.4% 315.7 50.5% 624.7
27-Jul-11 117.3 20.7% 208.1 36.7% 241.4 42.6% 566.8
3-Aug-11 118.7 16.6% 250.8 35.0% 346.0 48.4% 715.5
24-Sep-11 100.0 15.8% 205.3 32.4% 328.2 51.8% 633.5
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction15-Jun-11 407.4 65.2% 197.5 31.6% 19.7 3.2% 624.7
27-Jul-11 353.6 62.4% 199.6 35.2% 13.6 2.4% 566.8
3-Aug-11 423.5 59.2% 264.0 36.9% 28.0 3.9% 715.5
24-Sep-11 329.0 51.9% 277.0 43.7% 27.5 4.3% 633.5
High Load Factor Medium Load Factor Low Load FactorTotal
Reduction
Total Reduction
Transmission Distribution NWS Distribution WS
80
Hour-ending 17:00 Reductions on 4 CP Days - 2012
Percentage of Load Reduction by Load Factor and Voltage Group
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction26-Jun-12 147.8 20.4% 274.7 37.8% 303.5 41.8% 726.1
31-Jul-12 137.7 23.2% 233.3 39.3% 223.1 37.6% 594.0
1-Aug-12 87.2 17.2% 205.5 40.6% 213.0 42.1% 505.6
5-Sep-12 144.2 22.4% 201.6 31.3% 297.9 46.3% 643.7
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction26-Jun-12 417.4 57.5% 238.0 32.8% 70.7 9.7% 726.1
31-Jul-12 316.3 53.2% 243.6 41.0% 34.1 5.7% 594.0
1-Aug-12 248.9 49.2% 223.4 44.2% 33.3 6.6% 505.6
5-Sep-12 407.0 63.2% 216.7 33.7% 20.1 3.1% 643.7
High Load Factor Medium Load Factor Low Load FactorTotal
Reduction
Total Reduction
Transmission Distribution NWS Distribution WS
81
Hour-ending 17:00 Reductions on 4 CP Days - 2013
Percentage of Load Reduction by Load Factor and Voltage Group
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction27-Jun-13 110.7 19.2% 209.8 36.3% 257.6 44.6% 578.1
31-Jul-13 152.0 25.6% 201.1 33.9% 240.3 40.5% 593.4
7-Aug-13 115.5 19.7% 220.3 37.7% 249.3 42.6% 585.1
3-Sep-13 137.7 29.4% 183.0 39.0% 148.2 31.6% 468.9
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction27-Jun-13 322.5 55.8% 242.9 42.0% 12.8 2.2% 578.1
31-Jul-13 357.0 60.2% 230.1 38.8% 6.3 1.1% 593.4
7-Aug-13 303.5 51.9% 267.0 45.6% 14.6 2.5% 585.1
3-Sep-13 237.5 50.6% 224.0 47.8% 7.4 1.6% 468.9
Medium Load Factor Low Load FactorTotal
Reduction
Distribution NWS Distribution WS
High Load Factor
TransmissionTotal
Reduction
82
Hour-ending 17:00 Reductions on 4 CP Days - 2014
Percentage of Load Reduction by Load Factor and Voltage Group
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction16-Jun-14 159.4 24.8% 241.7 37.6% 242.0 37.6% 643.1
21-Jul-14 37.5 12.5% 112.7 37.7% 149.0 49.8% 299.2
25-Aug-14 199.4 27.9% 252.0 35.2% 263.8 36.9% 715.2
10-Sep-14 204.3 26.2% 273.9 35.1% 301.5 38.7% 779.6
4 CP DaysTotal
Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction
Total Reduction
Percent of Total
Reduction16-Jun-14 355.9 55.3% 263.2 40.9% 23.9 3.7% 643.1
21-Jul-14 109.2 36.5% 171.1 57.2% 18.8 6.3% 299.2
25-Aug-14 360.3 50.4% 319.3 44.6% 35.6 5.0% 715.2
10-Sep-14 424.8 54.5% 316.7 40.6% 38.2 4.9% 779.6
TransmissionTotal
Reduction
Distribution NWS Distribution WS
High Load Factor Medium Load Factor Low Load FactorTotal
Reduction
83
Appendix 9 – CP Day Graphs
DSWG Loads in SCEDv1April 23, 2014
84
Hour-ending 17:00 Reductions on 4 CP Days - 2009
DSWG Loads in SCEDv1April 23, 2014
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 25, 2009
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 3, 2009
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 13, 2009
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 5, 2009
Actual Baseline Reduce HR 17:00
85
Hour-ending 17:00 Reductions on 4 CP Days - 2010
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 21, 2010
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 14, 2010
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 16, 2010
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 23, 2010
Actual Baseline Reduce HR 17:00
86
Hour-ending 17:00 Reductions on 4 CP Days - 2011
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 15, 2011
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 2, 2011
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 27, 2011
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 3, 2011
Actual Baseline Reduce HR 17:00
87
Hour-ending 17:00 Reductions on 4 CP Days - 2012
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
1600.0
1800.0
2000.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 26, 2012
Actual Baseline Reduce HR 17:00
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
1600.0
1800.0
2000.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 4, 2012
Actual Baseline Reduce HR 17:00
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
1600.0
1800.0
2000.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 31, 2012
Actual Baseline Reduce HR 17:00
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
1600.0
1800.0
2000.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 1, 2012
Actual Baseline Reduce HR 17:00
88
Hour-ending 17:00 Reductions on 4 CP Days - 2013
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 27, 2013
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 3, 2013
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 31, 2013
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 7, 2013
Actual Baseline Reduce HR 17:00
89
Hour-ending 17:00 Reductions on 4 CP Days - 2014
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
June 30, 2014
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
September 10, 2014
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
August 25, 2014
Actual Baseline Reduce HR 17:00
0.0
500.0
1000.0
1500.0
2000.0
2500.0
0 10 20 30 40 50 60 70 80 90
MW
Interval
July 21, 2014
Actual Baseline Reduce HR 17:00