Dyckman Avenueover Black River:A Movable Bridge

RehabilitationSouth Haven, Michigan

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 1

• Project Location

• History

• Condition Assessment

• Funding

• Design

• Construction

• Acknowledgements

• Questions

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 2

Summary of Presentation

Location of South Haven, Michigan

Project Location

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 3

Location of Dyckman Ave Bridge

Project Location

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 4

• Four Movable Bridges at Dyckman Avenue

crossing of the Black River

• First Bridge constructed in 1856

• Construction cost was $1,120

• Timber drawbridge

• Second Bridge constructed in 1877

• Timber drawbridge

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 5

History

• Third Bridge constructed in 1890

• Steel through Truss Swing Bridge

• In service for 78 years

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 6

History

• Current Bridge constructed in 1967-68

• Designed by State Highway Department

• Cost of Construction was $782,157

• Double Bascule Span

• Hydraulic Cylinders as Prime Mover

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 7

History

General Plan of Structure

History

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 8

Approach Span Construction

History

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 9

Bascule Span Installation

History

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 10

• Identify Scope of Rehabilitation Needs

• Review 1993 Repairs

• Work Started in 2007

• Efforts Continued through 2010

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 11

Condition Assessment

Concrete Deck

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 12

Traffic Gate Operator

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 13

Bascule Span Sidewalk

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 14

Bascule Span Deck Grating

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 15

Floor Beams

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 16

Main Cylinder

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 17

Brake Cylinder

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 18

Position Sensor

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 19

Tail Bearing

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 20

Hydraulic Power Unit

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 21

Hydraulic Controls

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 22

Hydraulic Control Tubing

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 23

Submarine Cables

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 24

• Concrete Deck Overlay

• Riveted Steel Grid Deck and Floor Beams

• Non-skid Steel Plate Sidewalks

• Submarine Cables

• Hydraulic Cylinders, Power Units, and Controls

• Scour Countermeasures

• Shimming and Balancing

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 25

Condition Assessment

• Local Bridge Program Application Submitted in 2009, 2010, and 2011

• Regional Bridge Council Commitment

• Movable Bridges considered Major Structures

• Selected for Funding in 2014 FY

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 26

Funding

• Total Construction Cost - $2,498,500

• Local Bridge Program - $1,573,200

• Small Urban Program - $375,000

• Local Funding - $550,300

• Engineering Fees - $607,500

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 27

Funding

• Great Lakes Engineering Group, LLC – Underwater Inspection/Scour Mitigation

• Hardesty & Hanover – Structural, Mechanical & Electrical Engineering

• City Staff – Traffic Control Plan

• Spicer Group – Construction Observation & Administration

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 28

Design Phase

Open Steel Grid Decking

Design Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 29

Non-skid Steel Plate Sidewalks

Design Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 30

Hydraulic Schematic

Design Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 31

Electric Schematic

Design Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 32

• 2014-15 Winter Construction

• Construction started October 13, 2014

• Completion date of April 30, 2015

• Long Lead Time Items: Hydraulic Cylinders and Open Steel Grid Decking

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 33

Construction Phase

Deck Removals

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 34

New Floor Beams

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 35

Steel Curb Beam

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 36

Open Steel Deck Grid

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 37

Open Steel Grid Deck

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 38

Non-skid Steel Plate Sidewalks

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 39

Submarine Cable

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 40

Submarine Cable

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 41

Hydraulic Power Unit

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 42

Hydraulic Control Valves

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 43

Programmable Logic Controller

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 44

Main Hydraulic Cylinder

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 45

Tail Lock Cylinder

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 46

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 47

Video of Opening

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 48

• MDOT Staff

• RBC and LBAB Volunteers

• Consultants

• Contractor (Anlaan Corporation)

• Citizens of South Haven