East Link ExtensionJudkins Park Station

Open House

October 2016

Tonight’s agenda• 5-7 p.m. – Open house

– Meet the team– View design plans– Tell us what you think

• 5:30 – Presentation – Welcome and introductions (Zack Ambrose) – East Link overview (Tia Raamot)– Station design update (David Hewitt & Tanja Wilcox)– STart (Kurt Kiefer) – Upcoming construction (Zack Ambrose)– Question and answer

• 6:00 – Return to open house • 7:00 - Close

2

Link light rail system

• 19 miles of light rail with 16 stations currently in service

• University Link and Angle Lake opened in 2016

• ST2 Plan funded extensions to Overlake, South King County, and Lynnwood

• 50+ mile system

3

East Link overviewLength: 14 miles

Ride times: • International District / Chinatown: 5

min• University of Washington = 15 min

• Bellevue Transit Center: 15 min

• SeaTac Airport = 40 min (with

transfer at International District)

Rider projection: 50,000 daily riders

by 2030

Budget: $3.7 billion (YOE $)

Start of Service: Targeted 2023 4

East Link timeline & recent progress

30% design 60% design Completion of

Final Design

Downtown Bellevue Tunnel

I-90: Construction• Sound Transit is working

with WSDOT to provide full-time HOV lanes in the outer roadways, in preparation for light rail in the center roadway

• The center roadway closes and East Link construction begins June 2017

• Station construction begins mid-2018 6

What we’ve heardKey Themes:• Station design

• Bike and pedestrian access

• Safety and security

Public Involvement:• 30% & 60% design open houses• Project briefings• Umojafest• Feet First Walk• Lighthouse for the Blind• Find it, Fix It with City of Seattle

Supporting structures

8

Judkins Park Station

Contextual Plan

10

Aerial Perspective

11

NAAM

RAINIER AVENUE (WEST)ENTRANCES

WEST ENTRY TICKETING AND WALKWAY

STATION PLATFORM

23RD AVENUE (EAST)ENTRANCE

Site Plan

12

Longitudinal Site Section

13

West Pedestrian Bridge Access – West of Rainier

14

Artwork at Rainier Ave S

15

West Entry – Contextual Site Plan

16

West Entry – Lower Plaza

17

West Entry – Cross Sections

18

West Pedestrian Bridge Access – West of Rainier

19

West Entry – Contextual Landscape Plan

20

Artwork at Rainier Ave S

21

Aerial Perspective

22

WEST ENTRY TICKETING AND WALKWAY

STATION PLATFORM

West Entry - Upper Plaza Level

23

Pedestrian Bridge Access – Looking West

24

West Entry – Looking at Pedestrian Bridge

25

West Entry – North Elevations

26

Ticketing Area and Walkway – Looking East

27

West Entry – Looking at Pedestrian Bridge

28

Platform - Plan

29

Platform Canopy Looking West

30

Platform – Landscape Plan

31

Artwork at Platform

32

Artwork at Platform

33

Aerial Perspective

34

23RD AVENUE (EAST)ENTRANCE

East Entry – Upper Plaza Plan

35

East Entry – Landscape Plan

36

East Entry – Upper Plaza at Ticketing Area

37

Artwork at 23rd Avenue South

38

What’s next?

Upcoming Construction• Meet the Contractor Open House

Spring 2017 • Construction: June 1, 2017

– I-90 Two-way Transit– I-90 HOV lane closures

• Mid-2018: Judkins Park Station construction

40

Stay in touch• Contact Community Outreach staff:

zack.ambrose@soundtransit.org or 206-903-7176

• 24 hour construction hotline: 888-298-2395• Sign-up to receive email updates:

www.soundtransit.org/subscribe