EECE 396-1Hybrid and Embedded Systems: Computation
T. John Koo, Ph.D.
Institute for Software Integrated Systems
Department of Electrical Engineering and Computer Science
Vanderbilt University
300 Featheringill HallJanuary 29, 2004
john.koo@vanderbilt.edu
http://www.vuse.vanderbilt.edu/~kootj
2
Hybrid System
A system built from atomic discrete components and continuous components by parallel and serial composition, arbitrarily nested.
The behaviors and interactions of components are governed by models of computation (MOCs).
Discrete Components Finite State Machine (FSM) Discrete Event (DE) Synchronous Data Flow (SDF)
Continuous Components Ordinary Differential Equation (ODE) Partial Differential Equation (PDE)
q1q2
q3
u
xç= f (x) + g(x)u
x
3
Modeling: Timed Automata
4
Topics Finite Automata
Transition Relation = Edges + Guard Ordering of events
Timed Automata Notions of time: Global/Local Clocks Transition Relation Total ordering of events Multi-rate time automata
Example Rate Monotonic Scheduling Train Gate model
Ref: [1] R. Alur, T.A. Henzinger, and P.-H. Ho.
Automatic Symbolic Verification of Embedded Systems. IEEE Transactions on Software Engineering 22:181-201, 1996.
[2] T.A. Henzinger, P.-H. Ho, and H. Wong-Toi. HyTech: A Model Checker for Hybrid Systems. Software Tools for Technology Transfer 1:110-122, 1997.
5
(Non-)Deterministic Finite Automata
6
(Non-)Deterministic Finite Automata
7
(Non-)Deterministic Finite Automata
8
(Non-)Deterministic Finite Automata
9
Ordering of events
10
Ordering of events
11
Ordering of events
12
Timed Automata
13
Timed Automata
14
Timed Automata
15
Timed Automata
16
Timed Automata
17
Timed Automata
GPS
INS
18
Timed Automata
19
Timed Automata
20
Train Gate model The gate controller of a railroad crossing has a delay of
a seconds; that is, the gate starts closing a seconds after a train signals its approach. HyTech computes the safe values of a such that the gate is fully closed whenever the train is within 10 meters of the gate.
Reference and On-Line Demo: www-cad.eecs.berkeley.edu/~tah/HyTech/demo.html
21
Train Gate model
22
End