engin object presentation 2000
Post on 13-Apr-2017
192 Views
Preview:
TRANSCRIPT
05/03/2305/03/23 Group ServicesGroup Services 11
enginObjectenginObject Presentation 2000 Presentation 2000
By
Mal Moran
05/03/2305/03/23 Group ServicesGroup Services 22
AgendaAgenda
Why enginObject?Why enginObject? Superbase Superbase Implementation StepsImplementation Steps Problems EncounteredProblems Encountered Benefits So FarBenefits So Far Targets Targets
05/03/2305/03/23 Group ServicesGroup Services 33
enginObject OverviewenginObject Overview
Why enginObject ?Why enginObject ?
05/03/2305/03/23 Group ServicesGroup Services 44
Why enginObject ?Why enginObject ?1. 1. A standard object oriented programming toolA standard object oriented programming tool to build in Recticel knowledge.to build in Recticel knowledge.
- An easy programming system for non programmers.- An easy programming system for non programmers.
Screens.Screens.Procedures.Procedures.Variables.Variables.Formulas.Formulas.
05/03/2305/03/23 Group ServicesGroup Services 55
Why enginObject ?Why enginObject ?
2. Exchange facility with other Systems.2. Exchange facility with other Systems.
- ODBC (AS400, Unix Systems)- ODBC (AS400, Unix Systems)
- SQL (AS400, Unix Systems)- SQL (AS400, Unix Systems)
- DDE (Windows programs i.e. Superbase)- DDE (Windows programs i.e. Superbase)
05/03/2305/03/23 Group ServicesGroup Services 66
- - 1000:1000: Non Template Parts.Non Template Parts. - 1001:- 1001: Template cut Parts.Template cut Parts.
- 2000:- 2000: Single CNC Parts.Single CNC Parts. - 5000:- 5000: Aux. Material Parts.Aux. Material Parts.
- 5500:- 5500: Blown Fibre Parts. Blown Fibre Parts. - 5- 56600:00: CardedCarded Fibre Parts. Fibre Parts.
- 6000:- 6000: Fabricated Parts.Fabricated Parts. - 8000:- 8000: Mulitlog PMulitlog Programsrograms..
3 . 3 . Program controlled Product coding.Program controlled Product coding.
Why enginObject ?Why enginObject ?
05/03/2305/03/23 Group ServicesGroup Services 77
Why enginObject ?Why enginObject ?4. Program controlled BOM and BOR content 4. Program controlled BOM and BOR content generation.generation.
- Bill of Material (BOM) - Bill of Material (BOM) 3 levels (Suite, Set, Part Component) 3 levels (Suite, Set, Part Component)
- Bill of Routing (BOR)- Bill of Routing (BOR) Content of BOR is generated automatically, based on Content of BOR is generated automatically, based on selections made for every order release. selections made for every order release.
05/03/2305/03/23 Group ServicesGroup Services 88
Why enginObject ?Why enginObject ?
5. Multi5. Multi--Lingual EnvironmentLingual Environment
- The common logic has to be available for - The common logic has to be available for different languages. different languages.
- Available Today: English & German.- Available Today: English & German. In translation: DutchIn translation: Dutch & French & French
05/03/2305/03/23 Group ServicesGroup Services 99
Why enginObject ?Why enginObject ?
6. European Time Tables.6. European Time Tables.
- Def. of global Parameters for all operations. - Def. of global Parameters for all operations.
- Link of approved Parameters to EO.- Link of approved Parameters to EO.
- Update of Timetables. - Update of Timetables.
05/03/2305/03/23 Group ServicesGroup Services 1010
Superbase OverviewSuperbase Overview
Features.Features. Order transfer from host system.Order transfer from host system. Drawing Database automatically adds Drawing Database automatically adds
drawings to process papers.drawings to process papers. Order Entry automaticallyOrder Entry automatically adds order linesadds order lines/ /
order comments order comments to process to process papers.papers. System setup screens.System setup screens. Reports.Reports. Inventory ManagementInventory Management.. Provides a powerful query tool.Provides a powerful query tool.
05/03/2305/03/23 Group ServicesGroup Services 1111
Implementation StepsImplementation Steps
Step1: Setup a LANStep1: Setup a LAN
05/03/2305/03/23 Group ServicesGroup Services 1212
Batch Run PC400 MHZ
Windows NT4.0
FileServer
Ethernet
Lazor Jet Printer24 Pages Per Min
With Duplex
Cisco Router
MirroredHard Drive
ISDN 64K
LAN SetupLAN Setup
05/03/2305/03/23 Group ServicesGroup Services 1313
Gantt Chart - Re:Implementation of a LAN and enginObject
Implementation Steps Week1 > 4 Week 5 Week 6 Week 7
Set up the LAN ( Structured Cabling & Network Server )
( Preparation )
Install Additional Hardware & Software ( Batch PC, Printer & Router + EO&SB )
EO & SB Training Ongoing
Commence Data Entry Ongoing
Implementation Steps Gantt ChartImplementation Steps Gantt Chart
05/03/2305/03/23 Group ServicesGroup Services 1414
Implementation StepsImplementation Steps
Step2: PreparationStep2: Preparation
05/03/2305/03/23 Group ServicesGroup Services 1515
Collect Site InformationCollect Site Information
- - Departments.Departments.
- - Machines.Machines.
- - Item Master Data.Item Master Data.
PreparationPreparation
05/03/2305/03/23 Group ServicesGroup Services 1616
ExampleExample Machine Setup 1 of 2Machine Setup 1 of 2
05/03/2305/03/23 Group ServicesGroup Services 1717
ExampleExample Machine Setup 2 of 2Machine Setup 2 of 2
05/03/2305/03/23 Group ServicesGroup Services 1818
Define Site RulesDefine Site Rules Select a Customer.Select a Customer.
Midlands = EliteMidlands = Elite Gwalia = AshwoodGwalia = Ashwood
PreparationPreparation
05/03/2305/03/23 Group ServicesGroup Services 1919
ResourcesResources TrainingTraining
PreparationPreparation
05/03/2305/03/23 Group ServicesGroup Services 2020
Step3: Training & Data EntryStep3: Training & Data Entry Additional Training for Supervisors & Shop Additional Training for Supervisors & Shop
Floor OperativesFloor Operatives
Implementation StepsImplementation Steps
05/03/2305/03/23 Group ServicesGroup Services 2121
Shop Floor Acceptance.Shop Floor Acceptance. Programming.Programming. New Features.New Features.
Problems EncounteredProblems Encountered(( Midlands Midlands))
05/03/2305/03/23 Group ServicesGroup Services 2222
Shop Floor AcceptanceShop Floor Acceptance
Process Notes & Procedures.Process Notes & Procedures. Support.Support. Communication.Communication. Participation.Participation.
05/03/2305/03/23 Group ServicesGroup Services 2323
ProgrammingProgramming
enginObject.enginObject.Multilog.Multilog.
Fibre Fillings.Fibre Fillings. Help FilesHelp Files
Visual Help Pro.Visual Help Pro. Superbase.Superbase.
Reports.Reports.New Databases & Procedures.New Databases & Procedures.
05/03/2305/03/23 Group ServicesGroup Services 2424
New Features.New Features. Fibre Fillings.Fibre Fillings. CNC Fibre Pad Cutting.CNC Fibre Pad Cutting. Trimming Allowances.Trimming Allowances. Bar Coding.Bar Coding.
SAP.SAP. Production / Order Monitoring.Production / Order Monitoring. Performance Monitoring.Performance Monitoring. Closing the loop / signing off.Closing the loop / signing off.
Quick Costing System.Quick Costing System. Capacity Planning.Capacity Planning.
05/03/2305/03/23 Group ServicesGroup Services 2525
MidlandsMidlands 95% Customers Loaded95% Customers Loaded
GwaliaGwalia 1 Customer Loaded ( Represents 20% ) 1 Customer Loaded ( Represents 20% ) 80% by June 200180% by June 2001
Current Status ( UK )Current Status ( UK )
top related