evolution of antipumping relay

Post on 09-Jan-2016

114 Views

Category:

Documents

7 Downloads

Preview:

Click to see full reader

DESCRIPTION

Evolution of Antipumping relay. SF, LF, Evolis 24kV, EvolisHP. Anti pumping Relay. Description: The anti-pumping relay is built into the mechanism of circuit breakers to ensure that the opening order has priority. - PowerPoint PPT Presentation

TRANSCRIPT

Evolution of Antipumping relay

SF, LF, Evolis 24kV, EvolisHP

Schneider Electric 2- Division - Name – Date

Anti pumping Relay

Description:The anti-pumping relay is built into the mechanism of circuit breakers to ensure that the opening order has priority.

This function prohibits re-closing of CB in case of fault tripping. In other words it prevents the possibility of maintaining a permanent closing order inorder to avoid « pumping » of the CB

Antipumping relay:

Schneider Electric 3- Division - Name – Date

What’s new?

● Replacement of Electromechanical antipumping relay by Electronic version due to obsolete component.

● Capable of handling multi-voltages, from 24V to 380V

● Input: DC/AC, Output: DC only. Associated closing release coil YF to have DC ratings only

● New Electrical diagram: Change in assembling closing coil with relay

Please see attached file for the updated diagrams.

Schneider Electric 4- Division - Name – Date

Ex. of updated Electrical Diagram

Schneider Electric 5- Division - Name – Date

Change in the offer structure

●Configured full product: ● No impact in Elonet configuration.● Additional bridge options of internal electrical connection is not possible

anymore. Only standard bridge remains unchanged.● Additional leaflet with new electrical diagram is attached with user manual

systematically

●Spare part:● Ref MV261200 will be replacing old references for RI mechanism in SF, LF,

Evolis 24 and Evolis HP ranges● Ref MV261202 will be replacing old references for GmH mechanism in SF

MCset4, SF F400 and SF2 fixed versions.● It is recommended to replace the closing coil and relay at the same time.

●Level C adaptation: Separate Mail

Schneider Electric 6- Division - Name – Date

Implementation Planning

Configured full product:

Week 23 Week 30

LF

Evolis 24

Evolis HP

SF

top related