excavator x63 installation
Post on 03-Jan-2016
26 Views
Preview:
DESCRIPTION
TRANSCRIPT
Excavator X63 Installation Sept 2009
Excavator X63 Installation
Excavator X63 Installation Sept 2009
Reference Materials
7010-0696
Reference Materials
7010-0697
Excavator X63 Installation Sept 2009
Theory of Operation
Main Antenna Left (GPS Position)Implement lengthsAngles between implement
Aux Antenna Right (Heading)
Excavator X63 Installation Sept 2009
Theory of Operation
TS-1 sensors measure implement angle
Excavator X63 Installation Sept 2009
Theory of Operation
Excavator X63 Installation Sept 2009
GX60
Component Overview
Excavator X63 Installation Sept 2009
FeaturesOperating Sys
Windows XPTouch Screen Display
640X840USB Port
Data TransferRam or Jaw Mounting
GX60
Excavator X63 Installation Sept 2009
MC 2.5 Current
MC-R3/2.5
MC-R3 (Soon to be released)
Configured for Dual GPS
Excavator X63 Installation Sept 2009
AUX Antenna(Heading)
Main Antenna(Position)
MC-A1
Excavator X63 Installation Sept 2009
3-Axis 3600 sensor
Mounting any orientation
Parallel to axis being measured
TS-1 Overview
Excavator X63 Installation Sept 2009
Body Boom
*Split Boom/Add a Stick
Stick Bucket
*Tilt Bucket
*Optional sensors
TS-1 Options
Excavator X63 Installation Sept 2009
Excavator X63 Installation
Excavator X63 Installation Sept 2009
TS-1 Sensor Arrow Orientation
Orientation (Arrow on sensor)
Parallel to axis being measured
Excavator X63 Installation Sept 2009
Cabling Restrictions
Bending Radius 3”/8cm
Start at the Bucket Sensor to prevent excess cable
Excavator X63 Installation Sept 2009
Bucket Sensor Installation
Bucket 0o
Sensor parallel with stick-to-bucket centerline
+/- 20o of pivot centerline
Excavator X63 Installation Sept 2009
Dog Bone Installation
Additional Protection
Additional Calibration steps
Excavator X63 Installation Sept 2009
Tile Bucket Mounting (Optional)
Tilt Bucket Sensor Installation
Excavator X63 Installation Sept 2009
Bucket Sensor Cover
Sensor Covers & cable protection
Excavator X63 Installation Sept 2009
Stick Sensor Installation
Parallel to the stick-to-bucket centerline.
+/- 20o of the pivot centerline.
Excavator X63 Installation Sept 2009
Boom Sensor Installation
Parallel to the Boom centerline.
+/- 20o of the pivot centerline.
Excavator X63 Installation Sept 2009
Body Sensor Installation
Parallel to the Boom pivot
+/- 20o of Track Centerline
Excavator X63 Installation Sept 2009
Antenna Installation
Excavator X63 Installation Sept 2009
Excavator X63 Installation
top related