excavator x63 installation

Post on 03-Jan-2016

26 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Excavator X63 Installation. Reference Materials. Reference Materials. 7010-0696. 7010-0697. Theory of Operation. Main Antenna Left (GPS Position) Implement lengths Angles between implement Aux Antenna Right (Heading). Theory of Operation. TS-1 sensors measure implement angle. - PowerPoint PPT Presentation

TRANSCRIPT

Excavator X63 Installation Sept 2009

Excavator X63 Installation

Excavator X63 Installation Sept 2009

Reference Materials

7010-0696

Reference Materials

7010-0697

Excavator X63 Installation Sept 2009

Theory of Operation

Main Antenna Left (GPS Position)Implement lengthsAngles between implement

Aux Antenna Right (Heading)

Excavator X63 Installation Sept 2009

Theory of Operation

TS-1 sensors measure implement angle

Excavator X63 Installation Sept 2009

Theory of Operation

Excavator X63 Installation Sept 2009

GX60

Component Overview

Excavator X63 Installation Sept 2009

FeaturesOperating Sys

Windows XPTouch Screen Display

640X840USB Port

Data TransferRam or Jaw Mounting

GX60

Excavator X63 Installation Sept 2009

MC 2.5 Current

MC-R3/2.5

MC-R3 (Soon to be released)

Configured for Dual GPS

Excavator X63 Installation Sept 2009

AUX Antenna(Heading)

Main Antenna(Position)

MC-A1

Excavator X63 Installation Sept 2009

3-Axis 3600 sensor

Mounting any orientation

Parallel to axis being measured

TS-1 Overview

Excavator X63 Installation Sept 2009

Body Boom

*Split Boom/Add a Stick

Stick Bucket

*Tilt Bucket

*Optional sensors

TS-1 Options

Excavator X63 Installation Sept 2009

Excavator X63 Installation

Excavator X63 Installation Sept 2009

TS-1 Sensor Arrow Orientation

Orientation (Arrow on sensor)

Parallel to axis being measured

Excavator X63 Installation Sept 2009

Cabling Restrictions

Bending Radius 3”/8cm

Start at the Bucket Sensor to prevent excess cable

Excavator X63 Installation Sept 2009

Bucket Sensor Installation

Bucket 0o

Sensor parallel with stick-to-bucket centerline

+/- 20o of pivot centerline

Excavator X63 Installation Sept 2009

Dog Bone Installation

Additional Protection

Additional Calibration steps

Excavator X63 Installation Sept 2009

Tile Bucket Mounting (Optional)

Tilt Bucket Sensor Installation

Excavator X63 Installation Sept 2009

Bucket Sensor Cover

Sensor Covers & cable protection

Excavator X63 Installation Sept 2009

Stick Sensor Installation

Parallel to the stick-to-bucket centerline.

+/- 20o of the pivot centerline.

Excavator X63 Installation Sept 2009

Boom Sensor Installation

Parallel to the Boom centerline.

+/- 20o of the pivot centerline.

Excavator X63 Installation Sept 2009

Body Sensor Installation

Parallel to the Boom pivot

+/- 20o of Track Centerline

Excavator X63 Installation Sept 2009

Antenna Installation

Excavator X63 Installation Sept 2009

Excavator X63 Installation

top related