TRANSCRIPT
EXISTING ROAD
EX
IS
TIN
G R
OA
D
+230000m
EXISTING ROAD
EX
IS
TIN
G R
OA
D
Scale(s) :
Drawing Creation Date :
-
Document ID
-
Lafarge Holcim Asset Code (ACS)
-
Consecutive Rev.
APPROVEDESIGN CHECK
TITLE :
Elevations and Plan of SRF Conveyor
PHT Floor 3 Option
G A 1 1 V 0 0 0 0 0 0 0 0 1 7
26/01/2021
1/400
JC
All information contained in this document is strictly confidential and is the exclusive property of the EGIS Group
TRANSMITTER :
Project Code
C
LH CAULDON PLANT
L D 0 1 - J C E G
Contractor Name
OWNER :
PROJECT NAME :
SRF Platform
Rev. DATE Designation Changes CHEKDESIGN
John Carr Engineering Services LTD
A
Existing Lafarge
Cement Plant
Existing Lafarge
Cement Plant
For details of SRF storage building see drawings
CLD01-JCEG-GA11-V000000-0009 RevA and
CLD01-JCEG-GA11-V000000-0011
Sides of conveyor gantry above public
road fully clad with steel sheeting - colour
to be Juniper Green (RAL 160 20 10)
Top of conveyor section of gantry fully
clad with steel sheeting - colour to be
Juniper Green (RAL 160 20 10)
Conveyor gantry walkway floor to
be solid plate in area over road
Conveyor gantry walkway floor to
be open mesh in area not over
public road
Conveyor gantry steelwork to
be galvanised steel finish
WE
S
N
Site Boundary
Plan on SRF Conveyor
North Elevation
South Elevation