Factory Building Symposium on Lean

Production

January 29, 2007Austin, Texas

Four Seasons Housing, Inc.Middlebury, IN

Austin Baidas, CEO and President

Level the Load

Four Seasons Housing Started: 1994 Location: Middlebury, IN Home type(s): Primarily HUD

Code Price point: Moderate Design: Limited

customization Production: 10 floors/day Market area: Northern US

Objective: Balance the Line Eliminate non-value

added (NVA) activity Reduce cycle time

variability› Station to station› Floor to floor

Strategy1. Map product flow2. Analyze data to

identify causes of cycle time variability

3. Implement solutions that reduce NVA and control cycle time variability

Sources of Variation Double vs. single floor

stations Variation in

complexity from A to B half

Tactic: Convert single Tactic: Convert single floor stations to double floor stations to double

floor stationsfloor stations

Then

Raw Material

Raw Material

Raw Material

Roof Ass’y

Raw Material

Mud Pit

Raw Material

Side Wall Jig

Side Wall Jig

End Wall

Plumb & Tile

Mud Pit

Raw Material

5 Interior Walls

1A Frame

1B Post-Frame

2B Pre-Floor

2A HVAC, H2O, DWV

2C Decking 3 Plumb, Util., Floor 4 Cabinet Set

6 End, Side, Drywall & Electrical

7 Side, Drywall, Elec.

8 Marriage, Drywall & Electrical

9 Roof Set, Drywall

& Electrical

10 Rough Roof,

Exterior & Interior

11 Shingle, Siding

& Interior

12 Sofit & Fascia

13 Mud, Dry, Prep

13 Mud, Dry, Prep

13 Mud, Dry, Prep

13 Mud, Dry, Prep

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Heater

Cabinet Shop

Interior Walls

Cab

inet

Top

s Upper Cabinet

Cabinet Shop

Plu

mb

& T

ile

HVAC Mezzanine

NowInterior Walls

Cab

inet

Top

s Upper Cabinet

Raw Material

Raw Material

Roof Ass’y

Raw Material

Mud Pit

Side Wall Jig

Side Wall Jig

End Wall

Mud Pit

HVAC Mezzanine

Cabinet Shop

Plu

mb

& T

ile

HVAC Mezzanine

2B Decking

3 Plumb, Util., Tile 5 Interior Walls

6 End, Side, Drywall & Electrical

7 Side, Drywall, Elec.

8 Marriage, Drywall & Electrical

9 Roof Set, Drywall

& Electrical

10 Rough Roof,

Exterior & Interior

11 Shingle, Siding

& Interior

12 Sofit & Fascia

Paint, Dry, Finish

13 Mud, Dry, Prep

Paint, Dry, Finish

Paint, Dry, Finish

13 Mud, Dry, Prep Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

2A Floor Box

Heater

Raw Material

4 Cab. & Utility Set

Buffer

2A Electrical

13 Mud, Dry, Prep

13 Mud, Dry, Prep

Future

Raw Material

HVAC MezzanineRaw Material

Roof Ass’y

Mud Pit

Raw Material

Side Wall Jig

Side Wall Jig

End Wall

3 DeckingHeater

8 Marriage, Drywall & Electrical

9 Roof Set, Drywall

& Electrical

11 Shingle, Siding

& Interior

12 Sofit & Fascia

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

13 Mud, Dry, Prep Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish13 Mud, Dry, Prep

13 Mud, Dry, Prep

13 Mud, Dry, Prep

2 Floor Box

4 Plumb

Interior Walls

Cab

inet

Top

s

Upper Cabinet

Lower Cabinet Util

ity

Pre

p.

Plu

mb

6 Interior Wall Set 7 End, Side & Mate Wall

5 Cabinet Set, Tile

& Utility Set

10 Rough Roof,

Exterior & Interior

Results

Reduced through-put time 27% All production within facility Eliminated NVA protection for outside floors Eliminated NVA moves Identified real-time data collection

requirements Started a kaizen project list

Highlights Lean initiative driven by business objective Established lean process Identified root cause Listened to the data Workers contributed mightily

Lessons Lean cannot be forced by one person Involve employees Allow team to own the decisions Lean is a process

Going Forward Refine our lean

process Conduct kaizen

events to improve efficiency in departments

Revise plant layout to convert to double floor stations

Lean Symposium

Manufactured Housing Research AllianceJordan Dentz

(212) 496-0900 x13jdentz@research-alliance.org

www.mhrahome.org

Factory Building Symposium on Lean