fame su ct03 working paper cmes 2021-2027
Post on 16-Oct-2021
2 Views
Preview:
TRANSCRIPT
FAME SU
CT03
Working paper CMES
2021-2027
FAME Support UnitMonitoring and Evaluation under the EMFF
26th meeting of the Expert Group on the EMFF
18 November 2020, Online
Maritime Affairs and Fisheries
CMES – Common Monitoring and Evaluation System 2021-2027
• Intervention logic
• Set of common indicators
• Infosys reporting
• CPR Article 37 reporting
• Evaluation Plan and activities
• Annual review/report
Intervention logic
Specific
objectivesPriorities
Types of
interventions
€
Result
indicator
Output
indicator
EU objectives:
CPR, CFP, other policies
Types of
actions
Types of
operationsExpenditures Result indicators
Information on
beneficiary
Policy level
Programme
level
Operational
level
Policy
objective
SWOT
Needs
• Establish a coherent link between CMES elements
• Establish a functional data collection and monitoring
system
Programme preparation
Types of
interventions
Result indicator
(target value)
Types of
action
Specific
objectives
Infosys
Output
indicator
(target value)
SWOT
Needs
Programme implementationInfosys 2021-2027 (provisional)
Annex IIAnnex I
Name and
descriptionSOID
Types of
beneficiaries
NUTS
Partners
Baseline
value
Ex-post
results
Result
Indicator
Indicative
results
Sea/inlandState of
progress
Types of
operation
Horizontal
principles,
SSCF, LO
Costs/
expenditure
Form of
support
Beneficiary Gender Employees
Type of
intervention
34 fields currently. 4 fields
Type of interventions
• currently there are 16 types of interventions under discussion
• used to allocate funds along thematic policy issues;
• used to track climate change and environmental expenditure;
• should be selected select under each specific objective in
accordance with the defined types of actions, and indicatively
allocate so that funds are indicatively allocated to each of them;
• MAs freely choose as many types of interventions per SO as
necessary;
• during implementation a type of intervention should be chosen for
each operation CPR Article 37.
Types of operations
• pre-determined list of thematic categories used to label/categorize
single operations for monitoring in Infosys;
• final list will be determined in a future legal supporting act
following the final regulation;
• during implementation, Member States select the most
appropriate type of operation for each operation;
• only one type of operation is possible per operation;
• for complex operations, MA must choose the most
representative one.
Submission
of Infosys
FAME infosys
validation
report
FAME error
report
CPR Art. 37
reportSFC
Decision of MS to
correct the Infosys
If correction
Infosys
Reporting process
Reporting timeline - preliminary
Infosys
CPR Art .37
reporting
Indicator
values
CPR Art. 37
Financial
reporting
31.1.20XX 30.4.20XX 31.7.20XX 31.11.20XX
Infosys
CPR Art. 37
reporting
Indicator
values
CPR Art .37
Financial
reporting
CPR Art. 37
Financial
reporting
CPR Art. 37
Financial
reporting
30.09.20XX
CPR Art. 37
Financial
reporting
FAME working paper contains
• Intervention logic
• Indicators
• Infosys reporting
• Annual performance review
• CPR 37 reporting
• Evaluation activities
• Annex
– Types of interventions
– Common result indicators
– Infosys
– Types of operations
FAME offers support through:
• Capacity building for MAs and IBs
• FAME Validation tool, manual and working paper for
download
• Ad-hoc support during the reporting phase (hotline)
• FAME Infosys error report (formal errors, plausibility and
double counting)
• FAME aggregation tool table for MSs to aggregate Infosys
reports for Article 37 CPR
12
Thank you for your attention!
FAME@fame-emff.eu
top related