Florida Department of Transportation

FDOT District Four Major Projects

Florida Department of

TRANSPORTATION

Robert Bostian, PEDistrict Consultant Project Management Engineer

Florida Department of Transportation

FDOT District Four Major Projects

• US-1 Bascule Bridge Replacement, Jupiter Inlet Palm Beach County – Bid Opening March 2021 – FM# 428400-2

• SR-710 Beeline Hwy Reconstruction/Widening Palm Beach County – Bid Opening July 2021 - FM# 419251-1

• SR A1A North Causeway Bridge Replacement St. Lucie County – Bid Opening Sept 2021 - FM# 429936-2

• SW 10th Street & I-95 Direct Connector Broward County – Bid Opening July 2022 – FM# 439891-1 & FM# 436964-2

Florida Department of Transportation

Project Locations

SR 710 (Northlake Blvd to Blue Heron Blvd)

SW 10th Street Connector

Jupiter US 1 Bridge (CR A1A to Beach Rd)

Not to ScaleSR A1A North Causeway Bridge

Project milestones reflected in the presentation are subject to change; they are based on current project schedules and funding.

Florida Department of Transportation

SR 5/US-1 Federal Highway Bridge

• Bridge Length – 915 ft

• Roadway Reconstruction – 2,470 ft

• Full closure with detour

• Intersection improvements and ITS along detour route

• Innovations included Pre-detour work

Hybrid-phased construction – Commission half of new bridge during detour

Precast elements for bascule pier footing

Preassembly of bascule leaves

Simplified machinery and electrical installation

Location Map

Florida Department of Transportation

INTERSECTION IMPROVEMENT 1US 1 at Beach Rd/Alt A1A at Old Dixie Hwy

INTERSECTION IMPROVEMENT 3US 1 at SR 706

INTERSECTION IMPROVEMENT 2ALT A1A at SR 706

Intersection improvements along detour route

Mitigate community impacts during detour

New ITS features along detour route

SR 5/US-1 Federal Highway Bridge

Florida Department of Transportation

90’ between fenders

125’ between fenders

38’ @ fender

25’ @ Center21’ @ fender

42’ @ Center

7

40% reduction in bridge openings

SR 5/US-1 Federal Highway Bridge

Florida Department of Transportation

SR 5/US-1 Federal Highway BridgeProposed Typical Sections

Florida Department of Transportation

Twin Double Leaf Bascule SpanSR 5/US-1 Federal Highway Bridge

Florida Department of Transportation

Twin Double Leaf Bascule SpanSR 5/US-1 Federal Highway Bridge

Florida Department of Transportation

SR 5/US-1 Federal Highway Bridge

Project Status/Schedule

Initial Plans (30%)January 2018

Constructability Review(60%)November 2019

Biddability Preparation(90%)May 2020

Plans CompleteNovember 2020

Bid OpeningMarch 2021

Construction Phase beginsJuly 2021

• Design-Bid-Build Project• Current Estimate $133 Million• FDOT PM Bing Wang• Project Website: https://www.fdot.gov/projects/jupiterus1bridge/main

Florida Department of Transportation

Project Location Map

• SR 710 Roadway Reconstruction –3.1 miles

• Northlake Blvd Roadway Reconstruction - 4000 ft.

• Turnpike Bridge Length – 320 ft. 10 Lanes (180 ft. wide) Pre-Stress Concrete

• Lighting, Mast Arm Signalization, Closed Drainage System with Ponds, and Railroad Crossing

SR 710 Beeline Highway Reconstruction / Widening

Florida Department of Transportation

SR 710 / Beeline Highway

Florida Department of Transportation

Partial Continuous Flow Intersection

• The partial continuous flow intersection will direct vehicles turning left from SR 710 / Beeline Highway to Northlake Blvd. away from the main intersection to relieve congestion

• U-turn movements introduced for left turn movements:

o WBL from Northlake Blvd. to SB SR 710

o SBL from SR 710 to EB Northlake Blvd.

• Innovative drainage design

• Reduces RW impacts

Florida Department of Transportation

Partial Continuous Flow Intersection

Florida Department of Transportation

Partial Continuous Flow Intersection N

Florida Department of Transportation

Initial Plans (30%)March 2019

Constructability Review(60%)Feb 2020

Biddability Preparation(90%)Sept 2020

Plans CompleteMarch 2021

Bid OpeningJuly 2021

Construction Phase beginsNov 2021

Project Status/Schedule

SR 710 – Beeline Highway

• Design-Bid-Build Project• Current Estimate $107 Million• FDOT PM Donovan Pessoa

Florida Department of Transportation

SR A1A North Bridge Over ICWW

Location Map

18

Florida Department of Transportation

Channel Vertical Clearance

85ft

• Bridge Length – 4150 ft. o Replacement of structurally and functionally deficient Bridge. o 85 ft. Channel Clearance w/ 300 ft. Observation Deck

SR A1A North Bridge Over ICWW

Florida Department of Transportation

• Roadway Reconstruction • Juanita Ave Extension – 520 ft. – New Construction• Marina Access Rd. – 560 ft. – New Construction • Old Dixie Hwy – 2000 ft. – Reconstruction• Sunny Lane – 500 ft. – New Construction• Pedestrian Ramp for East Coast Greenway – 800 ft. – New Construction

• Lighting, Mast Arm Signalization, Drainage, and Railroad Crossing Gates

SR A1A North Bridge Over ICWW

Florida Department of Transportation

SR A1A North Bridge Over ICWW

Florida Department of Transportation

SR A1A North Bridge Over ICWW

Florida Department of Transportation

Initial Plans (30%)March 2019

Constructability Review(60%)Feb 2020

Biddability Preparation(90%)October 2020

Plans CompleteJune 2021

Bid OpeningSept. 2021

Construction Phase beginsJan 2022

Project Status/Schedule

SR A1A North Bridge

• Design-Bid-Build Project• Current Estimate $76 Million• FDOT PM Donovan Pessoa• Website: www.SRA1ANorthBridge.com

Florida Department of Transportation

SW 10th Street Connector

Regional Importance - 3 Adjacent Studies

Florida Department of Transportation

SW 10th Street History

Florida Department of Transportation

System Linkage Need

• Regional Weekday Daily Trip Flows• Long distance trips

• Broward, west of Turnpike to / from Palm Beach, east of I‐95 – 51,000 daily trips

• Palm Beach, west of Turnpike to / from Broward, east of I‐95 – 23,000 dailytrips

Source:2016 Origin-Destination Data

Streetlight Insight

Florida Department of Transportation

Looking West on SW 10th Street – Full Depressed Option for Connector Road

Connector Road

Century Village

Local Road

• SW 10th Street – 2 Miles (3 Alternative)• New construction of 4 lane divided local roadway• New construction of 4 lane high speed connector road• Ingress/Egress ramps between SW 10th and connector road

Florida Department of Transportation

Looking West on SW 10th Street – Partial Depressed: Depressed Eastbound and Westbound Connector Road

Connector Road

Century Village

Local Road

Florida Department of Transportation

Partial Depressed Alternative – Eastbound Connector Road Depressed

Century Village

Connector Road

Local Road

Florida Department of Transportation

Looking West on SW 10th Street – Partial Depressed: Depressed Westbound Exit Ramp

Connector Road

Century Village

Local Road

Florida Department of Transportation

Looking West on SW 10th Street – Non-Depressed / No Managed Lane Access Alternative

Connector Road

Local Road

Century Village

Florida Department of Transportation

I-95 and SW 10th Street

To local SW 10th StreetTo Connector

Road

To I-95

Military Trail

• Direct Connections to I-95• Connector Road goes over

Military Trail

• Widening to add an Express Lane ineach direction and accommodate direct connections

Florida Department of Transportation

SW 10th Street Connector

• Design-Build Project• Current Estimate $600 Million - $1 Billion• FDOT PM Robert Bostian• Website: www.SW10Street.com

Project Status / Schedule

Florida Department of Transportation

Florida Department of Transportation

Thank You

Questions?