february 2003 using pi-ace & pi-mdb in applications for hydro energy production

Post on 27-Dec-2015

219 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

February 2003

Using PI-ACE & PI-MDB in applications for Hydro Energy Production

Agenda

Brascan PowerPI Deployment JustificationFunctional ArchitectureACE/MDB Applications

Hydrology CalculationsCapacity CalculationsMeter Validation

Lessons LearnedQuestions

Brascan owns, manages and builds businesses which generate sustainable

cash flows

Focus in 3 core business sectors:Real EstatePower GenerationFinancial

Holds investments in the resource sector.

Invests in high quality assets at attractive values.

Brascan Corporation

Brascan’s energy operations are among the lowest cost producers of electric power in North America.Operations include:

37 hydroelectric plants on fourteen river systems in Ontario, Quebec, British Columbia, Maine, New Hampshire and Louisiana, with a capacity of 1,636 megawatts.

A combined cycle co-generation facility with a capacity of 110 megawatts.

Key interconnections and power transmission facilities in central Canada and the U.S. northeast.

Five hydroelectric projects under construction in British Columbia, Ontario and Brazil totalling almost over 150 MW.

Brascan Power is the largest independent generator and distributor of electricity in Ontario and Quebec.Power Production Base

(Installed Capacity by Region)

Brascan Power Corporation

29%

40%

24%7%

21%

UnitedStates

Ontario

58%

Quebec

16%

B.C. 5%

Marketing Unit’s responsibility:• Optimize value of BPC generation portfolio

• Support growth strategy

• Assist affiliates with supply requirements

Powell RiverEnergy

LouisianaPower

Great LakesPower - T & D

MississagiPower

Lièvre River Power

PontiacPower

MainePower

New Hampshire Power

Lake SuperiorPower

Valerie FallsPower

Great Lakes Power -

Generation

The Operating Unit’s responsibility:• Manage operations• Prepare and implement 20-year capital

program• Manage Health & Safety• Manage Environment• Administration of the business

Agenda

Agenda

Brascan Power

PI Deployment JustificationFunctional ArchitectureACE/MDB Applications

Hydrology CalculationsCapacity CalculationsMeter Validation

Lessons LearnedQuestions

Corporate ObjectivesStandardization

• PI already used at Great Lakes and Maine• Standard interfaces and Batch Files

Integration of new acquisitionsData volume!!!Lower TCO

• Shared applications• Support (esp. small plants)• DataWarehouse for Business Processes & BI

PI Project Justification

Operations ObjectivesI3 – Integrate Information Islands• Weather & hydrology• GS operations• Metering/billing• Other production centers

Automated ReportingBad or missing dataEase of use

PI Project Justification

Agenda

Brascan PowerPI Deployment Justification

Functional ArchitectureACE/MDB Applications

Hydrology CalculationsCapacity CalculationsMeter Validation

Lessons LearnedQuestions

Core operationsSimplified data flow

Functional Architecture

Relational DB’s(Oracle, Sybase)

Time Series DB(PI)

Operations Data GS & Hydrology

Energy Meters (ION)

Phyical Contracts & Scheduling

Weather Forcast & River Mgt

Rules

Data Source InterfacesData Source Interfaces

Data Filters, Validation & Real Time Calculations

Data InterfacesData Interfaces

Operations Management &

Automated Reporting

Energy & Hydrology

Reconciliation

Operator Logs, KPI’s,

Dashboard

Production Planning &

Decision Support System

Consolidated DataWarehouse

Agenda

Brascan PowerPI Deployment JustificationFunctional Architecture

ACE/MDB ApplicationsHydrology CalculationsCapacity CalculationsMeter Validation

Lessons LearnedQuestions

))(X ())(X ())( ( 33220 levelcoeflevelcoeflevelXcoefXcoefVolume

Le

HoF

)1(*9

21

4FCE

5.1*** HoBCECDQ

)level(fQSpill

inQ

spillturbinedin QQQVol xTinflow Natural

)Mw Prod(fQturbined

High Falls

top related