fitman phase iii presentation

Post on 09-May-2015

111 Views

Category:

Presentations & Public Speaking

3 Downloads

Preview:

Click to see full reader

DESCRIPTION

FITMAN FI-PPP Phase II Project provided support in Phase III

TRANSCRIPT

FITMAN: Future Internet Technologies for MANufacturing

An introduction to FITMANand what it can provide to you

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

FITMAN Goals

Contributing to the Social-Technological-Economical-Environmental-Political sustainability (STEEP) of

EU Manufacturing Industries.

Provide the FI PPP with industry-led use case trials in Smart, Digital and Virtual Factories of the Future (FoF)

Test and assess the suitability, openness and flexibility of FI-WARE Generic Enablers.

FITMAN impact

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

FITMAN Outputs

One generic and flexible Trials Verification and Validation Framework, encompassing concepts, methods and tools for Manufacturing Trials

One FITMAN Generic Platform for Manufacturing Industries, as a collection of several Generic Enablers

Three FITMAN Specific Platforms as a collection of several Specific Enablers Implementations

Smart Factory Platform

Digital Factory Platform

Virtual Factory Platform

Ten FITMAN Trials Platforms as instantiation of the selected Generic and Specific Enablers for 10 industry-driven multi-sectorial Trials

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

Smart Factory

Facilitate production capacity as a service

Make start-up production activities easier and more efficient

Support advanced human-computer interaction

The Smart Factory domain concerns the shop floor level of manufacturing. It includes automation of machines, use of robots, transfer between workstations, and collection and management of data to develop agile manufacturing and to facilitate customization.

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

Fast, flexible and intelligent integration of information

Real-time links with shopfloor data

Digital Factory

Highly modular event-driven architecture

The Digital Factory domain concerns digitalization of the product along the manufacturing chain, from the design phase to the production of goods, in order to optimize life cycle management.

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

FlexibilityCollaboration Tangible and intangible asset management

Virtual Factory

The Virtual Factory domain concerns manufacturing ecosystems involving multiple companies organized in a network to facilitate value creation.

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

FITMAN Trials: locations and sectors

Trial 1: Automotive manufacturer

Trial 2: Automotive supplier

Trial 3: Aeronautics manufacturer

Trial 4: White goods manufacturer

Trial 5: Textile/clothing industry

Trial 6: Plastic industry

Trial 7: Construction industry

Trial 8: Manufacturing resource management

Trial 9: LED lighting

Trial 10: Furniture industry

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

FITMAN offers information and support to selectedPhase III consortia and the SMEs and web entrepreneurs

that will apply in the Open Call Expansions in the domain of

ICT in Manufacturing.

Support for FI-PPP Phase III participants

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

FITMAN Package Phase III

The package is available atfitman-fi.eu/phase-iii-package

Information to Phase III consortia

• Verification and validation method

• Methodologies for SMEs engagement

• Business and technical indicators

• Best practices• Lessons learned

Information to SMEs & web entrepreneurs

• FITMAN architecture• Specific Enablers for

Manufacturing• Service/application

development support• Innovation support• Business models• Legal issues

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

Services Support

Dedicated email address for queries: fitman-phase-iii-info@txtgroup.com

Questions and answers will be hosted on the FAQ: fitman-fi.eu/phase-iii-package/support/faq

A forum is online at:fitman-fi.eu/phase-iii-package/support/forum

Notification of updates Via social media: twitter.com/FitmanFI and

linkedin.com/groups?gid=4986259 Via email: please request this by contacting us on the email

address above

10

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

For more on FITMAN support to Phase III, contact us on fitman-phase-iii-info@txtgroup.com or visit www.fitman-fi.eu/phase-iii-package

Contact information

@FitmanFI

Future Internet Technologies for MANufacturing industries - FITMAN

Future Internet Technologies For Manufacturing Industries - FITMAN

http://www.slideshare.net/FitmanFI

https://www.youtube.com/channel/UCT_zyTfmi2GAbGRQ5SduHyw

(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu

FITMAN Beneficiaries

Core Consortium (10 partners)

Original Equipment Manufacturers (4 partners)

SME Networks and Associated S/T (14 partners)

top related