FLOOR FRAMING AND FLOORING

PART OF UNIT STANDARD24381

FLOOR JOISTSACCURATE SET OUT IS REQUIRED

CORRECT NAILING AS PER SCHEDULE

JOINING JOISTSLAPPING 300MM MIN

JOINING FLOOR JOISTSBUTT JOIN WITH FLITCH PLATE MIN LENGTH 300MM

JOINING FLOOR JOISTSMECHANICAL FIXING BOLTED BRACKET

TRIMMER JOIST A

CURTAILED JO

IST B

TRIMM

ING JOIST C

FLOOR JOISTS NEARING COMPLETEION

PERFERATED SILVER FOIL INSULATION

IMPORTANT TO KEEP 100MM SAG BETWEEN JOISTS

FLOORING END JOINS ON SOLID JOISTSEDGES T&G WITH GREEN TOUNGE

KEEPING SHEET JOINS TIGHT

FLOORING ALL NAILED CORRECTLY

FLOOR COMPLETE READY FOR NEXT STAGE