EMERGING ZINC/LEAD PRODUCER
QUARTERLY REPORT SEPTEMBER 2007
HIGHLIGHTS
♦ Development
- Construction activities continue while awaiting forestry approval - Pre-feasibility work at Lae Jehe provides encouragement
♦ Exploration
- Lae Jehe drilling 13.9m @ 16.5% Zn, 9.5% Pb - Sinar Pagi drilling 27.5m @ 6.32% Pb, 18 g/t Ag, 0.96% Zn 2.2m @19.5% Pb, 170 g/t Ag, 0.39% Zn - Lae Puncu sampling 24.8% Zn, 11.0% Pb, 79 g/t Ag
www.herald.net.au
www.jaguarminerals.com.au
www.coronagold.com.au
31 October 2007
HERALD RESOURCES LIMITED ABN 15 008 672 071 Level 3, 50 Colin Street, West Perth Western Australia 6005 PO Box 893 West Perth Western Australia 6872
Tel +61 8 9322 2788 Fax +61 8 9481 1669 Email hrl@herald.net.au Web www.herald.net.au
For
per
sona
l use
onl
y
-
2
HERALD RESOURCES DAIRI ZINC/LEAD PROJECT Herald 80% PT Antam 20% OVERVIEW Development activities at the Dairi zinc/lead project continued throughout the quarter. The Dairi Feasibility Study (“DFS”) is based solely on a 1Mtpa development of the high-grade Anjing Hitam deposit (diluted Reserves 6.6MT @ 15% Zn, 9% Pb) for an initial mine life of 7 years, although substantial other Resources also exist within the project area, e.g. Lae Jehe, where ongoing drilling has thus far delineated Resources of 6.5Mt @ 11.3% Zn & 6.1% Pb. FORESTRY APPROVAL PROCESS As previously advised, in order to proceed to full development at the Dairi Project the Company is awaiting forestry approval, which in turn it seems is dependent on a Presidential decree being issued allowing underground mining in forest areas generally. In relation to the Dairi application for forestry approval, a meeting was convened in Jakarta yesterday (30 October) between the Mines Dept, Forestry Dept, Environment Dept, the National Secretariat, the Foreign Investment Board, some of the expert panel who are advising on the draft Presidential decree above, and the Company's representatives. The Company gave a presentation to the meeting in regard to the impact (minimal) of the proposed mining operations on the forest, which was generally well received. However, slightly more detail in relation to certain areas was requested. To this end the Company will immediately undertake to prepare an additional report, basically by extracting the relevant details from the original feasibility study, plus additional environmental data and sampling collected subsequently, for re-presentation within a few weeks. A further meeting followed, at which the Company was not present, to hopefully finalise drafting of the Presidential decree.
For
per
sona
l use
onl
y
-
3
HERALD RESOURCES As the Company has never formally received any reason from the Forestry Dept why its application should not be approved, the Company continues to believe that approval will be forthcoming once the Presidential decree is signed, although the timing of this is obviously beyond the Company’s control. In the meantime the Company has continued with its development activities where possible to minimize the time to production once the approval is hopefully received. DEVELOPMENT ACTIVITIES EPCM Works / Capital costs The terms of the EPCM engineering contract have been negotiated. Formal signing of the contract will occur subject to Forestry permit approval which directly affects milestone completion dates to be written into the contract. Engineering Design In the previous quarter the decision was made to relocate parts of the process plant and infrastructure to a lower location north of the main plant area to reduce the plant footprint and earthworks in the narrower portion of the upper valley. This redesign work has been progressing well with revision to the layouts essentially completed. The relocated tailings facility has been redesigned with the capability to eventually hold more than double the capacity of the original location,, thereby not only accommodating the Anjing Hitam reserves but also future production from deposits such as Lae Jehe.
The port facility designs are nearing completion with the design and construct contractor. A design consultant has been selected to progress the container offloading and concentrate dumping equipment design at the port facility.
For
per
sona
l use
onl
y
-
4
HERALD RESOURCES Procurement and Contracts Transportation and importation of mill components and other major equipment is continuing. Prefabricated accommodation camp mess and wet buildings are on site awaiting installation. The section of access road up to the forest boundary inclusive of the camp area earthworks has been completed. The contract for the final section of access road and the complete process plant and infrastructure has been re-tendered and submissions received. The contractor engaged for the construction of the camp has been engaged. The contract for the construction of the ring road section of the Sidikalang to Parongil regional road has been awarded. Agreements Agreement is in place with the Public Works authority to allow upgrade of the road between Sidikalang and Parongil. Socialisation and negotiations for land acquisition have occurred for the inner ring road section. The lease agreement between the Company and the Port authority for use of the land and waters at Kuala Tanjung is in place. The port site AMDAL (EIS) is now approved, which should facilitate the issue of the full construction permit shortly. The Company has negotiated and signed an agreement with fellow port-user PT Inalum for use of the private access road to the port. Construction The regional road works that are to occur between Sidikalang and Parongil are divided into a new 4km ring road around Sidikalang and 22km of upgrade of existing road. The ring road works have been awarded. The contractor is mobilized and construction is scheduled for commencement shortly. The upgrade works on the 22km of existing road has effectively begun with the Company working on small sections of the road that have deteriorated due to lack of maintenance by the local authority. Finalisation of land acquisition activities has now turned to the 22km section of the road that requires upgrade. Tenders for the upgrade works have been put to the market and are due for submission shortly.
For
per
sona
l use
onl
y
-
5
HERALD RESOURCES Construction work on the access road up to the forestry boundary and the earthworks associated with the accommodation camp is now complete. Construction work on the accommodation camp has commenced. Clearing and contractor site establishment at the Kuala Tanjung port facility is complete. Temporary jetty facilities are being established. Plant Construction Schedule The date for commissioning of the process plant is dependent upon the granting of forestry approval to access the plant site area, and acquisition of the remaining land along the access corridor. Mining Contract and Planning The mining contractor has set up an office and store yard in Medan. The first Jumbo drill Rig has been imported and is in storage. Delivery of the other mining equipment that was due in 2007 will be postponed to 2008 when mining at the portal is expected to start. The detailed mine planning, scheduling, and geotechnical work was completed during the quarter. Detailed standards and safety parameters are in progress.
For
per
sona
l use
onl
y
-
ÃÃ
ÃÃ
Ã
Ã
à Ãà ÃÃÃ
ÃÃ
ÃÃ ÃÃEnggangMo-Fe-Zn
Basecamp
BululagaPb-Zn-Ag
Lae Puncu
Lubuk RayaPb-Zn-Ag
Sinar PagiPb-Ag
SitapitapiZn-Bi-Fe-Mo
Batu Kapur
Lae Lembara
Pb-Zn-Ag
Pondok Gambir
Lae MaromasPb-Zn
Anjing Hitam
Lae JeheBongkaras
Lae Rimoh
BasukiSopokomil Dome
Zn-Pb-AgProspects
Lae IkanPb-Zn-Ag
Lae MelasZn-Pb-Ag Lau Lebah
Zn-Pb-Ag
Dairi CoW
Sarkea SIPP
3 00'No
2 55'No
98 1
5'Eo
2 40'No
2 45'No
2 50'No
SIDIKALANG(REGENCY CAPITAL)
0 5 Kilometers
98 1
0'Eo
98 0
5'Eo
N
DAIRI AND SARKEA PROJECTSLOCATION OF MAIN PROSPECTS
à Prospect location with main commodities
%
PARONGIL
SOPOKOMIL
Prospect with published Mineral Resources
For
per
sona
l use
onl
y
-
7
HERALD RESOURCES EXPLORATION Lae Jehe Introduction The Lae Jehe prospect is located about 1.5km north of the main Anjing Hitam orebody and 800m north of the planned concentrator site. Lae Jehe is the most advanced target to provide future mill feed following the initial 7 year mine life at Anjing Hitam. The combined indicated and inferred resource at Lae Jehe stands at 6.5 Mt at 11.3% Zn, 6.1% Pb. Drilling continued through the quarter with either one or two drill rigs in operation. Two deep holes and one shallow hole were completed. One drill rig spent most of the quarter drilling geotechnical holes related to the proposed plant site construction. Drilling Drilling at the southern end of Lae Jehe Deeps on section 600N (see attached cross section and longitudinal section) intersected a narrow, fault affected M2 horizon in SOP271D, located between SOP229D and SOP240D. A flatter dipping hole, SOP259D, intersected multiple mineralised horizons within the Balga Fault. Assay results were received for the previously completed SOP256D which obtained a downhole intersection of 13.9m (estimated true width 11.9m) @ 16.5% Zn, 9.5% Pb. The previously reported apparent flattening of the mineralised horizon was caused by the approximate collar co-ordinates available at that time. The southern end of Lae Jehe was also targeted with the shallow drilling, and the 1 hole completed, SOP258D, intersected various thin, lower grade horizons (see table below). Assay results were received for the previously completed SOP257D which intersected thin, moderate to low grade mineralisation as shown in the table below.
For
per
sona
l use
onl
y
-
8
HERALD RESOURCES Lae Jehe Drill Intersections Hole North East Dip/
Azimuth (mag)
From m
To m
Width M
ETW m
Zn %
Pb %
Ag ppm
Horizon
SOP256D
700 1346 -65°/210° 518.20 532.10 13.90 11.88 16.50 9.50 4 M2
SOP257D* 10925 4900 -55°/307° 133.40136.40151.45164.70
134.40138.70152.45165.70
1.002.301.001.00
0.781.800.780.78
1.13 10.08
5.47 2.34
0.54 6.59 2.49 1.20
-
SO
P16
7D
DAIRI PROJECT
SO
P 9
D
SO
P25
6D
100806040200
4000
CROSS SECTION 800N
LAE JEHE SECTOR
SOPOKOMIL PROSPECT
SCALE 1:
BK
SO
JE
JU
DA
Down hole width @ Zn%/Pb%/ppm Ag
Base of moderate weathering
Fault/thrust zones
Massive dolostone
Shale and dolostone
MVT mineralised zones
Massive quartz veined dolomiteUpper/Lower Zones massive sulphide horizons
Carbonaceous shales
Siltstones/dolomitic siltstones
LEGEND
800mRL
700mRL700mRL
600mRL600mRL
500mRL500mRL
400mRL400mRL
300mRL300mRL
200mRL200mRL
100mRL100mRL
0mRL0mRL
13
00
E1
30
0E
12
00
E1
20
0E
11
00
E1
10
0E
10
00
E1
00
0E
90
0E
90
0E
80
0E
80
0E
70
0E
70
0E
SO
P217D
SO
P21
5D
SO
P171D
SOP
60D
SO
P 5
4D
SO
P 1
3D
SO
P 8
D
M6
M4M5
M6
M6
M1
M1M3
M2
M1
M3
M2
M3
M2
DA
JU
JU
Ju12
Ju12
Ju12?
SO JE
JE
DA
DA
13.9m@16.5/9.5
8.2m@2.6/1.4/9
6.6m@7.9/4.52.5m@6.9/3.9
10.8m@12.6/5.2
5.2m@3.6/1.7
3.5m@15.1/6.911.8m@11.3/5.4
2.3m@9.0/4.2
3.0m@6.1/3.03.9m@17.4/11.4
6m@11.4/7.5
11.3m@1.7/0.8
8.4m@2.1/1.1
3.0m@5.5/3.3
2.8m@10.2/4.6
23m@2.1/0.2
4.7m@3.3/1.5
4.7m@11.0/6.3
28m@3.4/0.0
9m@5.7/0.0
For
per
sona
l use
onl
y
-
40
0N
12
00
N
20016012080400
5000
Looking to 210 mag.(Grid West)
Upper Zone, M2 Horizon
LONGITUDINAL SECTIONLAE JEHE SECTOR
SCALE 1:
Massive Sulphide Outcrop
September Quarter Program & Results
Drillhole Pierce Point (est. true width @ %Zn/%Pb)
Downhole EM Anomaly
Published Resource Outline at +5% Zinc Equivalent
800mRL
600mRL
400mRL400mRL
200mRL200mRL
0mRL0mRL 12
00
N
10
00
N1
00
0N
80
0N
80
0N
60
0N
60
0N
40
0N
Target260D
Assays awaited
271D
3.7m@7.4/4.8259D
3.4m@1.5/0.8258D
1.8m@10.1/6.6257D
2.4m@8.5/4.6255D
1.0m@7.3/2.7254D
12.9m@16.5/9.5256D
5.4m@15.6/8.0
253D
6.2m@15.6/7.3
229D
0.7m@3.2/1.3223D (faulted)
1.3m@16.7/11.3
240D
2.0m@5.4/2.1228D
5.8m@3.4/2.6
223D
18.6m@15.1/7.7
222D
2.8m@15.3/11.3
221D
Fault Zone
1.0m@6.1/3.0219D
12.9m@15.4/8.2218D
3.7m@6.1/2.8
173D
beneath the fault zone.
Potential exists for further resources
Fault Zone
Rob1~7m@12.0/21.9Sapurang Anton
3.2m@1.7/0.749D
2.4m@1.2/0.4
205D
1.3m@1.2/0.7
207D
1.7m@0.8/0.5209D
1.6m@1.5/0.917D
1.8m@3.0/1.2172D
1.6m@2.7/1.3186D
1.6m@10.7/7.552D
2.4m@9.7/6.9206D
5.2m@10.0/5.659D
8.2m@8.8/4.8208D
5.7m@13.1/6.1196D
2.3m@8.7/4.4166D
1.4m@2.4/1.2170D
5.2m@11.4/7.5167D
11.0m@11.3/5.460D
8.1m@12.6/5.2215D
54D
1.6m@9.0/4.2
54D
2.1m@17.4/11.4171D
4.0m@11.0/6.313D
1.2m@4.1/1.2169D
2.9m@8.1/3.9168D
1.9m@1.0/0.312D
2.0m@2.5/1.511D
For
per
sona
l use
onl
y
-
ÊÚ
ÊÚ
ÊÚ
#S
#S
#S#S
#S
#S
#S
#S
#S
#S
#S
#S
#S
#S
#S
#S
#S#S
#S#S
#S
#S
#S#S
#S#S
#S
#S
#S
#S#S
#S#S
#S
#S
#S
#S
#S
#S
#S#S
#S
#S#S
#S
#S
#S
#S
#S
#S
5D
6D
7D
8D 9D
10D
11D
12D
13D 16D
17D
39D 40D
49D
52D
54D
57D
59D 60D
166D
167D
168D
169D
170D
171D 172D
186D
196D
205D
206D 207D
208D
209D
Rob 1
SaporangAnton
217D
221D
223D
219D
173D
218D 222D228D 240D
215D229D
256D
253D
254D 255D
257D
271D259D
258D
260D
"
1200N
1000N
800N
1000E
600N
Plan Projectionof Resources
Proposed Sitefor
Sopokomil JuluTreatment Plant
Figure 2
N
GAMBAR 5
10400 N
10600 N
10800 N
11000 N
11200 N
11400 N
11600 N
10400 N
10600 N
10800 N
11000 N
11200 N
11400 N
11600 N
4600
E
4800
E
5000
E
5200
E
4600
E
4800
E
5000
E
5200
E
Drill Hole ID206D! Drill Hole Trace
LEGEND
Massive SulphideOutcropÊÚ
Sedex TraceTracksRivers / streams
Peta Lokasi Lubang Bordi Prospek Lae Jehe
1:5000 0 50 100 Meters
LAE JEHEDRILL HOLE LOCATION PLAN
For
per
sona
l use
onl
y
-
12
HERALD RESOURCES Pre-Feasibility Program A geotechnical study was completed during the quarter by the same person who carried out the geotechnical study at Anjing Hitam. The geotechnical data available to date is being utilised in the Lae Jehe mine design which is in progress. Preliminary indications are that the dip of the ore body (~70°) is favourable to underground mining, although the ground conditions will require that stoping be limited to 25m level intervals and flatback cut and fill or bench and fill methods, with fibrecrete required in access development. The largest and highest grade mineralised horizons have been targeted. These areas have had ore drives and stopes designed around them. Realistic and practical mining rates have been determined for mining the horizons as a cut and fill method. The mining schedule for Lae Jehe is currently being built. This schedule will report critical information relating to the mining of the ore drives and stopes and will include development metres, diluted tonnes and grade, and contained metal. The metallurgical samples have been received by the laboratory and a programme of testwork is currently being designed. Sopokomil Exploration The main deposits identified at the Dairi Project to date (Anjing Hitam, Lae Jehe, Basecamp) are hosted by the Julu carbonaceous shale horizon on the eastern side of the large structure known as the Sopokomil Dome. Lae Puncu is 3 km southwest of Anjing Hitam and lies on the lightly explored SW flank of the Sopokomil Dome, where the prospective Julu shale horizon has been mapped and sampled for 4 km along strike between Lae Puncu and Lae Nteas. Work in the Lae Puncu area has located a 2.5-5.0m wide quartz-galena-sphalerite ± chalcopyrite vein/breccia hosted by Jehe dolostone. The vein/breccia so far has a strike length of 800m trending from 330°-355° and dipping moderately to the southwest. Rock chip samples have returned values of up to 24.8% Zn, 11.0% Pb and 79 g/t Ag all in the one sample, with a separate sample carrying 1.6% Cu. Follow up of these results will be carried out in the near future.
For
per
sona
l use
onl
y
-
13
HERALD RESOURCES Sinar Pagi Drilling continued throughout the quarter with hole SPA14D being completed on section 20,200E and holes SPA15D and SPA16D being completed on section 19,900E. The current drilling program is testing the Sinar Pagi lead-silver-zinc lode now intersected by SPA01D, SPA02D, SPA03D, SPA06D, SPA09D, SPA15D and SPA16D. Drill hole SPA14D was completed on the most eastern section drilled to date without intersecting any mineralisation. This does not necessarily close the lode off in this area and further drilling may be required on this cross section. Drill holes SPA15D and SPA16D tested down dip from successful holes SPA02D, SPA03D and SPA06D. SPA15D intersected from 182.90 down hole, a gossanous quartz breccia lode which assayed 27.5m @ 6.32% lead, 18 g/t silver and 0.96% zinc. A further zone of mineralisation, moderately oxidised but containing some galena and sphalerite, assayed 5.0m @ 0.70% lead, 63 g/t silver and 2.14% zinc. A deeper, narrow massive sulphide zone yielded 2.20m @ 19.5% lead, 170 g/t silver and 0.39% zinc. SPA16D also made a significant intersection of gossanous quartz breccia becoming more sulphidic near the base between 239.80m – 270.00m down the hole which assayed 30.20m @ 2.38% Pb, 5 g/t Ag and 0.21% Zn. Sinar Pagi Drill Intersections
Hole North East Dip/ Azimuth
(mag)
From m
To m
Width m
ETW m
Zn %
Pb %
Ag ppm
Remarks
SPA12D
29750 20100 -75°/45° Only very low base metal values were intersected
SPA13D 29750 20100 -56°/45°
Only very weak mineralisation intersected
SPA14D
29770 20200 -51°/45° No mineralisation intersected
SPA15D 29750 19900 -55°/40° 182.90 224.80 237.80
210.40 229.80 240.00
27.50 5.00 2.20
21.50 3.90 1.70
0.96 2.14 0.39
6.32 0.70
19.50
18 63
170
Oxide Ox/Sulph
Sulfide
SPA16D
29750 19900 -75°/40° 239.80 270.00 30.20 18.30 0.21 2.38 5 Oxide
(N.B. Azimuth 45° magnetic is equivalent to 5° Sinar Pagi Grid) Further drilling is planned for the December quarter to further test the Sinar Pagi galena lode.
For
per
sona
l use
onl
y
-
DAIRI PROJECT
18m@0.0/2.8/2 (in surface trench)
26m@0.1/3.0/4
15.4m @ 0.7/8.5/64
2.0m @6.4/8.6/332
4.5m @ 0.1/22.4/526.7m @ 3.4/1.1/101.5m @ 7.8/0.1/12
27.5m @ 1.0/6.3/18
5.0m @ 2.1/0.7/63
2.2m @ 0.4/19.5/170
30.2m @ 0.2/2.4/5
Fixed Loop TEM Anomaly
SP
A002D
SP
A003D
SP
A006D
SP
A007D
SP
A015D
SP
A016D
29
80
0N
29
80
0N
29
90
0N
29
90
0N
30
00
0N
30
00
0N
30
10
0N
30
10
0N
500mRL 500mRL
600mRL 600mRL
700mRL 700mRL
800mRL 800mRL
900mRL 900mRL
LEGEND
Mineralised zone
Dolostone
Siltstones/ shales
Down hole width @% Zn/%Pb/ppm Ag
Base of moderate weathering
SCALE 1:
SINAR PAGI PROSPECT
CROSS SECTION 19900E
2500
0 20 40 60 80 100
For
per
sona
l use
onl
y
-
15
HERALD RESOURCES SARKEA BASE METALS PROJECT Herald 100% This area is centred about 10km south of the Dairi Project’s Anjing Hitam deposit. It is held under a SIPP prospecting permit covering 9,606ha. An application has been lodged with the local government for a second year’s extension to the SIPP and it is hoped that the SIPP extension will be approved in October. Previously reported drilling has intersected narrow (1-3m) mineralised zones of up to: 13.7% zinc, 4500 ppm bismuth, 6010 ppm molybdenum, 1250 ppm tin and 3720 ppm tungsten. Broader zones (4 - 14m) of from 35.1 - 44.7% iron have also been intersected. These various mineralisation types are associated with skarns developed around the edges of two Sarkea Granite domes located at Sitapitapi and Bukit Enggang. No further work is planned on these prospects for the time being. Also at Sarkea, there is potential for Sedex style targets. Reconnaissance at Lae Lembara has identified a sphalerite-bearing breccia whilst at Lae Ikan follow up of pyritic silica float with 3% sphalerite veins identified a 12m wide outcrop of vuggy silica-pyrite rock within Tapanuli Group pyritic shale which has assayed at up to 1.5% Zn, 3.1% Pb and 50 g/t Ag. Follow up of these two prospects is planned in the coming quarters. MELUAK GOLD PROJECT Aceh Province Herald 26% via unlisted Corona Gold Ltd Meluak is contained within a 2,760ha SIPP prospecting permit issued by the Gayo Lues Regency. Discussions are continuing with the Regency authorities and the Mines Branch in Aceh about converting the SIPP to a Contract of Work, a much better form of title. Corona plans to resume exploration activities shortly, following up on previous exploration results such as 72m @ 0.54 g/t Au from 7m, including 8m @ 1.95 g/t Au. To this end, it has recently raised just under $1m via a placement of 7,800,000 shares at 12.5 cents.
For
per
sona
l use
onl
y
-
16
HERALD RESOURCES MONTAGUE GOLD PROJECT Herald 15% free carried Airport (M 57/98, M57/99) No work this quarter. A drilling programme is planned for the March 2007 quarter. N.B. The above information is based on reports provided by WCP Resources Ltd, manager of the Montague JV CRATER GOLD PROJECT Herald 20% free carried No work this quarter. Since the end of the quarter, WCP Resources Ltd has entered into a Deed of Variation whereby it has withdrawn from the two exploration licences which make up the Crater Gold Project. N.B. The above information is based on reports provided by WCP Resources Ltd, manager of the Montague JV.
For
per
sona
l use
onl
y
-
17
HERALD RESOURCES – CORPORATE CASH RESERVES At the date of writing, parent company Herald Resources Ltd held cash deposits of A$63M. M P WRIGHT Executive Director NOTE: Sections of information contained in this report that relate to Exploration Results and Mineral Resources were compiled or supervised by Mr B Kirkpatrick BSc, MAusIMM, MAIG who is a Member of The Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Mr Kirkpatrick, a full-time employee of Herald Resources Limited, has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Kirkpatrick consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
For
per
sona
l use
onl
y
-
18
HERALD RESOURCES - CORPORATE DIRECTORY
DIRECTORS BANKERS T M Allen, (Chairman) Societe Generale (Australia) M P Wright, BBus 400 George Street B J Hurley, AWASM, MAusIMM SYDNEY NSW 2000 J Dracopoulos, B.A. Acc, Grad Dip CSP, CPA COMPANY SECRETARY Challenge/Westpac M P Wright Banking Corporation 109 St Georges Tce SHARE REGISTRY PERTH WA 6000 Security Transfer Registrars Pty Ltd 770 Canning Highway AUDITORS APPLECROSS WA 6153 Stantons International 1 Havelock Street Telephone: 08 9315 0933 WEST PERTH WA 6005 Facsimile: 08 9315 2233 SOLICITORS AUSTRALIAN BUSINESS NUMBER Blakiston & Crabb 15 008 672 071 1202 Hay Street PERTH WA 6005 SHARE CAPITAL 196.8M shares REGISTERED OFFICE 5.2M options Level 3/50 Colin Street WEST PERTH WA 6005 Telephone: 08 9322 2788 Facsimile: 08 9481 1669 Email: hrl@herald.net.au