fpso petrojarl knarr - fact sheet
Post on 03-Sep-2014
2.101 Views
Preview:
DESCRIPTION
For more information about Teekay's Floating Production Storage and Offloading (FPSO) units, visit http://www.teekay.com/business/fpso/default.aspx
TRANSCRIPT
www.teekay.com
Petrojarl Knarr
TEEKAY PETROJARL
Rev
. Jun
e 20
13
Teekay Petrojarl
Beddingen 16
N-7014 Trondheim
Norway
Tel: +47 73 98 30 00
PETROJARL KNARR
Design
Contract
Delivered
Contract Status
Client
Status
Field Location
Country
Water Depth
New/Conversion
Mooring Type
Riser Slots
Accommodation
Storage Capacity
Oil Production
Produced Water
Total Liquids
Gas Handling
Water Injection
Length Overall
Breadth
Ship Shape / Samsung
Time Charter
2014
2020 + options (1 x 14 years)
BG Norge
Under Construction at Samsung
Heavy Industries, Korea
Knarr Field
Norway
410 m
New build
Turret Mooring
15
100
800,000 bbls
63,000 bopd
84,000 bwpd
110,000 bpd
47 mmscfd
95,000 bwpd
256.4 m
48.0 m