From: Kannel, Joseph E

To: Phillips, Wayne L; Broviak, David E

Subject: CSL Behring Entrance Permit - Village of Bradley

Date: Thursday, April 11, 2019 7:35:04 AM

Joe Kannel, P.E.

Studies & Plans Project Engineer

Illinois Department of Transportation

Region 2, District 3

Phone: 815-434-8454

Email: Joseph.Kannel@illinois.gov

7(1)(f)

From: Zemanek, Emily C.

To: Michael Gingerich; Broviak, David E; Ferguson, Scott A; Ferguson, Steven P; Simpson, Robert P; Ballerini, RichardA

Cc: Phillips, Wayne L

Subject: CSL Meeting Minutes

Date: Monday, April 15, 2019 9:26:09 AM

Attachments: L 16410 4-11-19 Meeting Minutes.docx

Mike,

Please see the attached meeting minutes from 4-11-2019. Please let us know if they are

satisfactory. Also, if you could, provide the pdf version of the plans you brought to the meeting.

Send them to DOT.D3.Permits@illinois.gov . Thank you!

Emily Zemanek

District 3 Permit Technician

Illinois Department of Transportation

700 E. Norris Dr.

Ottawa, IL 61350

Phone: 815-434-8430

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Subject: CSL meeting

Date: Wednesday, July 11, 2018 11:07:00 AM

Mike,

Following up from the confusing voicemail I left you this morning (I apologize).

I’d like your assistance with coordinating and participating in a meeting with CSL to discuss IL 50, IL

50 and Armor Road intersection, etc.

Looking at mine and Kevin Marchek’s (Regional Engineer) calendars for possible dates:

July 31

August 14, 15, 16, 21, 22 or 23

In order to fit Kevin’s drive from Dixon to Ottawa to Bourbonnais, I was thinking a 10 AM time frame.

Please let me know what (if any dates) work for you and CSL.

Thank you,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

From: Michael Gingerich

To: Phillips, Wayne L

Cc: Andrews, Steve B

Subject: [External] CSL Behring Expansion - Route 50 Impact and Proposed Access

Date: Thursday, April 19, 2018 10:33:31 AM

Attachments: A few CSL exhibits.pdfCSL SOUTH ACCES EXHIBIT.pdf

Hi Wayne

Thank you for making time next Wednesday at 2p to meet at your office. I have attached a

few slides CSL has make available.

I also attached one of CSL’s planning exhibits I marked for reference. Note, where is says

“Christine Drive” is actually a private access to Lowes with an ingress/egress easement to

Christine Drive. There is some discussion of making that drive a public street.

The proposed multi-use path is not shown on the plan. It will likely be proposed to be 10

feet wide, located on the west side of Route 50 from Armour Road to Mulligan Drive, and

be placed on additional right-of-way.

If you have a minute, please take a look and see if you can find some preliminary

engineering drawings for the improvement of Route 50/Armour Road intersection. They

were presented by IDOT for discussion (10 years + ish ago?)

See you next week,

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Michael Gingerich

To: Phillips, Wayne L; Jessica.Bartels@cslbehring.com

Subject: [External] CSL South Expansion - IDOT Planning Meeting

Date: Thursday, July 12, 2018 10:07:51 AM

Wayne,

I believe you and Jessica Bartels were introduced at the Governor’s meeting at CSL a few

weeks ago.

Jessica is my prime contact with CSL for the Route 50 access work and other infrastructure

projects at CSL. I believe she will be your primary contact for coordinating the upcoming

meeting at the CSL facility.

Jessica Bartels

Jessica.Bartels@cslbehring.com

815-935-3179

Jess,

Wayne’s initial invitee list includes our IDOT Regional Engineer Kevin Marchek, the

Kankakee County board chairman Andy Wheeler, the Kankakee County highway engineer

Mark Rogers, Mayor Paul Schore (Bourbonnais), Mayor Bruce Adams (Bradley) and me. I

suggested Mayor Tim Nugent (Manteno, K3 Economic Alliance) might be a good addition.

Wayne is working towards an August 23rd meeting at 10 a.m. I think it would be good to

initially meet on the CSL site in order to put eyes on the property and adjacent roadways. If

weather allows, it might be interesting to park at the CSL South, south lot, and walk from

there out the existing access and then along Route 50 to the Armour Road intersection. If

we have a hard time finding a suitable place to sit down, I am sure Tim Nugent would be

glad to host the meeting at the K3 Economic Alliance board room.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Jessica.Bartels@cslbehring.com

To: Chris.Abell@cslbehring.com; Maureen.Powell@cslbehring.com; Adam.Kennell@cslbehring.com;MGing@mg2a.com; Phillips, Wayne L

Subject: [External] CSL South Expansion- IDOT Planning Meeting

Good morning,

Please plan to attend this meeting to discuss IL Route 50 access, pedestrian access, and the intersection of IL Route 50 and Armour Road.

Thanks,

Jess Bartels

Infrastructure Program Manager

CSL Behring Biotherapies for Life™ PO Box 511 | Kankakee IL, 60901 Phone: (815) 935-3179

This email, including any attachments, is confidential and contains proprietary content and may be legally privileged. This transmission is intendedonly for the designated recipient(s), and any duplication or distribution, in any form or part, without the written consent of the sender is strictlyprohibited. These confidentiality protections apply even if you received this transmission in error, in which case you should delete the message,disregard its contents and notify the sender of the mistake. CSL Behring

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] [PROJ]18-148 - CSL South Expansion - Traffic Impact Study

Date: Thursday, June 28, 2018 11:39:37 AM

Attachments: 5381.900 CSL Expansion Bradley 062618.pdf

Hi Wayne

I have attached a PDF copy of the traffic impact study to be submitted today. How many

printed copies are desired?

Please note two changes that shall be made to the TIS:

1. The “CSL West” access described in the study is to be closed.

2. The “VISITOR ACCESS” described in the study is to be closed.

Please also note traffic signals are recommended at CSL’s

Do I need to make any particular request for review, approval, or permit in my cover letter?

Would it be appropriate to aske for a letter or statement of feasibility for the “Employee

Access” and “Truck Access” described in the study?

Would it be more beneficial to hand deliver the report and have a short meeting or to meet

after your team has had time to do a read-through?

Thank you for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] RE: CSL Behring - Expansion - A few of your questions

Date: Monday, August 06, 2018 2:49:26 PM

I have blocked out Monday 13, from 9a to noon. Just let me know if you are running late.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Monday, August 06, 2018 2:29 PM

To: Michael Gingerich <MGing@mg2a.com>

Subject: RE: CSL Behring - Expansion - A few of your questions

Mike,

I was going to email you today to suggest Monday the13th.

I am available all day. I can be there between 9 and 9:30.

I believe it would be best to meet at your office to go over a few the proposals and if needed verify

in the field, we can.

Wayne

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Monday, August 06, 2018 11:30 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] CSL Behring - Expansion - A few of your questions

Hi Wayne – Below are answers to your questions.

• dates on when ground is breaking for the next phases

An official ground breaking is expected as soon as IDOT indicates the proposed main

access to Route 50 is feasible. A soft ground breaking is expected in September to

start construction of the Ring Road and Parking facilities.

The build out of top 4 floors of Building 33 is expected to start Fall 2018.

• number of temp employees (contractors)

CSL expects the number of construction contractors to be vary from 200 and 800 at

any given time during the expansion. Some 200 construction contractors are

expected to be on site this Summer and Fall to support the Building 33 build-out and

CSL South Site Improvements. Additional contractors are expected this Fall or Spring

2019 when work commences on Building 41 and then again when work on the SPINE

and Route 50 access improvements commence.

• number of CSL employees when completed

The number of employees CSL expects when the work is completed depends on the

final design of each product manufacturing facility and process. CSL currently has

over 1600 employees. That number is increasing.

shift work? Approx.. start-quit times

The typical shifts are as follows:

First 0700 to 1505

2nd 1500 to 2305

3rd 2300 to 0705

Salaried employees arrive between 0700 and 0800 and leave around 1630 and 1730.

• entrance locations (vehicle and pedestrian)

o it was mentioned a cross walk across IL 50 for lunch breaks?

CSL is proposing 3 vehicle entrance locations.

Continue to use the existing Armour Road access. CSL plans to extend

pedestrian access from this location to Route 50 on the south side of

Armour Road. CSL is requesting pedestrian crossings be included in any

IDOT improvement to the Armour/ Route 50 intersection. It is a high

priority visiting CSL employees and recruits be able to walk from lodging

facilities to CSL and other local amenities.

Construct a new main employee and visitor access on Route 50 opposite

Lowe’s controlled access. CSL plans for this intersection include controlled

pedestrian crossings.

Construct a new truck access on Route 50 at the same location as the

temporary construction access recently approved. No pedestrian entrance

is expected at this location.

o Temporary vs permanent

The only temporary access proposed is the temporary construction access

to Route 50 that was recently approved. However, CSL is requesting a

permanent access at this same location (new truck access).

Closures.

CSL plans to close the current access on Armour Road nearest to the rail

road bridge (not the currently employee access). They would like to

discuss keeping the access in a condition suitable for emergency egress.

CSL plans to close the former Bunge facility main access and former Bunge

administrative access when the proposed, new CSL South main access and

truck access are constructed.

There is some desire to have the option to re-open the former Bunge

administrative access in the future if the building use changes to a

welcome center or “off-site” meeting point. Neither of these uses are

planned at this time.

Please let me know if you have further questions. I am available to meet with you M

(13),Th(16) and F(17) next week and M(20) and Tu(21) the following week. We can meet here

at our office in Bradley if being close to the site would be beneficial or I am able to come to

you. Just let me know.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] RE: CSL meeting

Date: Wednesday, July 11, 2018 2:35:00 PM

Wayne,

I passed those dates for a mid-morning meeting on to Jessica Bartle’s (CSL). I will let you

know as soon as Jess gets back to me on a good date on your list for her and Chris Abel.

Great to hear from you. Is there anything I can do to help Jessica be best prepared for the

meeting?

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Wednesday, July 11, 2018 11:08 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: CSL meeting

Mike,

Following up from the confusing voicemail I left you this morning (I apologize).

I’d like your assistance with coordinating and participating in a meeting with CSL to discuss IL 50, IL

50 and Armor Road intersection, etc.

Looking at mine and Kevin Marchek’s (Regional Engineer) calendars for possible dates:

July 31

August 14, 15, 16, 21, 22 or 23

In order to fit Kevin’s drive from Dixon to Ottawa to Bourbonnais, I was thinking a 10 AM time frame.

Please let me know what (if any dates) work for you and CSL.

Thank you,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] Re: CSL meeting

Date: Thursday, July 12, 2018 7:52:35 AM

I forgot to mention. CSL has a Bourbonnais address but is located in Unincorporated K3county. The county permits and inspects CSL projects. Armour Road is a County HW east of50.

I recommend inviting K3 Co Chairman Andy Wheeler and K3 Co HW Engineer Mark Rogers.

If you invite Mayor Schore, Bourbonnais, Mayor Adams, Bradley should also be included.

Mike Gingerich, P.E., Ph.D.MG2AC.815-693-0124O.815-939-4921

From: Michael Gingerich <mging@mg2a.com>

Sent: Wednesday, July 11, 2018 3:52 PM

To: Phillips, Wayne L

Subject: RE: CSL meeting

Hi Wayne –

August 22 or 23 at 10 a.m. work. Please confirm which so we can lock down the meeting

date and time

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Michael Gingerich

Sent: Wednesday, July 11, 2018 2:34 PM

To: 'Phillips, Wayne L' <Wayne.Phillips@illinois.gov>

Subject: RE: CSL meeting

Wayne,

I passed those dates for a mid-morning meeting on to Jessica Bartle’s (CSL). I will let you

know as soon as Jess gets back to me on a good date on your list for her and Chris Abel.

Great to hear from you. Is there anything I can do to help Jessica be best prepared for the

meeting?

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Wednesday, July 11, 2018 11:08 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: CSL meeting

Mike,

Following up from the confusing voicemail I left you this morning (I apologize).

I’d like your assistance with coordinating and participating in a meeting with CSL to discuss IL 50, IL

50 and Armor Road intersection, etc.

Looking at mine and Kevin Marchek’s (Regional Engineer) calendars for possible dates:

July 31

August 14, 15, 16, 21, 22 or 23

In order to fit Kevin’s drive from Dixon to Ottawa to Bourbonnais, I was thinking a 10 AM time frame.

Please let me know what (if any dates) work for you and CSL.

Thank you,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] RE: CSL meeting

Date: Thursday, July 12, 2018 10:04:36 AM

Don’t hesitate to ask for any information that might be helpful.

One more addition – Mayor Tim Nugent (Manteno) is the CEO of the “Kankakee Economic

Alliance” he has been at CSL, community meetings and the CSL leadership value his input.

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Thursday, July 12, 2018 8:01 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: RE: CSL meeting

That is what I was looking for………I was thinking Andy and Mayor Schore, but Mark and Mayor

Adams are great additions to the list.

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Thursday, July 12, 2018 7:52 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] Re: CSL meeting

I forgot to mention. CSL has a Bourbonnais address but is located in Unincorporated K3 county. The

county permits and inspects CSL projects. Armour Road is a County HW east of 50.

I recommend inviting K3 Co Chairman Andy Wheeler and K3 Co HW Engineer Mark Rogers.

If you invite Mayor Schore, Bourbonnais, Mayor Adams, Bradley should also be included.

Mike Gingerich, P.E., Ph.D.

MG2A

C.815-693-0124

O.815-939-4921

From: Michael Gingerich <mging@mg2a.com>

Sent: Wednesday, July 11, 2018 3:52 PM

To: Phillips, Wayne L

Subject: RE: CSL meeting

Hi Wayne –

August 22 or 23 at 10 a.m. work. Please confirm which so we can lock down the meeting

date and time

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Michael Gingerich

Sent: Wednesday, July 11, 2018 2:34 PM

To: 'Phillips, Wayne L' <Wayne.Phillips@illinois.gov>

Subject: RE: CSL meeting

Wayne,

I passed those dates for a mid-morning meeting on to Jessica Bartle’s (CSL). I will let you

know as soon as Jess gets back to me on a good date on your list for her and Chris Abel.

Great to hear from you. Is there anything I can do to help Jessica be best prepared for the

meeting?

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Wednesday, July 11, 2018 11:08 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: CSL meeting

Mike,

Following up from the confusing voicemail I left you this morning (I apologize).

I’d like your assistance with coordinating and participating in a meeting with CSL to discuss IL 50, IL

50 and Armor Road intersection, etc.

Looking at mine and Kevin Marchek’s (Regional Engineer) calendars for possible dates:

July 31

August 14, 15, 16, 21, 22 or 23

In order to fit Kevin’s drive from Dixon to Ottawa to Bourbonnais, I was thinking a 10 AM time frame.

Please let me know what (if any dates) work for you and CSL.

Thank you,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] RE: CSL Private Access - Main Access

Date: Thursday, April 04, 2019 1:30:58 PM

Wayne – I can meet with you Thursday afternoon. I appreciate you being available. Shoot

me the best time for you.

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Thursday, April 04, 2019 1:20 PM

To: Michael Gingerich <MGing@mg2a.com>

Subject: RE: CSL Private Access - Main Access

Mike,

Unfortunately, next week the only timeframe I am free is Thursday afternoon.

Does that work for you?

Or do you want to meet with someone else?

Wayne

From: Michael Gingerich <MGing@mg2a.com>

Sent: Thursday, April 04, 2019 11:07 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] CSL Private Access - Main Access

Hi Wayne,

Are you available Tuesday or Wednesday next week if I drive out to Ottawa to meet? I

received some unanticipated pressure regarding access approval this morning. I will make

myself available anytime and can confine the duration fit your availability.

I am not expecting much from you at the meeting but would like to have a quick look at our

plans with you and then leave them with you for preliminary comment.

Anyone on your team interested in participating would of course be welcome.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] RE: CSL South Entrance - County Resolution

Date: Monday, April 08, 2019 9:08:58 AM

Hi Wayne – thank you. Do you have a project number for the Armour Road – Route 50

intersection? There are several people wanting to support the project and would like to

reference it correctly.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Monday, April 08, 2019 7:43 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: RE: CSL South Entrance - County Resolution

Mike,

I will get my staff moving on getting these examples to you.

Wayne

From: Michael Gingerich <MGing@mg2a.com>

Sent: Friday, April 05, 2019 3:40 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] CSL South Entrance - County Resolution

Hi Wayne – Can you help me with the following?

1. A sample of the agreement/resolution Kankakee County will need to pass to sponsor

the entrance. They have agreed to do whatever is necessary but I would like to get

that ball rolling.

a. Maintenance of mutli-use path

b. Power supply?

c. Maintaining signals?

2. A sample of the format IDOT will use to accept ownership of additional right-of-way.

3. Will CSL need to provide a bond for the intersection improvements? If so, can we get

that in motion or at least get an example in front of them?

It took CSL a long time to be able to process the bond for the temporary access. I

would like them to better understand the process.

Is there anything else other than getting the final plans to you that I can be working on or

we can be getting in front of the county or CSL?

One topic I would like to discuss at our meeting Thursday if possible is drainage.

Particularly, what information and supporting calculations are needed. Do you have a

particular check list you would like us to use?

Thanks for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] RE: CSL

Date: Thursday, July 26, 2018 10:54:12 AM

Wayne

I would like to meet you before the meeting on the 23rd. CSL is my top priority at the moment. Anything you and I

can do to make the Aug.23 meeting as beneficial as possible is a good use of my time.

I have suggested responses to your earlier questions and put those in CSL management's hands for review. I hope to

get those to you soon.

Thanks,

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

-----Original Message-----

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Thursday, July 26, 2018 9:39 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: CSL

Mike,

Please find attached the District's review of TIS. A hardcopy will be in the mail.

Do you believe it would be beneficial for you and I to meet prior to the scheduled meeting on August 23rd?

I'd be happy to meet at your office to hear and see what you/MG2A/CSL are proposing and look at the site together.

But I do not know what your timeframe and contract is like with CSL and I do not want to inconvenience you.

I am big on making meetings as productive as possible and if we can work out details beforehand the better we can

steer the meeting and future project.

Just let me know,

Wayne

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is confidential,

may be attorney-client privileged or attorney work product, may constitute inside information or internal

deliberative staff communication, and is intended only for the use of the addressee. Unauthorized use, disclosure or

copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received

this communication in error, please notify the sender immediately by return e-mail and destroy this communication

and all copies thereof, including all attachments. Receipt by an unintended recipient does not waive attorney-client

privilege, attorney work product privilege, or any other exemption from disclosure.

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] RE: [PROJ]18-148 - CSL South Expansion - Traffic Impact Study

Date: Thursday, June 28, 2018 11:54:31 AM

Thank you for your help Wayne. I will send two printed copies with a cover letter.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Thursday, June 28, 2018 11:47 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: RE: [PROJ]18-148 - CSL South Expansion - Traffic Impact Study

Mike,

You email is timely because I had a conference call with Springfield this morning regarding CSL and

the Traffic Impact Study was mentioned several times.

Answering your questions:

1. Four copies, please.

2. Yes, ask for a review and comments on the feasibility of the Employee Access and the Truck

Access as part of the review of the TIS.

3. Let us review the report first and then we can meet again.

Thank you,

Wayne

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Thursday, June 28, 2018 11:37 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] [PROJ]18-148 - CSL South Expansion - Traffic Impact Study

Hi Wayne

I have attached a PDF copy of the traffic impact study to be submitted today. How many

printed copies are desired?

Please note two changes that shall be made to the TIS:

1. The “CSL West” access described in the study is to be closed.

2. The “VISITOR ACCESS” described in the study is to be closed.

Please also note traffic signals are recommended at CSL’s

Do I need to make any particular request for review, approval, or permit in my cover letter?

Would it be appropriate to aske for a letter or statement of feasibility for the “Employee

Access” and “Truck Access” described in the study?

Would it be more beneficial to hand deliver the report and have a short meeting or to meet

after your team has had time to do a read-through?

Thank you for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Michael Gingerich

To: Phillips, Wayne L

Subject: [External] [WARNING: ATTACHMENT UNSCANNED]FW: CSL Behring IDS Submittal

Date: Monday, April 08, 2019 2:49:57 PM

Attachments: 5381.900 IL 50 IDS Ballerini LOT 032519.pdf5381.900 IL 50 at CSL IDS Submittal 032519.pdfIL 50 AT CSL IDS 2023.pdf50 at Entrance QUEUES.pdf5381.900 IL Rte 50 at CSL-Lowes IDS 032519.pdf

Please let me know if you did not receive this transmittal. I will bring hard copies with me

Thursday if needed.

From: Daniel Brinkman <dbrinkman@gha-engineers.com>

Sent: Monday, March 25, 2019 3:25 PM

To: Michael Gingerich <MGing@mg2a.com>; Joel Greer <JGreer@mg2a.com>

Subject: CSL Behring IDS Submittal

Mike and Joel,

Find attached a copy of the CSL IDS submittal going to IDOT via overnight mail today. We

will get moving on the Armour IDS as well.

Dan

--

Dan Brinkman, P.E.,PTOE

Assistant Director of Transportation Services

625 Forest Edge Drive | Vernon Hills, Illinois 60061

Office: (847) 478-9700 | Fax: (847) 478-9701

Direct: (847) 821-6222 | Email:dbrinkman@gha-engineers.comwww.gha-engineers.com

P Please consider the environment before printing this email.

From: Phillips, Wayne L

To: Broviak, David E; Ferguson, Scott A; Zemanek, Emily C.; Ballerini, Richard A

Subject: FW: CSL Behring IDS Submittal

Date: Monday, April 08, 2019 2:59:00 PM

Attachments: 5381.900 IL 50 IDS Ballerini LOT 032519.pdf5381.900 IL 50 at CSL IDS Submittal 032519.pdfIL 50 AT CSL IDS 2023.pdf50 at Entrance QUEUES.pdf5381.900 IL Rte 50 at CSL-Lowes IDS 032519.pdf

From: Michael Gingerich <MGing@mg2a.com>

Sent: Monday, April 08, 2019 2:49 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] [WARNING: ATTACHMENT UNSCANNED]FW: CSL Behring IDS Submittal

Please let me know if you did not receive this transmittal. I will bring hard copies with me

Thursday if needed.

From: Daniel Brinkman <dbrinkman@gha-engineers.com>

Sent: Monday, March 25, 2019 3:25 PM

To: Michael Gingerich <MGing@mg2a.com>; Joel Greer <JGreer@mg2a.com>

Subject: CSL Behring IDS Submittal

Mike and Joel,

Find attached a copy of the CSL IDS submittal going to IDOT via overnight mail today. We

will get moving on the Armour IDS as well.

Dan

--

Dan Brinkman, P.E.,PTOE

Assistant Director of Transportation Services

625 Forest Edge Drive | Vernon Hills, Illinois 60061

Office: (847) 478-9700 | Fax: (847) 478-9701

Direct: (847) 821-6222 | Email:dbrinkman@gha-engineers.comwww.gha-engineers.com

P Please consider the environment before printing this email.

7(1)(f)

From: Phillips, Wayne L

To: Ballerini, Richard A

Subject: FW: CSL South Entrance - County Resolution

Date: Monday, April 08, 2019 7:54:00 AM

From: Michael Gingerich <MGing@mg2a.com>

Sent: Friday, April 05, 2019 3:40 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] CSL South Entrance - County Resolution

Hi Wayne – Can you help me with the following?

1. A sample of the agreement/resolution Kankakee County will need to pass to sponsor

the entrance. They have agreed to do whatever is necessary but I would like to get

that ball rolling.

a. Maintenance of mutli-use path

b. Power supply?

c. Maintaining signals?

2. A sample of the format IDOT will use to accept ownership of additional right-of-way.

3. Will CSL need to provide a bond for the intersection improvements? If so, can we get

that in motion or at least get an example in front of them?

It took CSL a long time to be able to process the bond for the temporary access. I

would like them to better understand the process.

Is there anything else other than getting the final plans to you that I can be working on or

we can be getting in front of the county or CSL?

One topic I would like to discuss at our meeting Thursday if possible is drainage.

Particularly, what information and supporting calculations are needed. Do you have a

particular check list you would like us to use?

Thanks for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

7(1)(f)

From: Zemanek, Emily C.

To: Simpson, Robert P; Phillips, Wayne L; Stoddard, Keith W.

Subject: FW: CSL South Entrance - County Resolution

Date: Wednesday, April 10, 2019 8:26:20 AM

Bob,

Wayne,

Thanks.

From: Ballerini, Richard A

Sent: Tuesday, April 09, 2019 2:10 PM

To: Zemanek, Emily C. <Emily.Zemanek@Illinois.gov>

Subject: FW: CSL South Entrance - County Resolution

From: Phillips, Wayne L

Sent: Monday, April 08, 2019 7:54 AM

To: Ballerini, Richard A <Richard.Ballerini@illinois.gov>

Subject: FW: CSL South Entrance - County Resolution

Rich/Emily,

Thank you,

Wayne

From: Michael Gingerich <MGing@mg2a.com>

Sent: Friday, April 05, 2019 3:40 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] CSL South Entrance - County Resolution

Hi Wayne – Can you help me with the following?

1. A sample of the agreement/resolution Kankakee County will need to pass to sponsor

the entrance. They have agreed to do whatever is necessary but I would like to get

that ball rolling.

a. Maintenance of mutli-use path

b. Power supply?

c. Maintaining signals?

2. A sample of the format IDOT will use to accept ownership of additional right-of-way.

3. Will CSL need to provide a bond for the intersection improvements? If so, can we get

that in motion or at least get an example in front of them?

It took CSL a long time to be able to process the bond for the temporary access. I

would like them to better understand the process.

Is there anything else other than getting the final plans to you that I can be working on or

we can be getting in front of the county or CSL?

One topic I would like to discuss at our meeting Thursday if possible is drainage.

Particularly, what information and supporting calculations are needed. Do you have a

particular check list you would like us to use?

Thanks for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Osman, Omer M; Loete, Paul A.; Marchek, Kevin F

Subject: FW: L-16410

Date: Monday, April 08, 2019 4:44:00 PM

FYI

From: Phillips, Wayne L

Sent: Monday, April 08, 2019 4:28 PM

To: DOT.D3 Permits <DOT.D3.Permits@illinois.gov>; Ferguson, Scott A

<Scott.Ferguson@illinois.gov>; Stoddard, Keith W. <Keith.Stoddard@Illinois.gov>; Devine, Daniel M

<Daniel.Devine@illinois.gov>; Broviak, David E <David.Broviak@illinois.gov>; Duncan, Bradley D

<Bradley.Duncan@illinois.gov>

Cc: Ballerini, Richard A <Richard.Ballerini@illinois.gov>; Zemanek, Emily C.

<Emily.Zemanek@Illinois.gov>

Subject: RE: L-16410

Correction, we will hand Mike our response to his March 26th submittal at this Thursday afternoon’s

meeting ( April 11 at 1:30pm).

From: Phillips, Wayne L

Sent: Monday, April 08, 2019 4:08 PM

To: DOT.D3 Permits <DOT.D3.Permits@illinois.gov>; Ferguson, Scott A

<Scott.Ferguson@illinois.gov>; Stoddard, Keith W. <Keith.Stoddard@Illinois.gov>; Devine, Daniel M

<Daniel.Devine@illinois.gov>; Broviak, David E <David.Broviak@illinois.gov>; Duncan, Bradley D

<Bradley.Duncan@illinois.gov>

Cc: Ballerini, Richard A <Richard.Ballerini@illinois.gov>; Zemanek, Emily C.

<Emily.Zemanek@Illinois.gov>

Subject: RE: L-16410

Thank you in advance.

From: DOT.D3 Permits

Sent: Monday, April 08, 2019 4:02 PM

To: Ferguson, Scott A <Scott.Ferguson@illinois.gov>; Stoddard, Keith W.

<Keith.Stoddard@Illinois.gov>; Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Devine, Daniel M

<Daniel.Devine@illinois.gov>; Broviak, David E <David.Broviak@illinois.gov>; Duncan, Bradley D

<Bradley.Duncan@illinois.gov>

Subject: FW: L-16410

All,

Please review this resubmittal. If I added you prematurely to the review, I apologize.

From: Zemanek, Emily C.

Sent: Monday, April 08, 2019 3:59 PM

To: DOT.D3 Permits <DOT.D3.Permits@illinois.gov>

Subject: L-16410

L-16410 AS RECEIVED 2019-03-26.pdf

Emily Zemanek

District 3 Permit Technician

Illinois Department of Transportation

700 E. Norris Dr.

Ottawa, IL 61350

Phone: 815-434-8430

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

7(1)(f)

From: Phillips, Wayne L

To: Wick, Joseph C; Hufnagel, Thomas J

Subject: FW: Notes from CSL Behring Presentation

Date: Tuesday, June 19, 2018 4:25:00 PM

FYI

From: Phillips, Wayne L

Sent: Tuesday, June 19, 2018 4:22 PM

To: Broviak, David E <David.Broviak@illinois.gov>; Andrews, Steve B <Steve.Andrews@illinois.gov>;

Magolan, Thomas J <Thomas.Magolan@illinois.gov>; Ferguson, Scott A

<Scott.Ferguson@illinois.gov>; Lindenmier, Ryan M <Ryan.Lindenmier@illinois.gov>

Subject: Notes from CSL Behring Presentation

7(1)(f)

7(1)(f)

From: Phillips, Wayne L

To: Ballerini, Richard A

Subject: FW: [PROJ]18-148 - CSL South Expansion - Traffic Impact Study

Date: Friday, June 29, 2018 1:14:00 PM

Attachments: 5381.900 CSL Expansion Bradley 062618.pdf

FYI

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Thursday, June 28, 2018 11:37 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] [PROJ]18-148 - CSL South Expansion - Traffic Impact Study

Hi Wayne

I have attached a PDF copy of the traffic impact study to be submitted today. How many

printed copies are desired?

Please note two changes that shall be made to the TIS:

1. The “CSL West” access described in the study is to be closed.

2. The “VISITOR ACCESS” described in the study is to be closed.

Please also note traffic signals are recommended at CSL’s

Do I need to make any particular request for review, approval, or permit in my cover letter?

Would it be appropriate to aske for a letter or statement of feasibility for the “Employee

Access” and “Truck Access” described in the study?

Would it be more beneficial to hand deliver the report and have a short meeting or to meet

after your team has had time to do a read-through?

Thank you for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L

To: Wielgopolan, Julie A

Subject: FW: Sen. Hutchison

Date: Thursday, April 11, 2019 11:59:00 AM

For your records………

From: Cortez-Hun, Nicola G

Sent: Tuesday, April 09, 2019 9:18 AM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Phillips, Wayne L <Wayne.Phillips@illinois.gov>;

Decker, Jessie R. <Jessie.Decker@illinois.gov>

Cc: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>;

Osman, Omer M <Omer.Osman@illinois.gov>

Subject: RE: Sen. Hutchison

Senator Hutchinson’s office has been brought up to speed as of yesterday afternoon.

From: Tridgell, Guy

Sent: Monday, April 8, 2019 4:53 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>;

Cortez-Hun, Nicola G <Nicola.Cortez-Hun@illinois.gov>

Cc: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>;

Osman, Omer M <Omer.Osman@illinois.gov>

Subject: RE: Sen. Hutchison

Adding Nicky…

From: Phillips, Wayne L

Sent: Monday, April 8, 2019 4:53 PM

To: Decker, Jessie R. <Jessie.Decker@illinois.gov>; Tridgell, Guy <Guy.Tridgell@illinois.gov>

Cc: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>;

Osman, Omer M <Omer.Osman@illinois.gov>

Subject: FW: Sen. Hutchison

Jessie/Guy,

Wayne

From: Wielgopolan, Julie A

Sent: Monday, April 08, 2019 2:14 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: FW: Sen. Hutchison

7(1)(f)

Thanks

Julie

From: Williams, Kristin J.

Sent: Monday, April 08, 2019 2:07 PM

To: Wielgopolan, Julie A <Julie.Wielgopolan@illinois.gov>

Subject: Sen. Hutchison

Kristin Williams

Illinois Department of Transportation

Executive Assistant to Acting Secretary Osman

2300 S. Dirksen Parkway, Rm. 300

Springfield, IL 62764

217/782-6149

From: Bristow, Tamara <tbristow@senatedem.ilga.gov>

Sent: Monday, April 08, 2019 2:03 PM

To: Williams, Kristin J. <Kristin.Williams@illinois.gov>

Subject: [External] Please HELP!

Hi Kristin,

Please read below:

CSL Behring is in the early phases of a 1.8 million-square-foot expansion which will easily require an

investment far north of $1 billion.

Although employment projections have not been publicized yet, there is speculation it could come

close to doubling the existing 1,600-member workforce.

The Australian-based pharmaceutical company has not asked for a penny of financial assistance or

tax breaks from any governmental body.

It has made one seemingly simple request. This request was made 16 months ago, and as of this

week, it still has not been satisfied.

CSL wants a traffic light put at its pending new entrance at the intersection at the Lowe’s Hardware

store. The company has told the Illinois Department of Transportation it will pay for the stoplight.

Incredibly, a state thirsting for manufacturing development has yet to OK what seems to be a simple

request. […]

Abell said CSL is making the largest investment anywhere in the state and perhaps beyond and yet,

their request cannot be resolved.

“We can’t get a three-way light to become a four-way light.” […]

Kankakee County Board Chairman Andy Wheeler said he’s been calling IDOT in Springfield, local

state political leaders and anyone else he can think of to get the situation rectified.

Thanks,

Tammy Bristow

Legislative Assistant to

Senator Toi Hutchinson

State House, Room 108A

Springfield, IL 62706

217.782.7419

www.SenatorHutchinson.com

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Osman, Omer M

To: Tridgell, Guy

Cc: Marchek, Kevin F; Phillips, Wayne L; Loete, Paul A.; Decker, Jessie R.

Subject: Re: Bradley intersection/CSL Behring

Date: Tuesday, April 09, 2019 3:51:55 PM

Sent from my iPhone

On Apr 9, 2019, at 3:32 PM, Tridgell, Guy <Guy.Tridgell@illinois.gov> wrote:

Wayne/Kevin,

Thanks.

 

7(1)(f)

Please let us know if you have any additional questions.

Thanks.

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this

communication is confidential, may be attorney-client privileged or attorney work product,

may constitute inside information or internal deliberative staff communication, and is

intended only for the use of the addressee. Unauthorized use, disclosure or copying of this

communication or any part thereof is strictly prohibited and may be unlawful. If you have

received this communication in error, please notify the sender immediately by return e-mail

and destroy this communication and all copies thereof, including all attachments. Receipt

by an unintended recipient does not waive attorney-client privilege, attorney work product

privilege, or any other exemption from disclosure.

From: Sydello, Justine

To: Phillips, Wayne L; Marchek, Kevin F

Cc: Cortez-Hun, Nicola G

Subject: RE: Conference Call with Rep. Parkhurst

Date: Monday, July 30, 2018 9:55:31 AM

Thanks,

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

69 W. Washington, Suite 2100

Chicago, IL 60602

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Phillips, Wayne L

Sent: Monday, July 30, 2018 9:52 AM

To: Sydello, Justine <Justine.Sydello@illinois.gov>; Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: FW: Conference Call with Rep. Parkhurst

Just an FYI……

I will keep you updated.

From: Phillips, Wayne L

Sent: Monday, July 30, 2018 6:43 AM

To: 'Krolik, Justin' <JKrolik@hrs.ilga.gov>; Wheeler, Andrew <awheeler@k3county.net>

Subject: RE: Conference Call with Rep. Parkhurst

I will make August 2nd work in my schedule.

What time?

From: Krolik, Justin [mailto:JKrolik@hrs.ilga.gov]

Sent: Friday, July 27, 2018 8:50 PM

To: Wheeler, Andrew <awheeler@k3county.net>; Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] RE: Conference Call with Rep. Parkhurst

That is not a problem. Would sometime on August 2nd work?

From: Wheeler, Andrew [mailto:awheeler@k3county.net] Sent: Friday, July 27, 2018 3:33 PM

To: Krolik, Justin; Phillips, Wayne LSubject: RE: Conference Call with Rep. Parkhurst

I already have a noon to 3:30 pm meeting, so it would have to be earlier, after 3:30 or another day.

Let me know, and thanks!

Andy

From: Krolik, Justin <JKrolik@hrs.ilga.gov>

Sent: Friday, July 27, 2018 10:31 AM

To: awheeler@k3county.net; Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: Conference Call with Rep. Parkhurst

Good morning,

Representative Parkhurst would like to schedule a conference call to discuss a traffic signal on

Armour Rd at the CSL Behring entrance. If possible, Tuesday, July 31 at 12pm would be ideal. If that

date and time does not work, the Representative is flexible on Thursday, August 2nd.

Thank you,

Justin Krolik | Communications Analyst

Illinois General Assembly | Office of the House Republican Leader

Office (815) 523-7779

Email jkrolik@hrs.ilga.gov | Find us everywhere at ilhousegop.org

This electronic mail transmission may contain confidential or privileged information. If youbelieve that you have received this message in error, please notify the sender by replytransmission and delete the message without copying or disclosing it.

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Ballerini, Richard A

To: Michael Gingerich; Phillips, Wayne L

Subject: RE: CSL - Route 50 - Temporary Access

Date: Tuesday, May 08, 2018 10:49:33 AM

Mike, if you can just send a formal letter requesting a temporary access along with a detailed sketch.

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Tuesday, May 08, 2018 10:19 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Ballerini, Richard A

<Richard.Ballerini@illinois.gov>

Subject: [External] CSL - Route 50 - Temporary Access

Hi Wayne and Richard

Thank you for taking time to assemble at meeting at your office. In addition to the pending

application by CSL for two new accesses and the removal of one access to IL Route 50, we

discussed requesting a temporary access and requesting a letter of feasibility.

I did not find a specific form for requesting a temporary access and found a few forms that

might fit the request. Does District 3 have a preferred form for requesting a temporary

access?

I have not in the past requested a letter of feasibility for highway access. Do you have a

preferred format or example for that request.

Thank you for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Subject: RE: CSL Armour Road Access - RR Bridge Reconstruction

Date: Friday, April 12, 2019 12:51:00 PM

Mike,

The Armour Road bridge will reconstructed under stage construction (it will remain open to traffic).

Wayne

From: Michael Gingerich <MGing@mg2a.com>

Sent: Friday, April 12, 2019 12:11 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] CSL Armour Road Access - RR Bridge Reconstruction

Hi Wayne

Thank you and your team for your time and graciousness yesterday.

I was asked if the RR bridge west of CSL on Armour Road is going to be closed or remain

open to traffic during the rebuild. I would guess it would remain open but wanted to double

check.

Sorry, I am sure there is somebody else I could ask but I’m drawing a blank.

Thanks.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

F <Kevin.Marchek@illinois.gov>; Decker, Jessie R.

<Jessie.Decker@illinois.gov>

Subject: RE: CSL Behring and IL 50

From: Osman, Omer M

Sent: Monday, April 08, 2019 4:53 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Phillips, Wayne

L <Wayne.Phillips@illinois.gov>

Cc: Loete, Paul A. <Paul.Loete@Illinois.gov>; Marchek, Kevin

F <Kevin.Marchek@illinois.gov>; Decker, Jessie R.

<Jessie.Decker@illinois.gov>

Subject: Re: CSL Behring and IL 50

Sent from my iPhone

On Apr 8, 2019, at 4:50 PM, Tridgell, Guy

<Guy.Tridgell@illinois.gov> wrote:

   

From: Osman, Omer M

Sent: Monday, April 8, 2019 4:18 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: Fwd: CSL Behring and IL 50

7(1)(f)

7(1)(f)

Sent from my iPhone

Begin forwarded message:

From: "Phillips, Wayne L"

<Wayne.Phillips@illinois.gov>

Date: April 8, 2019 at 4:02:34 PM

CDT

To: "Osman, Omer M"

<Omer.Osman@illinois.gov>

Cc: "Marchek, Kevin F"

<Kevin.Marchek@illinois.gov>,

"Decker, Jessie R."

<Jessie.Decker@illinois.gov>,

"Wielgopolan, Julie A"

<Julie.Wielgopolan@illinois.gov>,

"Loete, Paul A."

<Paul.Loete@Illinois.gov>

Subject: CSL Behring and IL 50

Omer,

7(1)(f)

Sincerely,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois -

CONFIDENTIALITY NOTICE: The

information contained in this

communication is confidential, may

be attorney-client privileged or

attorney work product, may

constitute inside information or

internal deliberative staff

communication, and is intended

only for the use of the addressee.

Unauthorized use, disclosure or

copying of this communication or

any part thereof is strictly prohibited

and may be unlawful. If you have

received this communication in

error, please notify the sender

immediately by return e-mail and

destroy this communication and all

copies thereof, including all

attachments. Receipt by an

unintended recipient does not waive

attorney-client privilege, attorney

work product privilege, or any other

exemption from disclosure.

Cc: Loete, Paul A. <Paul.Loete@Illinois.gov>; Marchek, Kevin F

<Kevin.Marchek@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>

Subject: RE: CSL Behring and IL 50

From: Phillips, Wayne L

Sent: Monday, April 8, 2019 5:01 PM

To: Osman, Omer M <Omer.Osman@illinois.gov>; Tridgell, Guy

<Guy.Tridgell@illinois.gov>

Cc: Loete, Paul A. <Paul.Loete@Illinois.gov>; Marchek, Kevin F

<Kevin.Marchek@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>

Subject: RE: CSL Behring and IL 50

From: Osman, Omer M

Sent: Monday, April 08, 2019 4:53 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Phillips, Wayne L

<Wayne.Phillips@illinois.gov>

Cc: Loete, Paul A. <Paul.Loete@Illinois.gov>; Marchek, Kevin F

<Kevin.Marchek@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>

Subject: Re: CSL Behring and IL 50

Sent from my iPhone

On Apr 8, 2019, at 4:50 PM, Tridgell, Guy <Guy.Tridgell@illinois.gov> wrote:

7(1)(f)

7(1)(f)

7(1)(f)

   

From: Osman, Omer M

Sent: Monday, April 8, 2019 4:18 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: Fwd: CSL Behring and IL 50

Sent from my iPhone

Begin forwarded message:

From: "Phillips, Wayne L" <Wayne.Phillips@illinois.gov>

Date: April 8, 2019 at 4:02:34 PM CDT

To: "Osman, Omer M" <Omer.Osman@illinois.gov>

Cc: "Marchek, Kevin F" <Kevin.Marchek@illinois.gov>,

"Decker, Jessie R." <Jessie.Decker@illinois.gov>,

"Wielgopolan, Julie A" <Julie.Wielgopolan@illinois.gov>,

"Loete, Paul A." <Paul.Loete@Illinois.gov>

Subject: CSL Behring and IL 50

Omer,

7(1)(f)

Please let me know if you have any further questions.

Sincerely,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information

contained in this communication is confidential, may be

attorney-client privileged or attorney work product, may

constitute inside information or internal deliberative staff

communication, and is intended only for the use of the

addressee. Unauthorized use, disclosure or copying of this

communication or any part thereof is strictly prohibited and may

be unlawful. If you have received this communication in error,

please notify the sender immediately by return e-mail and

destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not

waive attorney-client privilege, attorney work product privilege,

or any other exemption from disclosure.

From: Marchek, Kevin F

To: Tridgell, Guy; Osman, Omer M; Loete, Paul A.

Cc: Decker, Jessie R.; Phillips, Wayne L

Subject: RE: CSL Behring and IL 50

Date: Monday, April 08, 2019 4:59:09 PM

Guy,

Thanks,

Kevin Marchek

Region 2 Engineer

Illinois Department of Transportation

From: Tridgell, Guy

Sent: Monday, April 8, 2019 4:51 PM

To: Osman, Omer M <Omer.Osman@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>;

Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Cc: Decker, Jessie R. <Jessie.Decker@illinois.gov>

Subject: FW: CSL Behring and IL 50

   

From: Osman, Omer M

Sent: Monday, April 8, 2019 4:18 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: Fwd: CSL Behring and IL 50

Sent from my iPhone

Begin forwarded message:

From: "Phillips, Wayne L" <Wayne.Phillips@illinois.gov>

Date: April 8, 2019 at 4:02:34 PM CDT

7(1)(f)

From: Loete, Paul A.

To: Tridgell, Guy

Cc: Marchek, Kevin F; Osman, Omer M; Decker, Jessie R.; Phillips, Wayne L

Subject: Re: CSL Behring and IL 50

Date: Monday, April 08, 2019 5:16:58 PM

Paul A. LoeteIllinois DOT217.782.2151

On Apr 8, 2019, at 5:00 PM, Tridgell, Guy <Guy.Tridgell@illinois.gov> wrote:

Thanks, Kevin.

From: Marchek, Kevin F

Sent: Monday, April 8, 2019 4:59 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Osman, Omer M

<Omer.Osman@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>

Cc: Decker, Jessie R. <Jessie.Decker@illinois.gov>; Phillips, Wayne L

<Wayne.Phillips@illinois.gov>

Subject: RE: CSL Behring and IL 50

Guy,

Thanks,

Kevin Marchek

Region 2 Engineer

Illinois Department of Transportation

From: Tridgell, Guy

Sent: Monday, April 8, 2019 4:51 PM

To: Osman, Omer M <Omer.Osman@illinois.gov>; Loete, Paul A.

<Paul.Loete@Illinois.gov>; Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Cc: Decker, Jessie R. <Jessie.Decker@illinois.gov>

Subject: FW: CSL Behring and IL 50

7(1)(f)

7(1)(f)

   

From: Osman, Omer M

Sent: Monday, April 8, 2019 4:18 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: Fwd: CSL Behring and IL 50

Sent from my iPhone

Begin forwarded message:

From: "Phillips, Wayne L" <Wayne.Phillips@illinois.gov>

Date: April 8, 2019 at 4:02:34 PM CDT

To: "Osman, Omer M" <Omer.Osman@illinois.gov>

Cc: "Marchek, Kevin F" <Kevin.Marchek@illinois.gov>, "Decker, Jessie R."

<Jessie.Decker@illinois.gov>, "Wielgopolan, Julie A"

<Julie.Wielgopolan@illinois.gov>, "Loete, Paul A."

<Paul.Loete@Illinois.gov>

Subject: CSL Behring and IL 50

Omer,

7(1)(f)

Please let me know if you have any further questions.

Sincerely,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in

this communication is confidential, may be attorney-client privileged or

attorney work product, may constitute inside information or internal

deliberative staff communication, and is intended only for the use of the

addressee. Unauthorized use, disclosure or copying of this communication or

any part thereof is strictly prohibited and may be unlawful. If you have

received this communication in error, please notify the sender immediately by

return e-mail and destroy this communication and all copies thereof, including

all attachments. Receipt by an unintended recipient does not waive attorney-

client privilege, attorney work product privilege, or any other exemption from

disclosure.

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: Re: CSL Behring and IL 50

So Wayne

Sent from my iPhone

On Apr 8, 2019, at 4:02 PM, Phillips, Wayne L <Wayne.Phillips@illinois.gov> wrote:

Omer,

disclosure.

From: Phillips, Wayne L

To: Tridgell, Guy; Osman, Omer M; Loete, Paul A.; Marchek, Kevin F; Decker, Jessie R.

Subject: RE: CSL Behring and IL 50

Date: Thursday, April 11, 2019 3:16:00 PM

Attachments: L-16410 AS SENT 2019-04-11.pdf

All –

Wayne

From: Phillips, Wayne L

Sent: Monday, April 08, 2019 5:50 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Cc: Osman, Omer M <Omer.Osman@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>;

Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>

Subject: RE: CSL Behring and IL 50

From: Tridgell, Guy

Sent: Monday, April 08, 2019 5:49 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Cc: Osman, Omer M <Omer.Osman@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>;

Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>

Subject: Re: CSL Behring and IL 50

Thanks, Wayne

Sent from my iPhone

On Apr 8, 2019, at 5:20 PM, Phillips, Wayne L <Wayne.Phillips@illinois.gov> wrote:

7(1

)(f)

From: Zemanek, Emily C.

To: Phillips, Wayne L

Subject: RE: CSL Behring IDS Submittal

Date: Monday, April 08, 2019 3:30:23 PM

From: Phillips, Wayne L

Sent: Monday, April 08, 2019 3:17 PM

To: Broviak, David E <David.Broviak@illinois.gov>; Ferguson, Scott A <Scott.Ferguson@illinois.gov>;

Zemanek, Emily C. <Emily.Zemanek@Illinois.gov>; Ballerini, Richard A

<Richard.Ballerini@illinois.gov>

Subject: RE: CSL Behring IDS Submittal

From: Phillips, Wayne L

Sent: Monday, April 08, 2019 2:59 PM

To: Broviak, David E <David.Broviak@illinois.gov>; Ferguson, Scott A <Scott.Ferguson@illinois.gov>;

Zemanek, Emily C. <Emily.Zemanek@Illinois.gov>; Ballerini, Richard A

<Richard.Ballerini@illinois.gov>

Subject: FW: CSL Behring IDS Submittal

From: Michael Gingerich <MGing@mg2a.com>

Sent: Monday, April 08, 2019 2:49 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] [WARNING: ATTACHMENT UNSCANNED]FW: CSL Behring IDS Submittal

Please let me know if you did not receive this transmittal. I will bring hard copies with me

Thursday if needed.

From: Daniel Brinkman <dbrinkman@gha-engineers.com>

Sent: Monday, March 25, 2019 3:25 PM

To: Michael Gingerich <MGing@mg2a.com>; Joel Greer <JGreer@mg2a.com>

Subject: CSL Behring IDS Submittal

Mike and Joel,

Find attached a copy of the CSL IDS submittal going to IDOT via overnight mail today. We

will get moving on the Armour IDS as well.

7(1)(f)

7(1)

(f)

7(1)(f)

Dan

--

Dan Brinkman, P.E.,PTOE

Assistant Director of Transportation Services

625 Forest Edge Drive | Vernon Hills, Illinois 60061

Office: (847) 478-9700 | Fax: (847) 478-9701

Direct: (847) 821-6222 | Email:dbrinkman@gha-engineers.comwww.gha-engineers.com

P Please consider the environment before printing this email.

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Subject: RE: CSL Behring IDS Submittal

Date: Monday, April 08, 2019 3:17:00 PM

No, we found the copies.

I never saw them.

From: Michael Gingerich <MGing@mg2a.com>

Sent: Monday, April 08, 2019 3:15 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] RE: CSL Behring IDS Submittal

Hi Wayne

It looks like it was delivered and signed for by D. Massey. Do you need me to print a

couple copies to bring with me Thursday?

Mike,

CSL IDS was sent overnight on 3/25. The feedback we got from FedEx includes the

following so it did arrive on 3/26 in Ottawa.

Tracking number: 774792261800

Status: Delivered: 03/26/2019 11:06 AM

Signed for By: D.MASSEY

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Monday, April 08, 2019 3:05 PM

To: Michael Gingerich <MGing@mg2a.com>

Subject: RE: CSL Behring IDS Submittal

I have not seen this transmittal.

From: Michael Gingerich <MGing@mg2a.com>

Sent: Monday, April 08, 2019 2:49 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] [WARNING: ATTACHMENT UNSCANNED]FW: CSL Behring IDS Submittal

Please let me know if you did not receive this transmittal. I will bring hard copies with me

Thursday if needed.

From: Daniel Brinkman <dbrinkman@gha-engineers.com>

Sent: Monday, March 25, 2019 3:25 PM

To: Michael Gingerich <MGing@mg2a.com>; Joel Greer <JGreer@mg2a.com>

Subject: CSL Behring IDS Submittal

Mike and Joel,

Find attached a copy of the CSL IDS submittal going to IDOT via overnight mail today. We

will get moving on the Armour IDS as well.

Dan

--

Dan Brinkman, P.E.,PTOE

Assistant Director of Transportation Services

625 Forest Edge Drive | Vernon Hills, Illinois 60061

Office: (847) 478-9700 | Fax: (847) 478-9701

Direct: (847) 821-6222 | Email:dbrinkman@gha-engineers.comwww.gha-engineers.com

P Please consider the environment before printing this email.

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Cc: Marchek, Kevin F

Subject: RE: CSL Behring IDS Submittal

Date: Monday, April 08, 2019 3:12:00 PM

We received it March 26th.

Unfortunately it has not been reviewed.

It will get started immediately.

My apologies.

From: Michael Gingerich <MGing@mg2a.com>

Sent: Monday, April 08, 2019 2:49 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] [WARNING: ATTACHMENT UNSCANNED]FW: CSL Behring IDS Submittal

Please let me know if you did not receive this transmittal. I will bring hard copies with me

Thursday if needed.

From: Daniel Brinkman <dbrinkman@gha-engineers.com>

Sent: Monday, March 25, 2019 3:25 PM

To: Michael Gingerich <MGing@mg2a.com>; Joel Greer <JGreer@mg2a.com>

Subject: CSL Behring IDS Submittal

Mike and Joel,

Find attached a copy of the CSL IDS submittal going to IDOT via overnight mail today. We

will get moving on the Armour IDS as well.

Dan

--

Dan Brinkman, P.E.,PTOE

Assistant Director of Transportation Services

625 Forest Edge Drive | Vernon Hills, Illinois 60061

Office: (847) 478-9700 | Fax: (847) 478-9701

Direct: (847) 821-6222 | Email:dbrinkman@gha-engineers.comwww.gha-engineers.com

P Please consider the environment before printing this email.

From: Ferguson, Scott A

To: Phillips, Wayne L

Subject: RE: CSL Behring IDS Submittal

Date: Monday, April 08, 2019 3:11:56 PM

From: Phillips, Wayne L

Sent: Monday, April 08, 2019 2:59 PM

To: Broviak, David E <David.Broviak@illinois.gov>; Ferguson, Scott A <Scott.Ferguson@illinois.gov>;

Zemanek, Emily C. <Emily.Zemanek@Illinois.gov>; Ballerini, Richard A

<Richard.Ballerini@illinois.gov>

Subject: FW: CSL Behring IDS Submittal

From: Michael Gingerich <MGing@mg2a.com>

Sent: Monday, April 08, 2019 2:49 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] [WARNING: ATTACHMENT UNSCANNED]FW: CSL Behring IDS Submittal

Please let me know if you did not receive this transmittal. I will bring hard copies with me

Thursday if needed.

From: Daniel Brinkman <dbrinkman@gha-engineers.com>

Sent: Monday, March 25, 2019 3:25 PM

To: Michael Gingerich <MGing@mg2a.com>; Joel Greer <JGreer@mg2a.com>

Subject: CSL Behring IDS Submittal

Mike and Joel,

Find attached a copy of the CSL IDS submittal going to IDOT via overnight mail today. We

will get moving on the Armour IDS as well.

Dan

--

Dan Brinkman, P.E.,PTOE

Assistant Director of Transportation Services

625 Forest Edge Drive | Vernon Hills, Illinois 60061

Office: (847) 478-9700 | Fax: (847) 478-9701

Direct: (847) 821-6222 | Email:dbrinkman@gha-engineers.com

7(1)(f)

7(1)(f)

www.gha-engineers.com

P Please consider the environment before printing this email.

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Cc: DOT.D3 Permits

Subject: RE: CSL Behring IDS Submittal

Date: Monday, April 08, 2019 4:55:00 PM

Mike,

My quick look (just now) at the March 26, 2019 submittal does not include hydraulic/ drainage

calculations, etc.

Can you please send them to me (and Permits) ASAP to keep this process moving forward?

Thank you,

Wayne

From: Michael Gingerich <MGing@mg2a.com>

Sent: Monday, April 08, 2019 3:17 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] RE: CSL Behring IDS Submittal

Ok – no need to respond to my email with the tracking number. No need to apologize. We

will just work to get the plan completed and approved. Thank you for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Monday, April 08, 2019 3:13 PM

To: Michael Gingerich <MGing@mg2a.com>

Cc: Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: RE: CSL Behring IDS Submittal

We received it March 26th.

Unfortunately it has not been reviewed.

It will get started immediately.

My apologies.

From: Michael Gingerich <MGing@mg2a.com>

Sent: Monday, April 08, 2019 2:49 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] [WARNING: ATTACHMENT UNSCANNED]FW: CSL Behring IDS Submittal

Please let me know if you did not receive this transmittal. I will bring hard copies with me

Thursday if needed.

From: Daniel Brinkman <dbrinkman@gha-engineers.com>

Sent: Monday, March 25, 2019 3:25 PM

To: Michael Gingerich <MGing@mg2a.com>; Joel Greer <JGreer@mg2a.com>

Subject: CSL Behring IDS Submittal

Mike and Joel,

Find attached a copy of the CSL IDS submittal going to IDOT via overnight mail today. We

will get moving on the Armour IDS as well.

Dan

--

Dan Brinkman, P.E.,PTOE

Assistant Director of Transportation Services

625 Forest Edge Drive | Vernon Hills, Illinois 60061

Office: (847) 478-9700 | Fax: (847) 478-9701

Direct: (847) 821-6222 | Email:dbrinkman@gha-engineers.comwww.gha-engineers.com

P Please consider the environment before printing this email.

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Sydello, Justine

Cc: Loete, Paul A.; Osman, Omer M; Aleman, Erin L; Marchek, Kevin F

Subject: RE: CSL Information and Update

Date: Wednesday, August 15, 2018 7:26:00 AM

All –

If you wish to hold a conference call prior to the 23rd, please let me know.

Wayne

From: Sydello, Justine

Sent: Tuesday, August 14, 2018 6:34 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Cc: Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer M <Omer.Osman@illinois.gov>; Aleman,

We will keep you informed as we learn more.

Wayne

From: Sydello, Justine

Sent: Thursday, July 05, 2018 10:56 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Marchek, Kevin F

<Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer

M <Omer.Osman@illinois.gov>

Cc: Aleman, Erin L <Erin.Aleman@illinois.gov>

Subject: RE: CSL Information and Update

Thanks, Wayne.

Thanks!

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

69 W. Washington, Suite 2100

Chicago, IL 60602

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Phillips, Wayne L

Sent: Monday, July 2, 2018 2:59 PM

To: Sydello, Justine <Justine.Sydello@illinois.gov>; Marchek, Kevin F

<Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer

M <Omer.Osman@illinois.gov>

Cc: Aleman, Erin L <Erin.Aleman@illinois.gov>

Subject: RE: CSL Information and Update

From: Sydello, Justine

Sent: Friday, June 29, 2018 1:10 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Marchek, Kevin F

<Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer

M <Omer.Osman@illinois.gov>

Cc: Aleman, Erin L <Erin.Aleman@illinois.gov>

Subject: RE: CSL Information and Update

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

69 W. Washington, Suite 2100

Chicago, IL 60602

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Sydello, Justine

Sent: Friday, June 29, 2018 9:03 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Marchek, Kevin F

<Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer

M <Omer.Osman@illinois.gov>

Cc: Aleman, Erin L <Erin.Aleman@illinois.gov>

Subject: RE: CSL Information and Update

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

7(1)(f)

7(1)(f)

7(1)(f)

69 W. Washington, Suite 2100

Chicago, IL 60602

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Phillips, Wayne L

Sent: Friday, June 29, 2018 9:00 AM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Loete, Paul A.

<Paul.Loete@Illinois.gov>; Osman, Omer M <Omer.Osman@illinois.gov>; Sydello,

Justine <Justine.Sydello@illinois.gov>

Subject: CSL Information and Update

Kevin, Paul, Omer and Justine:

Have a good weekend!

Sincerely,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this

communication is confidential, may be attorney-client privileged or attorney work product,

may constitute inside information or internal deliberative staff communication, and is

intended only for the use of the addressee. Unauthorized use, disclosure or copying of this

communication or any part thereof is strictly prohibited and may be unlawful. If you have

received this communication in error, please notify the sender immediately by return e-mail

and destroy this communication and all copies thereof, including all attachments. Receipt

by an unintended recipient does not waive attorney-client privilege, attorney work product

privilege, or any other exemption from disclosure.

Cc: Aleman, Erin L <Erin.Aleman@illinois.gov>

Subject: RE: CSL Information and Update

From: Sydello, Justine

Sent: Friday, June 29, 2018 1:10 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Marchek, Kevin F <Kevin.Marchek@illinois.gov>;

Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer M <Omer.Osman@illinois.gov>

Cc: Aleman, Erin L <Erin.Aleman@illinois.gov>

Subject: RE: CSL Information and Update

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

69 W. Washington, Suite 2100

Chicago, IL 60602

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Sydello, Justine

Sent: Friday, June 29, 2018 9:03 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Marchek, Kevin F <Kevin.Marchek@illinois.gov>;

Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer M <Omer.Osman@illinois.gov>

Cc: Aleman, Erin L <Erin.Aleman@illinois.gov>

Subject: RE: CSL Information and Update

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

69 W. Washington, Suite 2100

Chicago, IL 60602

7(1)(f)

7(1)(f)

7(1)(f)

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Phillips, Wayne L

Sent: Friday, June 29, 2018 9:00 AM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>;

Osman, Omer M <Omer.Osman@illinois.gov>; Sydello, Justine <Justine.Sydello@illinois.gov>

Subject: CSL Information and Update

Kevin, Paul, Omer and Justine:

Have a good weekend!

Sincerely,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this

communication is confidential, may be attorney-client privileged or attorney work product,

may constitute inside information or internal deliberative staff communication, and is

intended only for the use of the addressee. Unauthorized use, disclosure or copying of this

communication or any part thereof is strictly prohibited and may be unlawful. If you have

received this communication in error, please notify the sender immediately by return e-mail

and destroy this communication and all copies thereof, including all attachments. Receipt

by an unintended recipient does not waive attorney-client privilege, attorney work product

privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Subject: RE: CSL meeting

Date: Thursday, July 12, 2018 9:17:00 AM

Mike,

Let’s go with August 23rd at 10 AM.

Where is a good location to have the meeting?

Wayne

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Wednesday, July 11, 2018 3:53 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] RE: CSL meeting

Hi Wayne –

August 22 or 23 at 10 a.m. work. Please confirm which so we can lock down the meeting

date and time

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Michael Gingerich

Sent: Wednesday, July 11, 2018 2:34 PM

To: 'Phillips, Wayne L' <Wayne.Phillips@illinois.gov>

Subject: RE: CSL meeting

Wayne,

I passed those dates for a mid-morning meeting on to Jessica Bartle’s (CSL). I will let you

know as soon as Jess gets back to me on a good date on your list for her and Chris Abel.

Great to hear from you. Is there anything I can do to help Jessica be best prepared for the

meeting?

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Wednesday, July 11, 2018 11:08 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: CSL meeting

Mike,

Following up from the confusing voicemail I left you this morning (I apologize).

I’d like your assistance with coordinating and participating in a meeting with CSL to discuss IL 50, IL

50 and Armor Road intersection, etc.

Looking at mine and Kevin Marchek’s (Regional Engineer) calendars for possible dates:

July 31

August 14, 15, 16, 21, 22 or 23

In order to fit Kevin’s drive from Dixon to Ottawa to Bourbonnais, I was thinking a 10 AM time frame.

Please let me know what (if any dates) work for you and CSL.

Thank you,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Subject: RE: CSL meeting

Date: Thursday, July 12, 2018 11:01:00 AM

I show July 23rd on my calendar.

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Thursday, July 12, 2018 10:53 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] RE: CSL meeting

Does “IDOT” have a meeting with Representative Parkhurst and towns in her district at

10:30 on August 23?

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Thursday, July 12, 2018 9:18 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: RE: CSL meeting

Mike,

Let’s go with August 23rd at 10 AM.

Where is a good location to have the meeting?

Wayne

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Wednesday, July 11, 2018 3:53 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] RE: CSL meeting

Hi Wayne –

August 22 or 23 at 10 a.m. work. Please confirm which so we can lock down the meeting

date and time

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Michael Gingerich

Sent: Wednesday, July 11, 2018 2:34 PM

To: 'Phillips, Wayne L' <Wayne.Phillips@illinois.gov>

Subject: RE: CSL meeting

Wayne,

I passed those dates for a mid-morning meeting on to Jessica Bartle’s (CSL). I will let you

know as soon as Jess gets back to me on a good date on your list for her and Chris Abel.

Great to hear from you. Is there anything I can do to help Jessica be best prepared for the

meeting?

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Wednesday, July 11, 2018 11:08 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: CSL meeting

Mike,

Following up from the confusing voicemail I left you this morning (I apologize).

I’d like your assistance with coordinating and participating in a meeting with CSL to discuss IL 50, IL

50 and Armor Road intersection, etc.

Looking at mine and Kevin Marchek’s (Regional Engineer) calendars for possible dates:

July 31

August 14, 15, 16, 21, 22 or 23

In order to fit Kevin’s drive from Dixon to Ottawa to Bourbonnais, I was thinking a 10 AM time frame.

Please let me know what (if any dates) work for you and CSL.

Thank you,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Subject: RE: CSL meeting

Date: Thursday, July 12, 2018 11:03:00 AM

Mike,

We both are hard people to get in contact with so I will try to put thoughts into type so please do

not be offended by my word choice.

I want this meeting to be a productive meeting.

I’d like to be able to get real dates and real numbers to take to Springfield and develop a rough plan

before the State of Illinois legislatures are contacted or anyone contacts the Secretary.

I am trying to secure the additional funding for upgrading the IL 50 – Armour Road intersection.

And trying to determine to what level/how extensive the upgrade needs to be based on the

proposed development and timeframe.

We would like to know:

dates on when ground is breaking for the next phases

number of temp employees (contractors)

number of CSL employees when completed

shift work? Approx.. start-quit times

entrance locations (vehicle and pedestrian)

it was mentioned a cross walk across IL 50 for lunch breaks?

Temporary vs permanent

As I think of more, I will let you know.

Thank you,

Wayne

From: Michael Gingerich [mailto:MGing@mg2a.com]

Sent: Wednesday, July 11, 2018 2:34 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: [External] RE: CSL meeting

Wayne,

I passed those dates for a mid-morning meeting on to Jessica Bartle’s (CSL). I will let you

know as soon as Jess gets back to me on a good date on your list for her and Chris Abel.

Great to hear from you. Is there anything I can do to help Jessica be best prepared for the

meeting?

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

From: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Sent: Wednesday, July 11, 2018 11:08 AM

To: Michael Gingerich <MGing@mg2a.com>

Subject: CSL meeting

Mike,

Following up from the confusing voicemail I left you this morning (I apologize).

I’d like your assistance with coordinating and participating in a meeting with CSL to discuss IL 50, IL

50 and Armor Road intersection, etc.

Looking at mine and Kevin Marchek’s (Regional Engineer) calendars for possible dates:

July 31

August 14, 15, 16, 21, 22 or 23

In order to fit Kevin’s drive from Dixon to Ottawa to Bourbonnais, I was thinking a 10 AM time frame.

Please let me know what (if any dates) work for you and CSL.

Thank you,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

3. Will CSL need to provide a bond for the intersection improvements? If

so, can we get that in motion or at least get an example in front of them?

It took CSL a long time to be able to process the bond for the temporary

access. I would like them to better understand the process.

Is there anything else other than getting the final plans to you that I can be

working on or we can be getting in front of the county or CSL?

One topic I would like to discuss at our meeting Thursday if possible is

drainage. Particularly, what information and supporting calculations are

needed. Do you have a particular check list you would like us to use?

Thanks for your help.

Mike Gingerich, Ph.D., P.E.

MG2A

815-939-4921

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this

communication is confidential, may be attorney-client privileged or attorney work product,

may constitute inside information or internal deliberative staff communication, and is

intended only for the use of the addressee. Unauthorized use, disclosure or copying of this

communication or any part thereof is strictly prohibited and may be unlawful. If you have

received this communication in error, please notify the sender immediately by return e-mail

and destroy this communication and all copies thereof, including all attachments. Receipt

by an unintended recipient does not waive attorney-client privilege, attorney work product

privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Michael Gingerich

Subject: Re: [External] CSL Main Employee and Secondary Truck Access, Route 50 south of Armour Road

Date: Tuesday, June 19, 2018 1:25:54 PM

Thank you Mike!I look forward to seeing you next week.

Sent from my iPhone

On Jun 19, 2018, at 11:46 AM, Michael Gingerich <MGing@mg2a.com> wrote:

Hi Wayne

CSL invited me to the governors appearance at their Kankakee plant. They aregoing to ask the Govenor to make their access plans a priority.

I will be asked to mention: (1) we will hand deliver the Traffic Study to District3s office on June 26. (2) CSLs desire to construct a multi-use path on the westside of Route 50. (3) CSL would like the state to take a look at their long rangeplan for the Route 50, Armour Road intersection.

This was a little last minute for me. I will mention our April 25 meeting and thegood support we have received from District 3.

I’ll stop by and say hi next week if you are available.

Mike Gingerich, P.E., Ph.D.MG2AC.815-693-0124O.815-939-4921

Sent: Monday, April 08, 2019 1:11 PM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Decker,

Jessie R. <Jessie.Decker@illinois.gov>; Wick, Joseph C

<Joseph.Wick@illinois.gov>

Cc: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: RE: [External] Traffic light issue

From: Marchek, Kevin F

Sent: Monday, April 08, 2019 10:59 AM

To: Decker, Jessie R. <Jessie.Decker@illinois.gov>; Wick,

Joseph C <Joseph.Wick@illinois.gov>

Cc: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Phillips, Wayne

L <Wayne.Phillips@illinois.gov>

Subject: RE: [External] Traffic light issue

Jessie,

Thanks,

Kevin Marchek

Region 2 Engineer

Illinois Department of Transportation

From: Decker, Jessie R.

Sent: Monday, April 8, 2019 9:06 AM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Wick,

Joseph C <Joseph.Wick@illinois.gov>

Cc: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: FW: [External] Traffic light issue

Good morning, Kevin and Joe—

Thanks,

Jessie

7(1)(f)

From: David <dgiuliani@daily-journal.com>

Sent: Monday, April 08, 2019 8:56 AM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Decker, Jessie

R. <Jessie.Decker@illinois.gov>; gianna.urgo@illinois.gov

Subject: [External] Traffic light issue

Hello,

My co-worker wrote a story last week about a request fora traffic light along Route 50 in Kankakee County. Hisstory follows. I was hoping to get the state Departmentof Transportation's side on this matter. There could bereasons for the length of the process, such as thecompany not responding to your department's initialreview in a timely manner.

If you could let me know who I should contact, thatwould be great. My number is 815-802-5144.

Thanks,

David Giuliani

Reporter

Daily Journal

Kankakee

BRADLEY — As CSL Behring waits for approval for its trafficsignal along Illinois Route 50, a company official clued areaofficials as to what is coming to this area as a result.

Carmagedon. That’s the word CSL site project managerChris Abell used to describe the traffic congestion the areawill face.

“Carmagedon is coming. I don’t know what else to call it,”he said.

CSL Behring is in the early phases of a 1.8 million-square-foot expansion which will easily require an investment farnorth of $1 billion.

Although employment projections have not been publicizedyet, there is speculation it could come close to doubling theexisting 1,600-member workforce.

The Australian-based pharmaceutical company has notasked for a penny of financial assistance or tax breaks from

any governmental body.

It has made one seemingly simple request. This request wasmade 16 months ago, and as of this week, it still has notbeen satisfied.

CSL wants a traffic light put at its pending new entrance atthe intersection at the Lowe’s Hardware store. The companyhas told the Illinois Department of Transportation it will payfor the stoplight.

Incredibly, a state thirsting for manufacturing developmenthas yet to OK what seems to be a simple request.

At the first-ever RESearch Kankakee County forum heldThursday in the former Sears store in the Northfield Squaremall, Abell, head of CSL’s project management office, saidhis frustration grows with each passing week.

Abell said CSL is making the largest investment anywhere inthe state and perhaps beyond and yet, their request cannotbe resolved.

“We can’t get a three-way light to become a four-way light.”

He later added:

“This is community supported. It is noncontroversial. Howdoes this take so long?” he asked.

Abell said CSL leadership recently visited the site, and theyalso were questioned why the light was not already in place.

“This is embarrassing,” he said. He said if this were NewYork and almost any other state, and a company wasmaking an investment like this, it would only be a matter ofa couple weeks for this to be granted.

“Is it worth someone’s time to advocate for us?” he asked.

Kankakee County Board Chairman Andy Wheeler said he’sbeen calling IDOT in Springfield, local state political leadersand anyone else he can think of to get the situationrectified.

“This is unbelievable. This is the largest manufacturinginvestment in the state. All that’s needed is a permit. Thestate of Illinois needs to get up and do this. It’s frustrating,”he said. “I don’t get it. This is not that hard.”

At least it shouldn’t be.

The company is developing a second entrance/exit at theplant. The current entrance is near the intersection of Route50 and Armour Road. The intersection is the mostcongested in the metro area and becomes a trafficnightmare at many points during the day.

Wheeler also noted he is working to get the intersectionproject on the state’s project list.

The Kankakee Area Transportation Study Metropolitan

Planning Organization recently moved this intersection tothe top of their preferred project list, in large part to aid theexpanding manufacturing plant.

-- David GiulianiReporterThe Daily JournalKankakee, Illinois815-802-5144daily-journal.comTwitter:@TDJ_dgiuliani

State of Illinois - CONFIDENTIALITY NOTICE: The information

contained in this communication is confidential, may be

attorney-client privileged or attorney work product, may

constitute inside information or internal deliberative staff

communication, and is intended only for the use of the

addressee. Unauthorized use, disclosure or copying of this

communication or any part thereof is strictly prohibited and may

be unlawful. If you have received this communication in error,

please notify the sender immediately by return e-mail and

destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not

waive attorney-client privilege, attorney work product privilege,

or any other exemption from disclosure.

From: Phillips, Wayne L

To: Marchek, Kevin F

Subject: RE: [External] Traffic light issue

Date: Monday, April 08, 2019 1:23:00 PM

From: Marchek, Kevin F

Sent: Monday, April 08, 2019 1:16 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: RE: [External] Traffic light issue

Kevin Marchek

Region 2 Engineer

Illinois Department of Transportation

From: Phillips, Wayne L

Sent: Monday, April 8, 2019 1:15 PM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: RE: [External] Traffic light issue

From: Marchek, Kevin F

Sent: Monday, April 08, 2019 1:13 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: RE: [External] Traffic light issue

Kevin Marchek

Region 2 Engineer

Illinois Department of Transportation

7(1)(f)

7(1)(f)

7(1)(f)

From: Phillips, Wayne L

Sent: Monday, April 8, 2019 1:11 PM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>;

Wick, Joseph C <Joseph.Wick@illinois.gov>

Cc: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: RE: [External] Traffic light issue

From: Marchek, Kevin F

Sent: Monday, April 08, 2019 10:59 AM

To: Decker, Jessie R. <Jessie.Decker@illinois.gov>; Wick, Joseph C <Joseph.Wick@illinois.gov>

Cc: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: RE: [External] Traffic light issue

Jessie,

Thanks,

Kevin Marchek

Region 2 Engineer

Illinois Department of Transportation

From: Decker, Jessie R.

Sent: Monday, April 8, 2019 9:06 AM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Wick, Joseph C <Joseph.Wick@illinois.gov>

Cc: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: FW: [External] Traffic light issue

Good morning, Kevin and Joe—

Thanks,

Jessie

From: David <dgiuliani@daily-journal.com>

Sent: Monday, April 08, 2019 8:56 AM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>;

gianna.urgo@illinois.gov

Subject: [External] Traffic light issue

7(1)(f)

Hello,

My co-worker wrote a story last week about a request for a traffic light along Route 50 inKankakee County. His story follows. I was hoping to get the state Department ofTransportation's side on this matter. There could be reasons for the length of the process, suchas the company not responding to your department's initial review in a timely manner.

If you could let me know who I should contact, that would be great. My number is 815-802-5144.

Thanks,

David Giuliani

Reporter

Daily Journal

Kankakee

BRADLEY — As CSL Behring waits for approval for its traffic signal along Illinois Route 50, acompany official clued area officials as to what is coming to this area as a result.

Carmagedon. That’s the word CSL site project manager Chris Abell used to describe the trafficcongestion the area will face.

“Carmagedon is coming. I don’t know what else to call it,” he said.

CSL Behring is in the early phases of a 1.8 million-square-foot expansion which will easily requirean investment far north of $1 billion.

Although employment projections have not been publicized yet, there is speculation it could comeclose to doubling the existing 1,600-member workforce.

The Australian-based pharmaceutical company has not asked for a penny of financial assistance ortax breaks from any governmental body.

It has made one seemingly simple request. This request was made 16 months ago, and as of thisweek, it still has not been satisfied.

CSL wants a traffic light put at its pending new entrance at the intersection at the Lowe’s Hardwarestore. The company has told the Illinois Department of Transportation it will pay for the stoplight.

Incredibly, a state thirsting for manufacturing development has yet to OK what seems to be asimple request.

At the first-ever RESearch Kankakee County forum held Thursday in the former Sears store in theNorthfield Square mall, Abell, head of CSL’s project management office, said his frustration growswith each passing week.

Abell said CSL is making the largest investment anywhere in the state and perhaps beyond and yet,

their request cannot be resolved.

“We can’t get a three-way light to become a four-way light.”

He later added:

“This is community supported. It is noncontroversial. How does this take so long?” he asked.

Abell said CSL leadership recently visited the site, and they also were questioned why the light wasnot already in place.

“This is embarrassing,” he said. He said if this were New York and almost any other state, and acompany was making an investment like this, it would only be a matter of a couple weeks for thisto be granted.

“Is it worth someone’s time to advocate for us?” he asked.

Kankakee County Board Chairman Andy Wheeler said he’s been calling IDOT in Springfield, localstate political leaders and anyone else he can think of to get the situation rectified.

“This is unbelievable. This is the largest manufacturing investment in the state. All that’s needed isa permit. The state of Illinois needs to get up and do this. It’s frustrating,” he said. “I don’t get it.This is not that hard.”

At least it shouldn’t be.

The company is developing a second entrance/exit at the plant. The current entrance is near theintersection of Route 50 and Armour Road. The intersection is the most congested in the metro areaand becomes a traffic nightmare at many points during the day.

Wheeler also noted he is working to get the intersection project on the state’s project list.

The Kankakee Area Transportation Study Metropolitan Planning Organization recently moved thisintersection to the top of their preferred project list, in large part to aid the expandingmanufacturing plant.

-- David GiulianiReporterThe Daily JournalKankakee, Illinois815-802-5144daily-journal.comTwitter:@TDJ_dgiuliani

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Marchek, Kevin F

To: Phillips, Wayne L

Subject: RE: [External] Traffic light issue

Date: Thursday, April 11, 2019 1:24:10 PM

Thank you!

Kevin Marchek

Region 2 Engineer

Illinois Department of Transportation

From: Phillips, Wayne L

Sent: Thursday, April 11, 2019 1:23 PM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: RE: [External] Traffic light issue

From: Marchek, Kevin F

Sent: Thursday, April 11, 2019 1:21 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Tridgell, Guy <Guy.Tridgell@illinois.gov>;

Decker, Jessie R. <Jessie.Decker@illinois.gov>

Subject: RE: [External] Traffic light issue

Thanks,

Kevin Marchek

Region 2 Engineer

Illinois Department of Transportation

From: Phillips, Wayne L

Sent: Thursday, April 11, 2019 1:15 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>;

Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: RE: [External] Traffic light issue

7(1)

(f)

7(1)(f)

7(1)

(f)

From: Tridgell, Guy

Sent: Thursday, April 11, 2019 1:13 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>;

Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: RE: [External] Traffic light issue

Thanks –

From: Phillips, Wayne L

Sent: Thursday, April 11, 2019 1:10 PM

To: Tridgell, Guy <Guy.Tridgell@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>;

Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: RE: [External] Traffic light issue

From: Tridgell, Guy

Sent: Thursday, April 11, 2019 12:58 PM

To: Decker, Jessie R. <Jessie.Decker@illinois.gov>; Phillips, Wayne L <Wayne.Phillips@illinois.gov>;

Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: RE: [External] Traffic light issue

Hi, Kevin/Wayne.

 

Thanks.

From: Phillips, Wayne L

Sent: Monday, April 08, 2019 1:11 PM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Decker, Jessie R. <Jessie.Decker@illinois.gov>;

Wick, Joseph C <Joseph.Wick@illinois.gov>

Cc: Tridgell, Guy <Guy.Tridgell@illinois.gov>

Subject: RE: [External] Traffic light issue

7(1)(f)

7(1)(f)

Thank you both very much for allowing me to attend today’s event!

Sincerely,

Wayne L. Phillips P.E.

Program Development Engineer

District 3

700 East Norris Drive

Ottawa, IL 61350

815-434-8450

Wayne.Phillips@illinois.gov

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in

this communication is confidential, may be attorney-client privileged or

attorney work product, may constitute inside information or internal

deliberative staff communication, and is intended only for the use of the

addressee. Unauthorized use, disclosure or copying of this communication or

any part thereof is strictly prohibited and may be unlawful. If you have

received this communication in error, please notify the sender immediately by

return e-mail and destroy this communication and all copies thereof, including

all attachments. Receipt by an unintended recipient does not waive attorney-

client privilege, attorney work product privilege, or any other exemption from

disclosure.

From: Tridgell, Guy

To: Phillips, Wayne L; Decker, Jessie R.

Cc: Marchek, Kevin F; Loete, Paul A.; Osman, Omer M

Subject: RE: Sen. Hutchison

Date: Monday, April 08, 2019 4:55:35 PM

Thanks for looping in Wayne.

From: Phillips, Wayne L

Sent: Monday, April 8, 2019 4:53 PM

To: Decker, Jessie R. <Jessie.Decker@illinois.gov>; Tridgell, Guy <Guy.Tridgell@illinois.gov>

Cc: Marchek, Kevin F <Kevin.Marchek@illinois.gov>; Loete, Paul A. <Paul.Loete@Illinois.gov>;

Osman, Omer M <Omer.Osman@illinois.gov>

Subject: FW: Sen. Hutchison

Jessie/Guy,

Wayne

From: Wielgopolan, Julie A

Sent: Monday, April 08, 2019 2:14 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: FW: Sen. Hutchison

Thanks

Julie

From: Williams, Kristin J.

Sent: Monday, April 08, 2019 2:07 PM

To: Wielgopolan, Julie A <Julie.Wielgopolan@illinois.gov>

Subject: Sen. Hutchison

Kristin Williams

Illinois Department of Transportation

Executive Assistant to Acting Secretary Osman

2300 S. Dirksen Parkway, Rm. 300

Springfield, IL 62764

217/782-6149

From: Bristow, Tamara <tbristow@senatedem.ilga.gov>

Sent: Monday, April 08, 2019 2:03 PM

To: Williams, Kristin J. <Kristin.Williams@illinois.gov>

Subject: [External] Please HELP!

Hi Kristin,

Please read below:

CSL Behring is in the early phases of a 1.8 million-square-foot expansion which will easily require an

investment far north of $1 billion.

Although employment projections have not been publicized yet, there is speculation it could come

close to doubling the existing 1,600-member workforce.

The Australian-based pharmaceutical company has not asked for a penny of financial assistance or

tax breaks from any governmental body.

It has made one seemingly simple request. This request was made 16 months ago, and as of this

week, it still has not been satisfied.

CSL wants a traffic light put at its pending new entrance at the intersection at the Lowe’s Hardware

store. The company has told the Illinois Department of Transportation it will pay for the stoplight.

Incredibly, a state thirsting for manufacturing development has yet to OK what seems to be a simple

request. […]

Abell said CSL is making the largest investment anywhere in the state and perhaps beyond and yet,

their request cannot be resolved.

“We can’t get a three-way light to become a four-way light.” […]

Kankakee County Board Chairman Andy Wheeler said he’s been calling IDOT in Springfield, local

state political leaders and anyone else he can think of to get the situation rectified.

Thanks,

Tammy Bristow

Legislative Assistant to

Senator Toi Hutchinson

State House, Room 108A

Springfield, IL 62706

217.782.7419

www.SenatorHutchinson.com

State of Illinois - CONFIDENTIALITY NOTICE: The information contained in this communication is

confidential, may be attorney-client privileged or attorney work product, may constitute inside information

or internal deliberative staff communication, and is intended only for the use of the addressee.

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited

and may be unlawful. If you have received this communication in error, please notify the sender

immediately by return e-mail and destroy this communication and all copies thereof, including all

attachments. Receipt by an unintended recipient does not waive attorney-client privilege, attorney work

product privilege, or any other exemption from disclosure.

From: Phillips, Wayne L

To: Sydello, Justine

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Date: Thursday, June 14, 2018 8:59:00 AM

Justine,

Wayne

From: Sydello, Justine

Sent: Thursday, June 14, 2018 8:51 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Thanks,

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

69 W. Washington, Suite 2100

Chicago, IL 60602

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Phillips, Wayne L

Sent: Thursday, June 14, 2018 8:32 AM

To: Sydello, Justine <Justine.Sydello@illinois.gov>

Subject: FW: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Justine,

7(1)(f)

Wayne

From: Marchek, Kevin F

Sent: Thursday, June 14, 2018 7:51 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: Re: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Sent from my iPhone

On Jun 14, 2018, at 7:14 AM, Phillips, Wayne L <Wayne.Phillips@illinois.gov> wrote:

From: Marchek, Kevin F

Sent: Monday, June 11, 2018 1:07 PM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Thank you!

Kevin Marchek, P.E.

Region Two Engineer

P Please consider the environment before printing this e-mail.

From: Phillips, Wayne L

Sent: Monday, June 11, 2018 11:58 AM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

7(1)(f)

7(1)(f)

7(1)(f)

From: Marchek, Kevin F

Sent: Monday, June 11, 2018 11:49 AM

To: Phillips, Wayne L <Wayne.Phillips@illinois.gov>

Subject: FW: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Wayne,

Kevin Marchek, P.E.

Region Two Engineer

P Please consider the environment before printing this e-mail.

From: Sydello, Justine

Sent: Monday, June 11, 2018 11:44 AM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Cc: Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer M

<Omer.Osman@illinois.gov>

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Thanks.

Thanks!

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

69 W. Washington, Suite 2100

Chicago, IL 60602

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Marchek, Kevin F

Sent: Monday, June 11, 2018 11:41 AM

To: Sydello, Justine <Justine.Sydello@illinois.gov>

Cc: Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer M

<Omer.Osman@illinois.gov>

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Justine,

Thanks,

Kevin Marchek, P.E.

Region Two Engineer

P Please consider the environment before printing this e-mail.

From: Sydello, Justine

Sent: Monday, June 11, 2018 11:19 AM

To: Marchek, Kevin F <Kevin.Marchek@illinois.gov>

Cc: Loete, Paul A. <Paul.Loete@Illinois.gov>; Osman, Omer M

<Omer.Osman@illinois.gov>

Subject: FW: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Kevin,

Thanks,

Justine Sydello

Deputy Secretary

Illinois Department of Transportation, Office of the Secretary

69 W. Washington, Suite 2100

Chicago, IL 60602

312-793-2530 (o)

312-636-0835 (c)

312-793-1164 (f)

Justine.Sydello@illinois.gov

From: Ladd, Brittany J.

Sent: Monday, June 11, 2018 10:28 AM

To: Williams, Kristin J. <Kristin.Williams@illinois.gov>; Sydello, Justine

<Justine.Sydello@illinois.gov>

Cc: Perkins, Andrew <Andrew.Perkins@illinois.gov>; Kamykowski, Molly

<Molly.Kamykowski@illinois.gov>; Tridgell, Guy <Guy.Tridgell@illinois.gov>; Wilson,

Nicole J. <Nicole.J.Wilson@illinois.gov>

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

IDOT team –

Thanks!

Brittany

Brittany J. Ladd

Deputy Chief of Staff for External Relations

Office of Governor Bruce Rauner

p. 312.814.4550

From: Williams, Kristin J.

Sent: Friday, April 27, 2018 12:52 PM

To: Ladd, Brittany J. <Brittany.J.Ladd@illinois.gov>

Cc: Sydello, Justine <Justine.Sydello@illinois.gov>; Perkins, Andrew

<Andrew.Perkins@illinois.gov>; Kamykowski, Molly <Molly.Kamykowski@illinois.gov>

Subject: Re: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

On Apr 27, 2018, at 12:44 PM, Ladd, Brittany J. <Brittany.J.Ladd@illinois.gov> wrote:

Kristin –

Thanks!

Brittany J. Ladd

Deputy Chief of Staff for External Relations

Office of Governor Bruce Rauner

p. 312.814.4550

From: Williams, Kristin J.

Sent: Friday, April 27, 2018 10:33 AM

To: Ladd, Brittany J. <Brittany.J.Ladd@illinois.gov>; Sydello, Justine

<Justine.Sydello@illinois.gov>

Cc: Perkins, Andrew <Andrew.Perkins@illinois.gov>; Kamykowski, Molly

<Molly.Kamykowski@illinois.gov>

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Brittany, thank you -

7(1)(f)

Kristin Williams

Executive Assistant to Secretary Blankenhorn

Illinois Department of Transportation

2300 S. Dirksen Parkway, Rm. 300

Springfield, IL 62764

217/782-6149

From: Ladd, Brittany J.

Sent: Friday, April 27, 2018 10:29 AM

To: Williams, Kristin J. <Kristin.Williams@illinois.gov>; Sydello, Justine

<Justine.Sydello@illinois.gov>

Cc: Perkins, Andrew <Andrew.Perkins@illinois.gov>; Kamykowski, Molly

<Molly.Kamykowski@illinois.gov>

Subject: RE: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Article is {actually} attached here: http://www.daily-

journal.com/news/local/csl-unveils-huge-expansion/article e4131bea-

3d94-11e8-9ea5-d39a6329122b.html.

Brittany J. Ladd

Deputy Chief of Staff for External Relations

Office of Governor Bruce Rauner

p. 312.814.4550

From: Ladd, Brittany J.

Sent: Friday, April 27, 2018 10:28 AM

To: Williams, Kristin J. <Kristin.Williams@illinois.gov>; Sydello, Justine

<Justine.Sydello@illinois.gov>

Cc: Perkins, Andrew <Andrew.Perkins@illinois.gov>; Molly Kamykowski

(Molly.Kamykowski@illinois.gov) <Molly.Kamykowski@illinois.gov>

Subject: Visit to CSL Behring with Gov/Leader Durkin/Rep Parkhurst

Kristin and Justine –

7(1)(f)

From: Phillips, Wayne L

To: Michael Gingerich

Subject: CSL

Date: Thursday, July 26, 2018 9:38:00 AM

Attachments: Scan from P494MX0149329.pdf

Mike,

Please find attached the District's review of TIS. A hardcopy will be in the mail.

Do you believe it would be beneficial for you and I to meet prior to the scheduled meeting on August 23rd?

I'd be happy to meet at your office to hear and see what you/MG2A/CSL are proposing and look at the site together.

But I do not know what your timeframe and contract is like with CSL and I do not want to inconvenience you.

I am big on making meetings as productive as possible and if we can work out details beforehand the better we can

steer the meeting and future project.

Just let me know,

Wayne