Future Trial Theme 1 – COBie to FM
How do we efficiently integrate COBie outputs with FM inputs?
Why is this important?
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%~£16bn ~£14bn ~£8bn ~ £4.5bn ~£4bn
Renewables and Energy Efficiency Transport Energy Social Water & Waste
Smart metering £0.8bn (~20%)
OFTO £0.6bn (~20%)
Renewables and Energy Efficiency £14.5bn (~14%)
Ports £0.6bn (~5%)
Airports £1.2bn (~5%)
Rail £5.0bn (~14%)
Roads £6.9bn (~13%)
Nuclear £1.0bn
Onshore Transmission £3.0bn (~8%)
Gas £3.6bn (~20%)
Social £2.3bn
(Housing, education,
health, justice)
Local Authorities
£2.2bn (~20%)
Waste £0.3bn (~3%)
Water £3.4bn (~5%)
Source: KPMG analysis
2016 Public Sector Pipeline £45bn
Client
Architect QS Design
Engineer
Project
Manager
Main Contractors
Sub-contractors
Building product manufacturer
Sub-contractors Sub-contractors Sub-contractors
Building product distributor
Global and local commodities
If construction grows at the expected rate,
we will be over capacity! How will you
manage us?
What is COBie?
What is COBie?
BS 1192? SHARED? No way!
Sorry it’s %15 more expensive
The EIR said we have to do it all!
THE CHALLENGE - SUPPLY CHAIN INTEGRATION & COLLABORATION
FM Provider
Data in a format we can
understand Please!
WHERE IS MY COBie?!
WHAT DO OPERATORS REALLY NEED?
DESIGN
Data Drop 1-2 Data Drop 6
GRAPHICS
GRAPHICS GRAPHICS
DATA
DATA DATA
CONSTRUCT OPERATE
Data Drop 3-5
BIM – FM INTEGRATION
FM Software integration according to maturity levels (BIM Task Group, 2011)
What do we want the trial to address?
• Joined up using the same interoperable format(s)
• Manufacturers to come to the table and produce their product data sheets to a consistent standard (data first geometry second)
• Enable consistency in how equipment and assets are classified
• More input from FM provider to support the Employers Information Requirements (EIR)
• Supply chain Integration for data capture - Drops 3 - 6 are critical
• Include Customers to enable greater understanding - better education for industry as a whole
• Review means for less contractual thinking and more robust channels of communication
AREAS OF FOCUS
IFC is a gateway to the data – can’t ignore everything that happens around it
IFC Industry joined up
Manufacturers data sets /
CIBSE PDT’s
Classification system
FM Providers contribution
Clients and customers
understanding
Collaboration – less
contractual
CAFM – Computer Aided Facilities Management System
CAFM
Planned Preventative Maintenance
Asset Condition
Fault rectification
& History
Asset Performance
Whole Life Cycle
Statutory Compliance
How do we use the data once transferred into CAFM system?
• Use the Energy model pre and post construction to inform maintenance options
• Easier identification of assets and gain faster mobilisation underpinned by Statutory and Business compliance
• Obtain data and opportunities for different methods of maintaining and managing Assets
• Identify critical systems, plant & equipment together with critical spares very early on
• A fully developed maintenance strategy to handover to a client prior to the operational phase
• Be able to provide information on best in class assets and inform on whole life cycle costs
• Be more competitive with our bids based on knowledge and accurate data
BENEFITS OF BIM IN FM - LOWER COST / CARBON
Designers
Contractors
FM Providers
O & M
Energy Performance
Critical Assets
Manufacturers
Supply Chain
To summarise all stakeholders have a key part to play
OPEN COLLABORATION
CASE STUDY: UNIVERSITY OF EDINBURGH HOLYROOD STUDENT CAMPUS
THE PROJECT DELIVERY TEAM
OWNER FM PROVIDER END USER
DESIGN & CONSTRUCTION
SUBCONTRACTOR
North Site
South Site
MODEL DEVELOPMENT
CLASSIFICATION STANDARD
DEFINED OBJECT TEMPLATES
COMPONENT TRACKING
Main Asset
Details
Attributes
Maintainable
Assets
Sub assets
Maintainable
Unit
MANUFACTURERS DATA
DATA EXPORT TOOL TO COBie OUTPUT
DATA EXPORT COBie SPREADSHEET
COBie SPREADSHEET FILE MAXIMO MAXIMO INPUT SCRIPTS
COBie SPREADSHEET TO MAXIMO RECONCILIATION PROCESS (THE LONG ROUTE)
MAINTENANCE PLAN WORK ORDER REPORT PPM WORK ORDER
MAXIMO TO RAISED WORK ORDER
EMPLOYERS INFORMATION
REQUIREMENTS (EIR)
BUILDING EXECUTION PLAN (BEP)
SCHEMA (e.g. COBie)
LEVEL OF DEVELOPMENT (LOD)
DATA REQUIREMENTS DATABASE SYSTEM
DELIVERABLES
INFORMATION MODEL
DATABASE
GRAPHICAL DATA
INFORMATION MODEL
NON-GRAPHICAL DATA
FACILITIES MAINTENANCE
FACILITIES MAINTENANCE SYSTEM
SYNCHRONIZE
INFORMATION & DATA FLOW
CLASSIFICATION (Uniclass 2)
Thank you