gdot’s complete street policy...• restripe school zones, roadways, bike lanes, crosswalks,...

Post on 23-Jun-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

GDOT’s complete Street Policy

GA 400 & I-285 Interchange: A Design Build Finance Project

12’ paved surface with 2’ unobstructed shoulders (grass) on either side with a chain link fence

Connects Local and Regional multiuse path and provide connectivity thru the interchange

Includes Shared-Use Path: Funded by 400PATH , GDOT & City of Sandy Spring

Safe Routes to Schools at Various Locations

Design-Build Project: low cost solution & expedited delivery

General Scope Items

• Connect intermittent sidewalks along roadways near schools

• Upgrade wheelchair ramps and pedestrian signals

• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc.

• Widen existing bridge to accommodate a sidewalk

• Including other innovative pavement markings and devices

Solar Powered Signs

Radar Speed Signs

Rectangular Rapid Flashing Beacons

Raised Crosswalks / Speed Tables

Before Projects:

GDOT’s Proposed Solution: Semi Protected 2-Way Cycle Path

After public involvement….

Atlanta BeltLine Project

Atlanta BeltLine Project

The Atlanta BeltLine is:

A planned loop of 22 miles of modern streetcar

33 miles of multi-use trails

2,000 acres of parks

connect 45 intown neighborhoods

Public art

Historic preservation

Partnerships that Provide Possibilities

top related