GENERAL MANAGER –INCHARGE PSSR VISIT TO 2X500W NTPL SITE,TUTICORIN DT:14.06.2013. A WARM WELCOME BY TUTICORIN SITE TO G M-IC,PSSR. GM-IC CHAT WITH GM, TUTICORIN & NEYVELI. - PowerPoint PPT Presentation

TRANSCRIPT

GENERAL MANAGER –INCHARGE

PSSR

VISIT TO

2X500W NTPL SITE,TUTICORIN

DT:14.06.2013

A WARM WELCOME BY TUTICORIN SITE TO GM-IC,PSSR

GM-IC CHAT WITH GM, TUTICORIN & NEYVELI

Shri.Durai Raj,Sr.Mgr/Boiler commg,distributing sweets for successful completion of Steam blowing activity

Reviewing readiness of intake water channel (NTPL Package) at site

Visit at Fuel oil Pump House

Visit at compressor house

Inspection of power cycle Piping

Inspection of TG Floor

Inside Common control room

Interaction with site staff at TG floor

Inspection at Boiler-1 Firing Floor

Inspection at Boiler-1 Firing Floor

Inspection of Junction Tower 10 & 11

GM-IC addressing site staff

GM-IC,PSSR discussion with CEO,NTPL Site,Tuticorin