green it situation & activities in · pdf filethailand green it seminar 2013 11 july 2013...
Post on 29-Mar-2018
214 Views
Preview:
TRANSCRIPT
Green IT Situation & Activities in Thailand
Dr. Chirapat Popuang
Senior Director, Information and Technical Service Dept.,
Electrical and Electronics Institute (EEI)
11 July 2013
Thailand Green IT Seminar 2013
Thailand Green IT Seminar 2013
11 July 2013
Electrical and Electronics Institute (EEI), Thailand’s Ministry of Industry Foundation for Industrial Development
2
EEI is a network institute to promote • development of electrical, electronic, &
telecommunication industries;
EEI Main Activities:
• Intelligence Unit of industrial information
• Center of Excellence of coordinating between
government, private, & academic sectors
• Service Provider of industrial clustering,
factory training, production consulting,
industrial studying, product testing,
equipment calibrating, factory inspection,
etc.
EEI is a network institute to promote • development of electrical, electronic, &
telecommunication industries;
EEI Main Activities:
• Intelligence Unit of industrial information
• Center of Excellence of coordinating between
government, private, & academic sectors
• Service Provider of industrial clustering,
factory training, production consulting,
industrial studying, product testing,
equipment calibrating, factory inspection,
etc.
Head Office: Banglumpoo Head Office: Banglumpoo
Operation and Standards Center, at Bangpoo Industrial Estate, Samutprakarn
Operation and Standards Center, at Bangpoo Industrial Estate, Samutprakarn
Main Activities at OSC:
• Product Testing (Accredited by TISI ISO/IEC 17025
and IECEE CB Scheme)
• Measuring Instrument
Calibration (Accredited by TISI ISO/IEC 17025)
• Factory Inspection (Accredited by TISI ISO/IEC 17020)
Established on 7July 1998
Thailand Green IT Seminar 2013
11 July 2013
Contents
• Green IT related Plan
• Activities and Experiences to date
– Greening Activities (Green of IT)
– Greening Applications (Green by IT)
• Conclusions & Recommendations
3
Thailand Green IT Seminar 2013
11 July 2013
Green IT related Plan Ministry of Information and Communication
Technology (MICT) (2014-2017)
4
Country Strategy
• Building stability & sustainability of economic growth
MICT Strategy
•Developing & promoting ICT applications in managing the country's sustainability development
MICT Strategic Objective
• Government, private, and public sectors enable to apply ICT for effectively improving service quality & safe quality of life
• ICT business, industry, and services are promoted & supported up to potentiality & self sufficiency
• ICT personnel are developed to be capable of, following professional standards, and/ or qualified with ICT industry needs to increase potentiality of international competitiveness
• etc.
Thailand Green IT Seminar 2013
11 July 2013 5
MICT Measure
•ICT industry is promoted & developed to improve competitive potentiality for self sufficiency of provider/ producer
•Creating "push" mechanism for ICT service & provider/ producer to comply with international standards
•Promoting & supporting R&D to improve Thailand ICT
•Promoting & developing Thai ICT personnel to qualify with professional standards and/ or fit to ICT industry needs
•Preparing for ICT implementation at international level
•etc.
MICT Project
• Reputation promotion of Thai potential software product, service, & competitive potential building
•Promotion of business network & partners in industry
•Promotion & development of Thai ICT product standards
•Standards promotion of product and provider/ producer to be ready for ASEAN competitiveness
•Personnel incubating & preparing to support major industries
•Growth on environmental friendly quality of life using ICT
•Research development of ICT technology & assistive technology
•Development of computerized traffic data storage
•Thailand International ICT Expo
•ITU Telecom World 2013
•Promotion of business development & investment to increase international competitive potential of ICT provider/ producer
•etc.
Green IT related Plan, cont.
MICT (2014-2017)
Thailand Green IT Seminar 2013
11 July 2013
Target to reduce “Energy Intensity” (Energy
amount used per GDP unit) by 25% from 16.2
ktoe/billion Baht to 12.1 ktoe/billion Baht)
[Source: MOE, Energy Policy & Planning Office (EPPO), The 20-year Energy
Efficiency Development Plan (EEDP) (2011-2030)]
Target to reduce “Energy Intensity” (Energy
amount used per GDP unit) by 25% from 16.2
ktoe/billion Baht to 12.1 ktoe/billion Baht)
[Source: MOE, Energy Policy & Planning Office (EPPO), The 20-year Energy
Efficiency Development Plan (EEDP) (2011-2030)]
6
Green IT related Plan, cont.
Ministry of Energy (MOE)
Thailand Green IT Seminar 2013
11 July 2013
Target to use renewable energy by 25% of total energy usage [Source: MOE, Department of Alternative Energy Development and Efficiency (DEDE),
Renewable and Alternative Energy Development Plan (AEDP : 2012-2021)]
7
Renewable Energy Development as of Sept. 2012
Green IT related Plan, cont.
MOE
• Appliances are more energy efficient because they are controlled by
embedded system.
• Embedded system is included in electrical and electronic equipment:
Em
be
dd
ed
Syste
m
Large household
appliances
Small household
appliances
IT and tele-
communications
equipment
Consumer
equipment
Lighting
equipment
Electrical and
electronic tools
Toys, leisure
and sports
equipment
Medical devices Monitoring and
control
instruments
Automatic
dispensers
Green IT related Plan, cont.
8 Thailand Green IT Seminar 2013
11 July 2013
Thailand Green IT Seminar 2013
11 July 2013
Greening Activities
– Product energy efficiency, 1992
Act (Energy promotion and
conservation, amended in 2007)
(DEDE), enforced since 2009 (being
studied by EEI in 2013)
– Air-Conditioner
– Refrigerator
– Electric fan
– Electric rice cooker
– Electric water pot
– Electric water heater
– Chiller
– (Glass insulator)
– High energy efficiency
labeling product (MOE) and
EGAT energy saving label
No. 5 (being studied by EEI
in 2013)
• Fluorescent lamp
• Ballast
• TV (stand-by mode)
• Computer monitor (stand-by
mode)
• (Gas stove (low pressure))
• Luminaire
• Fiberglass
Thailand Green IT Seminar 2013
11 July 2013
Greening Activities, cont.
Energy Label No. 5 (Electricity Generating Authority of Thailand--EGAT)
Energy Label No. 5 (Electricity Generating Authority of Thailand--EGAT)
10
Total Label No.5 for all products (1995-2013)
1. Refrigerator
2. Air Conditioner
3. Low‐Loss Ballast
4. Electric Fan (Table/ Floor types)
5. CFL
6. Rice cooker
7. Lamp
8. Thin tube T5
9. Ballast T5
10. Double oscillating fan
11. Lamp T5
12. Electric Kettle
13. Standby Power, 1 watt (Monitor (2010) & TV)
14. Ventilators
15. Electric Water Heater
16. Electric Irons
Total Label No.5 for all products (1995-2013)
1. Refrigerator
2. Air Conditioner
3. Low‐Loss Ballast
4. Electric Fan (Table/ Floor types)
5. CFL
6. Rice cooker
7. Lamp
8. Thin tube T5
9. Ballast T5
10. Double oscillating fan
11. Lamp T5
12. Electric Kettle
13. Standby Power, 1 watt (Monitor (2010) & TV)
14. Ventilators
15. Electric Water Heater
16. Electric Irons
Up-coming products
• LED lamp
• Freezer
• Washing Machine
Up-coming products
• LED lamp
• Freezer
• Washing Machine
MOE
Thailand Green IT Seminar 2013
11 July 2013 11
Greening Activities, cont.
MOE
Energy Label No. 5 (Electricity Generating Authority of Thailand--EGAT)
Energy Label No. 5 (Electricity Generating Authority of Thailand--EGAT)
Label No.5 standards are moving higher. Label No.5 standards are moving higher.
Thailand Green IT Seminar 2013
11 July 2013
Greening Activities, cont.
Product Minimum Efficiency Performance
Standards: MEPs--Thai Industrial Standards
Institute (TISI)
• Refrigerator, since 2004
• Air-conditioner, since 2004
• Motor, since 2004
• Ballast, since 2003
• Compact fluorescent lamp, since 2003
• Fluorescent lamp, since 2003
Thailand Green IT Seminar 2013
11 July 2013
MOST
NECTEC Mark (National Electronics and Computer Technology Center
–NECTEC)
13
Greening Activities, cont.
For computer and peripherals
(energy efficiency), 2010
For computer and peripherals
(energy efficiency), 2010
Thailand Green IT Seminar 2013
11 July 2013
Greening Applications
MICT
•Real-time Traffic Report via website and mobile application
(Traffy on web 2010)
- Maps
- Real-time CCTV traffic data
- Traffic forecast
- Introduce travel route
14
Thailand Green IT Seminar 2013
11 July 2013
Thailand Environment Institute (TEI)
•Ready-to-use Green Label Requirements since 2003
15
Greening Activities, cont.
• Computer (TGL-12-R1-12)
• Photocopier (TGL-27-R2-09)
• Mobile phone (TGL-35-03)
• Facsimile machine (TGL-36-R1-12)
• Printer (TGL-37-R1-12)
• Toner cartridge (TGL-30/1-R2-09)
• Computer (TGL-12-R1-12)
• Photocopier (TGL-27-R2-09)
• Mobile phone (TGL-35-03)
• Facsimile machine (TGL-36-R1-12)
• Printer (TGL-37-R1-12)
• Toner cartridge (TGL-30/1-R2-09)
Thailand Green IT Seminar 2013
11 July 2013
TEI
16
Carbon Reduction Label is a label indicating the
reduction of greenhouse gas emissions per unit of product/service.
- T8 FL, - Circular Fluorescent Lamps - T8 FL, - Circular Fluorescent Lamps
Products certified Carbon Reduction Label (EE products) Products certified Carbon Reduction Label (EE products)
Greening Activities, cont.
Thailand Green IT Seminar 2013
11 July 2013
Thailand Greenhouse Gas Management
Organization (TGO) (a public organization—MNRE)
17
Amount of greenhouse gas
(gram) presented in form of CO2eq
Amount of greenhouse gas
(gram) presented in form of CO2eq
Products certified: - Photocopier (formerly)
- Solar inverter (formerly)
- DC cooling fan (formerly)
Pollution Control Department
(PCD) (MNRE)
• Green Procurement
Greening Activities, cont.
- Photocopier
- Printer
- Toner cartridge
- etc.
Thailand Green IT Seminar 2013
11 July 2013
Greening Applications, cont.
• Embedded System for Power and
Production Management Project
(2007-2009, 2011-2012)
» Start 2007 prototyping 4 factories
» 2008 expanded the project to 9
factories
» 2009 expanded the project to 40
factories
» 2011 expanded the project to 35
factories
» 2012 expanded the project to 30
factories
• RosettaNet Hub for supply chain
management in EE Industry project
• Embedded System for Power and
Production Management Project
(2007-2009, 2011-2012)
» Start 2007 prototyping 4 factories
» 2008 expanded the project to 9
factories
» 2009 expanded the project to 40
factories
» 2011 expanded the project to 35
factories
» 2012 expanded the project to 30
factories
• RosettaNet Hub for supply chain
management in EE Industry project
18
System “Prototypes”
developed by Electrical and
Electronics Institute (EEI)
with the government support
• Power Monitoring System
• Production Monitoring
System
• Warehouse Management
System
• Material Transportation for
E-Kanban Mfg. System
• Power Monitoring System
• Production Monitoring
System
• Warehouse Management
System
• Material Transportation for
E-Kanban Mfg. System
System Overview: Power Monitoring System System Overview: Power Monitoring System
Digital meter at machines Digital meter at machines
Software at server to receive and calculate data from meters
Software at server to receive and calculate data from meters
Display board in factory for monitoring peak demand
Display board in factory for monitoring peak demand
Wireless module to receive data from meter
Wireless module to receive data from meter
Wireless module to receive data from server
Wireless module to receive data from server
Greening Applications, cont.
19 Thailand Green IT Seminar 2013
11 July 2013
System Overview: Production Monitoring System System Overview: Production Monitoring System
Data terminal at QC station for input data
Data terminal at QC station for input data
Software at Server to receive and calculate data from data terminals
Software at Server to receive and calculate data from data terminals
Display board in production line for monitoring defect rate
Display board in production line for monitoring defect rate
Greening Applications, cont.
20 Thailand Green IT Seminar 2013
11 July 2013
System Overview: Warehouse Management System System Overview: Warehouse Management System
Data terminal at operator station in warehouse for input data
Data terminal at operator station in warehouse for input data
Wireless module for sending data to server
Wireless module for sending data to server
Wireless module for sending data to server
Wireless module for sending data to server
Software at Server to receive and calculate data from data terminal
Software at Server to receive and calculate data from data terminal
Greening Applications, cont.
21 Thailand Green IT Seminar 2013
11 July 2013
System # of Factories Implemented
Average Output / Year
Power Monitoring 68 reduced peak demand by 36.5%
Production Monitoring 32 reduced defect rate by 54.0%
Warehouse Management
10 reduced inventory cost by 52.8%
Material
Transportation for E-Kanban Manufacturing
8 reduced WIP by 38.4%
Embedded System for Power and Production Management Project:
2007-2009, 2011-2012
Greening Applications, cont.
22 Thailand Green IT Seminar 2013
11 July 2013
System Overview: RosettaNet Hub for Supply Chain Management
Backend
System (ERP)RosettaNet
Server
Firewall
RosettaNet
Server
(ASP)
Internet
RosettaNet
Server
(Direct
Model)
Internet
Internet
Internet
-Buyer
-Financial
-Inventory
-Buyer
-Financial
-Inventory
M-PIP RosettaNet e-Business Architecture
Supplier #1
Supplier #2-9
Supplier #9
Buyer CompanySupplier Company – ASP Model
Backend
System
(ERP)
Firew
all
Anchor Hardware and
Components
Server 1 set
Firewall 1 set
Windows 2005 Server
SQL 2005 Include 5 cal
Duns Registration 1 ea
BizTalk Std Version
Internet
Firew
all
ASP Hardware and
Components
Server 1 set
Firewall 1 set
Windows 2005 Server
SQL 2005 Include 5 cal
Duns Registrations 9 ea
BizTalk Std Version
Direct-Connect Company
HW and components
Server 1 set
Firewall 1 set
Windows 2005 Server
SQL 2005 Include 5 cal
Duns Registration 1 ea
BizTalk Branch version
Supplier Company – Direct model
Greening Applications, cont.
23 Thailand Green IT Seminar 2013
11 July 2013
Thailand Green IT Seminar 2013
11 July 2013
Implementation
Year
# of Network Company
2008 1 Anchor Company + 30 Suppliers
2009 1 Anchor Company + 9 Suppliers
2010 1 Anchor Company + 29 Suppliers
2011 1 Anchor Company + 9 Suppliers
2012 2 Anchor Companies +18 Suppliers
RosettaNet Hub for Supply Chain Management Project
Greening Applications, cont.
24
Thailand Green IT Seminar 2013
11 July 2013
Conclusions & Recommendations
25
Awareness & responsiveness to green mfg. &
green society trend ++ Government policy ; strategies ; action plan
++ Industrial & Commercial Sector
++ Improvement of production technology
++ Embedded system
++ Automation/ Intelligence system
++ Green IT/ Green industry
++ End-of-life IT should be as well taken into consideration.
++ (draft) National Integrated E-waste Management Strategy
Phase II: 2012-2016
Awareness & responsiveness to green mfg. &
green society trend ++ Government policy ; strategies ; action plan
++ Industrial & Commercial Sector
++ Improvement of production technology
++ Embedded system
++ Automation/ Intelligence system
++ Green IT/ Green industry
++ End-of-life IT should be as well taken into consideration.
++ (draft) National Integrated E-waste Management Strategy
Phase II: 2012-2016
Thailand Green IT Seminar 2013
11 July 2013
Conclusions & Recommendations
26
Critical Success Factor
Integration of inter-ministerial policy & strategies related to greening the
Environment & the Society, e.g., Ministry of Energy
Ministry of Information and Communication Technology
Ministry of Science and Technology
Ministry of Industry
Ministry of Transport
Ministry of Natural Resources and Environment
Clear identification of ; the key player/host, supporting player, timeline of
each action, and expected outcome / kpi of the action plan
Solicited integrated cooperation among key players both domestic &
international, private & government to enhance capacity building
activities, e.g.,
Green ICT Master-class (GIM)
Critical Success Factor
Integration of inter-ministerial policy & strategies related to greening the
Environment & the Society, e.g., Ministry of Energy
Ministry of Information and Communication Technology
Ministry of Science and Technology
Ministry of Industry
Ministry of Transport
Ministry of Natural Resources and Environment
Clear identification of ; the key player/host, supporting player, timeline of
each action, and expected outcome / kpi of the action plan
Solicited integrated cooperation among key players both domestic &
international, private & government to enhance capacity building
activities, e.g.,
Green ICT Master-class (GIM)
top related