group # 4 mohammed ali al-hulail abdulaziz adnan al-aqeel fahad salem al-qailani

Post on 18-Jan-2018

220 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

 The main problem we faced last week was having a midterm in the mid of the week which reduced time we had to accomplish the tasks we assigned to each other.  Another problem we faced is RFID company (Future) asked us to come again in the following week.

TRANSCRIPT

Group # 4Mohammed Ali Al-Hulail

Abdulaziz Adnan Al-AqeelFahad Salem Al-Qailani

There was no formal meeting last week, the communication was done through Telephone

The task was divided by the following: 1)Mahmmed and Abdulaziz 2) Fahad prepare the necessary paper for the

ministry of interior

The main problem we faced last week was having a midterm in the mid of the week which reduced time we had to accomplish the tasks we assigned to each other.

Another problem we faced is RFID company (Future) asked us to come again in the following week.

Due the Problem we faced we didn’t accomplish Major task this week.

To visit the ministry of interior

Select the hardware and understating how

to program it.

Week Task 1 (30-3-08) Feasibility study + sponsorships 2 (06-4-08) Selecting hardware and IDE 3 (13-4-08) Design and Implementation database 4 (20-4-08) Programming the RFID reader / writer

+ interface 5 (27-4-08) Integrating the project as a whole 6 (04-5-08) Testing 7 (11-5-08) GUI components 8 (18-5-08) Adding extra functionality to the

project 9 (25-5-08) Space time 10 (01-6-08) Space time

top related