Group of Experts on Benchmarking Transport Infrastructure
Construction Costs - rail
Geneva, 30-31 January 2020
22
Answers received
Country/organisation Projects Elements of infrastructure
Bulgaria V V
Croatia V
Finland V
Poland V
Turkey V V
UNECE TER V
33
Bulgaria
V<120 120<V≤160 km/h
new construction - -
upgrade - 5
renewal - -
44
Bulgaria – renewal (US$/km)
55
Bulgaria – renewal (US$/m or US$/m2)
66
Bulgaria – renewal (US$/unit)
77
Bulgaria – upgrade (US$/km)
88
Bulgaria – upgrade (US$/m or US$/m2)
99
Bulgaria – upgrade (US$/unit)
1010
Croatia
V<120 120<V≤160 km/h
new construction 1 -
upgrade 1 3
renewal 4 5
1111
Croatia – new construction
0.00
5,000,000.00
10,000,000.00
15,000,000.00
20,000,000.00
25,000,000.00
30,000,000.00
35,000,000.00
Construction of a new railway line for suburban traffic on section Gradec – Sveti Ivan Žabno
new construction
Costs of stations
Costs of level crossings
Costs of bridges/viaducts
Others
1212
Croatia – renewal
0.00
10,000,000.00
20,000,000.00
30,000,000.00
40,000,000.00
50,000,000.00
60,000,000.00
70,000,000.00
80,000,000.00
Vinkovci toTovarnik to
State BorderRailway
Rehabilitation
Sectionrenewal
Moravice -(Skrad), ZagrebMain Station -
Rijeka line
Sectionrenewal Ogulin
- (Moravice),Zagreb Main
Station - Rijekaline
Sectionrenewal Lokve-
(Drivenik),Zagreb Main
Station - Rijekaline
Sectionrenewal
Koprivnica -Botovo - StateBorder, State
Border -Botovo - Dugo
Selo line
Sectionrenewal
(Križevci)-(Koprivnica),
State Border -Botovo - Dugo
Selo line
SectionrenewalZagreb
Borongaj -(Dugo Selo),Zagreb Main
Station - DugoSelo line
Sectionrenewal Velika
Gorica -(Turopolje),Zagreb Main
Station - Sisak -Novska line
Sectionrenewal Klara -
(Zagreb MS),Zagreb Main
Station - Sisak -Novska line
renewal
Costs of stations
Costs of level crossings
Costs of tunnels
Others
1313
Croatia – upgrade
0.00
50,000,000.00
100,000,000.00
150,000,000.00
200,000,000.00
250,000,000.00
300,000,000.00
Okučani to Novska RailwayRehabilitation and Upgrade
Zagreb Main Railway Station -reconstruction (modernisation)
of signalling and interlockingsystem, in scope of IPA Fund
Reconstruction of existing andconstruction of second track on
section Dugo Selo - Križevci,State Border - Botovo - Dugo
Selo line
Modernisation and sectionupgrade of Oštarije - Knin - Split
line
upgrade
Costs of over/underpasses
Costs of stations
Costs of level crossings
Costs of bridges/viaducts
Others
1414
Finland
V<120 120<V≤160 km/h
new construction 2 -
upgrade 2 1
renewal - -
1515
Finland – new construction
1616
Finland – upgrade
1717
Poland – upgrade (US$/km)
1818
Poland – upgrade (US$/m or US$/m2)
1919
Poland – upgrade (US$/unit)
2020
Turkey
V<120 120<V≤160 km/h
new construction 1 2
upgrade - -
renewal - -
2121
Turkey – new construction (US$/km)
2222
Turkey – new construction (US$/m or US$/m2)
2323
Turkey – new construction (US$/unit)
2424
Bulgaria, Poland – upgrade (US$/km)
2525
Bulgaria, Poland – upgrade (US$/m)
2626
Bulgaria, Poland – upgrade (US$/unit)
2727
Croatia, Turkey, Finland – new construction, V<120
2828
TER database Bulgaria
Project
ID+type
New
Rehabilitation,mo
dernization
Electrification
Project
description
(according to the
revised Master Plan
Final Report)
Length
(km)
Construc
-
tion cost
(EURx106
)
Note
BG-R-1 Electrification and upgrading of
Plovdiv – Svilengrad line, Phase I
Krumovo – Parvomay railway
section
38 159
BG-R-1 Electrification and upgrading of
Plovdiv – Svilengrad line, Phase II
Parvomay – Svilengrad railway
section
103 208
BG-R-3 Electrification and upgrading of
Svilengrad – Turkish border line
18 43
BG-R-5 Phase I Rehabilitation of railway
infrastructure along sections of
the Plovdiv -Burgas railway line
177 244
BG-R-5 Modernization of the railway
section Septemvri – Plovdiv – part
of the TransEuropean railway
network
61 159
BG-R-7 Rehabilitation of railway
infrastructure along sections of
the Sofia -Karlovo - Zimnitza
railway line
54 82
2929
TER database Czech Republic
Project
ID+type
New
Rehabilitation,m
odernization
Electrification
Project
description
(according to the
revised Master Plan
Final Report)
Length
(km)
Construc-
tion cost
(EURx106)
Note
CZ-R-4 Bystrice nad Olsi – Cesky Tesin,
phase II, station Cesky Tesin
2 62
CZ-R-7 Beroun – Plzen –Cheb, introduction
of GSM-R system
185 21
CZ-R-7 Modernization of line Praha –
Plzen, section
Rokycany - Plzen
282 72
CZ-R-9 Modernization of line Praha –
Česka Trebova,
junction Usti nad Orlici
2 53
CZ-R-10 Usti nad Orlici – Letohrad,
modernization
13 24
CZ-R-11 Teplice nad Becvou – Hustopece
nad Becvou, modernization
8 29
CZ-R-11 Valasske Mezirici – Vsetin – Horni
Lidec, modernization
34 30
CZ-R-12 Brno Malomerice – Brno Zidenice,
modernization
3 35
CZ-R-13 Praha Bubenec – Praha
Holesovice, modernization
3 46
3030
TER database Lithuania
Project
ID+type
New
Rehabilitation,m
odernization
Electrification
Project
description
(according to the
revised Master Plan
Final Report)
Length
(km)
Construc-
tion cost
(EURx106
)
Note
LT-R-5 Construction of second track on
Kyviskes – Valciunai line (Vilnius
station bypass)
50 61
3131
TER database Poland
Project
ID+type
New
Rehabilitation,m
odernization
Electrification
Project
description
(according to the
revised Master Plan
Final Report)
Length
(km)
Construc-
tion cost
(EURx106
)
Note
PL-R-6 Modernization of E30 line
(Bielawa Dolna - Horka
section), construction of
bridge on Nysa Luzycka +
electrification, phase II
1 5
PL-R-8 Modernization of E30/CE30
line (Krakow - Rzeszow
section), phase III phase I
139 700
PL-R-10 Modernization of E59 line
Wroclaw - Poznan, phase III
(Czempin - Poznan section)
phase I
32 80
PL-R-11 Modernization of E59 line
Wroclaw – Poznan, phase II
(Wroclaw - Dolnoslaskie
Voivodeship border section)
58 217
3232
TER database Serbia
Project
ID+type
New
Rehabilitation,m
odernization
Electrification
Project
description
(according to the
revised Master Plan
Final Report)
Length
(km)
Construc-
tion cost
(EURx106
)
Note
SR-R-1 Reconstruction of the line
Beograd – Sid, section Golubinci –
Ruma
18 12
SR-R-3 Reconstruction of the single track
and construction of the second
track on the line Pancevacki Most
- Pancevo Glavna, reconstruction
of stations Krnjaca, Ovca,
Pancevo bridge, construction of
the new bridge over Tamis river
15 81
SR-R-4 Reconstruction of existing track
and construction of the second
track with the construction of a
new bridge on the Velika Morava
river
10 42
SR-R-4 Reconstruction of two sections of
rail line Beograd - Nis: Sopot
Kosmajski - Kovacevac and Mala
Krsna - Velika Plana
48 24
SR-R-5 Reconstruction of three sections of
rail line Nis – Presevo – FYROM
border: Vinarce – Dordevo,
Vranjska Banja – Ristovac,
Bujanovac - Bukarevac
47 33
3333
TER database Slovakia
Project
ID+type
New
Rehabilitation,m
odernization
Electrification
Project
description
(according to the
revised Master Plan
Final Report)
Length
(km)
Construc-
tion cost
(EURx106
)
Note
SL-R-5 Modernization of the section
Belusa - Puchov
9 87
3434
TER database Turkey
Project
ID+type
New
Rehabilitation,m
odernization
Electrification
Project
description
(according to the
revised Master Plan
Final Report)
Length
(km)
Construc-
tion cost
(EURx106
)
Note
TR-R-11 Irmak – Karabuk – Zonguldak,
rehabilitation and signalling
415 220
3535
Thank you for your attention