Headquarters U.S. Air Force
As of: 1
HAF Around the World
LtCol Frank FreemanHQ USAF/ILEXX
Aug 2004
As of: 2I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Overview
PurposeFrame the DiscussionHAF Organizational IssuesRoles and ResponsibilitiesExpeditionary Site PlanningJRAC DoctrineJOEBManpower IssuesParting Thoughts
As of: 3I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Why we are here…
“I need to bed my forces down and I need to know all this stuff
about it. I want one console and a bunch of icons would be
fine, but they better be integrated. I don't want to arrive to find my tent city
where my bombs have to go.”
Gen John Jumper, Jun ‘01
“Make sure we all understand (I think we do but just to make sure). This isn't just RED HORSE
Engineers. This is part of our CRG CONOPS and part of our GMTF CONOPS - includes security
forces, engineers, medical, contracting, comm, airlift control, airspace/airfield ops etc.” Gen
Jumper, 23 May 03
As of: 4I n t e g r i t y - S e r v i c e - E x c e l l e n c e
GeoBase
As of: 5I n t e g r i t y - S e r v i c e - E x c e l l e n c e
GarrisonGarrisonGeoBaseGeoBase
Garrison GeoBase“One base… one map” for all base planning and operations
ExpeditionaryExpeditionaryGeoBaseGeoBase
Expeditionary GeoBaseEstablish “one base… one map” situational awareness forward
GeoReach ProcessCompiles advance knowledge of FOL to minimize basing risksIncludes 5 phases of “Identify - Image - Map - Assess - Web-Enable”
Concept of OperationsOne Basing “Continuum”
As of: 6I n t e g r i t y - S e r v i c e - E x c e l l e n c e
USAF Mission Impacts
As of: 7I n t e g r i t y - S e r v i c e - E x c e l l e n c e
GeoBase Integration
GeoBaseReference Framework
Integrated SituationalKnowledge
SC InformationSC Information
CE InformationCE Information
SF InformationSF Information
SVS InformationSVS Information
XP InformationXP Information
IG InformationIG Information
SG InformationSG Information
JAG InformationJAG Information
TRANS InformationTRANS Information
SE InformationSE Information
MUNS InformationMUNS Information
SSUURRRROOUUNNDDIINNGG
RREEGGIIOONN
AARRCCHHIITTEECCTTUURREE
TTOOOOLLSS
SSTTAANNDDAARRDDSS
As of: 8I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The HAF’s Challenge
•Recognize that the Air Force is starting from multiple “places”
•Find a way to converge on an structured and single GeoBase waypoint
•Then Towards “One Air Force, One Network, One GeoBase”
As of: 9I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Present GeoBase Echelons
INSTALLATION GIOs
AIR STAFF
FOA
MAJCOM
AFCESAGIO
AFCEEGIO
*AFRPA GIO
**AFSFCGIO
***AFSCGIO
38EIGGIO
AFC2ISRGIO
ILGD
OSD I&E DGB
CAG IPT (I&E)
OSD
ACCGIO
PACAFGIO
AFSOCGIO
AFSPCGIO
USAFEGIO
AMCGIO
AFMCGIO
AFRCGIO
ANGGIO
USAFAGIO
11WGGIO
AETCGIO
WINGS
AF-CIO/S/P/R/A
ILIS
AF-CIO AF/IL AF/XI
AF/ILEAF/ILI AF/ILGILEX ILE-I (HAF GIO) Initial Coordination
Final Coord
Final Approval
Final Coord
*SAF/IEI***AF/SE**AF/XOF
Internal Coord/ApprovalOf FOA GeoBase Posture
MAJCOM or DRU/CCInternal Coord/Approval
Of GeoBase Posture
WING/CCGeoBase Impacts
As of: 10I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Civil Engineers
ILEX Support Roles and Responsibilities
Lead GeoBase involvement in Expeditionary Engineering, Readiness and Joint Operational PlanningGather funds for GeoBase/ESP through HAF channelsCoordinate ESP operational support activities between HAF and MAJCOMs
ILE-I Support Roles and Responsibilities
Lead for Strategic and Garrison GeoBaseAFCESA, AFCEE, AFC2ISRC
The Pentagon
As of: 11I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Is GeoBase really an AF enabled systems?
Next Generation Installations(NGI)SAF/IEI
Automated Civil Engineer System(ACES)AF/ILE
Installation Data Warehouse(IDW)AF/IL
Infrastructure Capacity Analysis Tool(IRCAT)AF/ILEPB
Logisticians Contingency Analysis Toolkit(LOGCAT)AF/ILGC
Combat Support Command and Control(CSC2)
AF/XOF
Base Information System (BIS)
OSD/I&E
Contingency AircraftParking Planner
(CAPP)AMC/DO
Base Engineer Survey Tool (GeoBEST)PACAF/CEXX
Command Core SG
Formal discussions with over 15 systems including:
Air Base Defense Planner(Defensor Fortis) PACAF/SFO
As of: 12I n t e g r i t y - S e r v i c e - E x c e l l e n c e
AF CIO Involvement
ILE-I met with AF-CIO/Systems Mar 04 to discuss opportunities to more closely team with the AF-CIO enterprise IT effortsResult: AF-CIO will look for ways to integrate the present and potential capabilities of GeoBase into the mainstream enterprise efforts
ILE-I and AF CIO will work to formally recognize IM&V as a distinct cross-cutting mission architecture council The goal is to have IM&V (GeoBase) share equal footing with other mission architectures within the overarching USAF Enterprise Architecture Integration CouncilAF can lead the other Services in showing how geospatial information resources can be optimally employed across the mission
As of: 13I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Why Improve Expeditionary Site Planning?
Basing deficiencies in recent contingencies: No prior site knowledge to optimize basingNo beddown pre-plansPoor parking plans required some units to return to home basesPoor beddown plans caused excess resources to be airlifted
General Accounting Office (GAO) review (01-481) of 1999’s Air War Over Serbia (AWOS) Basing Strategy--GAO to EUCOM: Develop aircraft basing strategy tied to future threatsMaintain a database of complete information on EUCOM airfields
Need decision-quality information on airfields
AWOS Beddown
As of: 14I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Expeditionary Site Planning Continuum
Deliberate/Crisis Planning (Operational) Execution (Tactical)
Global Mobility CONOPS, Para 5.1.1.2.1:“Collect/update data on runway and base infrastructure from airfields, remote and en-route to provide runway and basing capability and capacity, at frequent intervals prior to crisis development. Perform pre-action assessment. Maintain Worldwide awareness of airfield capabilities to support mobility operations”
Locate
Collect
Assess
Enable
OPEN THE
AIRBASE
ESTABLISH THE
AIRBASE
COMMAND & CONTROL
OPERATE THE
AIRBASE
GENERATE THE
MISSION
Force Modules
Time
As of: 15I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Dynamic SustainmentSupport
CBLP-A
IESP: BCAT/EKB/STEP/GEOREACH / VEST
FAB-E: CBLP and BCAT functionality- enhanced CBLP- W
Early Force and BeddownPlanning and Selection-
Preliminary COA Assessment
Detail deploymentand Support Infrastructure
Planning and COA Assessment
COAs / Force Selection WHO?
Force Beddown Alternatives WHERE?
Deployment plans and flow WHEN? (Schedule) Employment of Forces WHAT Missions?
Sustainment of Forces HOW to sustain
Detailed Beddown Plans WHAT & HOW to Support?ContinuousAnd
Recursive
Sustainment Planning Tool (SPT)
Dynamic EmploymentPlanning
As-is
To-BeIESP: EKB/STEP/GEOREACH/VEST
Sustainment Planning Tool (SPT)
LOGCAT
Expeditionary Site Planning Tools
As of: 16I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Expeditionary Site Planning
MedicalMunitionsPOLContractingCommunicationsLogistic PlansAirfield OperationsCivil EngineeringSecurity Forces
Communications
Image
TransportationSecurity ForcesMedical
POLCivil Engineering
Airfield Operations
……
ISST ISST –– Initial Site Initial Site Survey Team Survey Team
AFI 10AFI 10--404 Functions404 Functions
GeoReach and Expeditionary GeoReach and Expeditionary GeoBase CIP LayersGeoBase CIP Layers
Tabular DataTabular Data Geospatial DataGeospatial Data
Integrated Integrated Situational Situational AwarenessAwareness
As of: 17I n t e g r i t y - S e r v i c e - E x c e l l e n c e
HQ USAF ESP Doctrine/Organization
ESP requests generated through AF Operations Center (AFOC)
CheckmateStrategic and Operational Planning for CSAF and WarfighterRequest assistance on “Blue Order of Battle” set-up
Combat Support Center (CSC)Agile Combat Support lead for AFOCRequest assistance to review Commander, Air Force Forces (COMAFFOR) plans
ESP requests also come from CSAF, MAJCOMs and Joint Staff
USAF CC, IL, ILE request review of MAJCOM ESP issuesMAJCOMs request ESP assistanceJoint Staff requests AF coordination
Area of Responsibility
As of: 18I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Doctrine
As of: 19I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Quote
“When all else fails, fall back on your doctrine. When all else fails, fall back on what is doctrinally right.”
Lt Gen Michael MoseleyUSCENTAF/CCInside The Air Force
June 20, 2003
We as AF Engineers need to make sure doctrine reflects the preferred way to do business
As of: 20I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Joint Engineer Doctrine
Does it prevent Service redundancies?
Does joint doctrine clearly capture the potential of Geobase in mission planning?
As of: 21I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Joint Pub 3-34 defines 3 types of engineering: Combat, General, and Topographic
We are in the process of rewriting JP 3-34
Topographic becomes Geospatial
Engineer ClassificationsJoint Publication 3-34
As of: 22I n t e g r i t y - S e r v i c e - E x c e l l e n c e
ENHANCED CONSTRUCTIONENHANCED CONSTRUCTION
JRAC technologies will
dramatically increase contingency airfield upgrade and con-
struction capabilities!
Joint Rapid Airfield
Construction
SITE SELECTIONSITE SELECTION
RAPID STABILIZATIONRAPID STABILIZATION
JRAC Research PillarsJRAC Research Pillars
JRAC Statistics•28 work units•Over 30 researchers•$22.5M in Army funds•6 years in 6.2/6.3 phase
As of: 23I n t e g r i t y - S e r v i c e - E x c e l l e n c e
GSDName Description LL (%) PI (%) D10 (mm) w (%) CBR γd (pcf)GW well-graded gravel 8 5 0.4 4 >100 135SP poorly-graded sand 8 6 0.25 4 95 105SM silty-sand with clay 15 8 0.05 12 85 99CL low plasticity grey clay 25 15 0.002 22 89 102CH fat black clay 67 42 <0.001 31 78 92
Atterbergs Field PropertiesUSCS ClassificationRapid Soil Descriptor Database
OBJECTIVE: OBJECTIVE: Provide decision aids to rank and select sites for contingency airfields based on engineering effort, mission suitability, pavement design and construction requirements, and airfield performance under traffic.
Terrain/Site DataTerrain/Site Data
Material DataMaterial Data Performance SimulationPerformance Simulation
C17 Design Chart
JRAC
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Headquarters U.S. Air Force
As of: 24
The Joint Operational
Engineer Board
As of: 25I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Our Goal:
SAME WorkingGroup
WorkingGroup
WorkingGroup
FLOWAction Officers
FLOWEAG
JOEB
FL FCB
JROC
Engineer Capabilities Study (ECS) --Found:
FunctionalSystems Analysis
Conference
EngineerInteroperabilitySteering Group
JCIDSJoint CapabilitiesIntegration and
DevelopmentSystem
Focused LogisticsCampaign
Plan
JROCJoint Requirements Oversight Council
Combatant Commanders
Integrated Priority List - IPLQDR
Quadrennial Defense Review
Joint and ServiceDoctrine
FLOWFocused Logistics
Wargames
SAMESociety of American
Military EngineersDPGDefense Planning
Guidance
Recommends:
As of: 26I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Purpose and Mission
Establish Joint Operational Engineering Board(JOEB)
Advisor / proponent group for engineer issues
Provide direction and focus on operational engineering issues
Enhance joint engineer processes and capabilities to most efficiently and effectively meet Combatant Commander operational requirements
Guide engineer force transformation and interoperability initiatives
As of: 27I n t e g r i t y - S e r v i c e - E x c e l l e n c e
JOEB Membership
Principal Membership Concept: J-4 EquivalentsJoint Staff – Director for Logistics, DJ4 – Chair*CENTCOM – Logistics and Engineering, CCJ4EUCOM – Logistics and Security Assistance, ECJ4 NORTHCOM – Logistics and Engineering, J4PACOM – Logistics, Engineering and Security Assistance – PCJ4SOUTHCOM – Chief of Staff, SCJFCOM – Ops, Plans, Logistics and Engineering, J3/4SOCOM - Acquisition Executive, SOAESTRATCOM – Combat Support, CLTRANSCOM – Strategy, Plans, Policy & Programs, J5
USA – DCS, Logistics, G-4USAF – DCS for Installations and Logistics, AF/ILUSMC – DC, Installations and Logistics, I&LUSN – DCNO, Fleet Readiness and Logistics, N4*Service representative serves as chair in absence of DJ4
As of: 28I n t e g r i t y - S e r v i c e - E x c e l l e n c e
JOEB Membership Associate/Advisory Members:
USA – Chief of Engineers, DAEN-ZC USAF – The Civil Engineer, ILEUSN – Chief of Civil Engineers, OO
Others as needed by invitation
As of: 29I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Basic JOEB WorkingsFull Board to meet semi-annually (Quarterly initially)
Chaired by J4J4-ED, executive secretariatDoes not preclude “e-meetings” to move issues forward
Commissions Working GroupsComposition subject to issue / taskingMeet as needed to accomplish tasksProceedings guided by an Advisory MemberPresent findings, recommendations to the Board
As of: 30I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Transformation Working GroupJFCOM
Interoperability Working GroupNavy Chief of Civil Engineers
Doctrine and Training Working GroupAir Force Civil Engineer
Capabilities Working GroupArmy Chief of Engineers
Working Group Leadership
As of: 31I n t e g r i t y - S e r v i c e - E x c e l l e n c e
PERSONNEL AND TRAINING
As of: 32I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Manpower Issues
Human Capital Task Force #7- Review Mission Support Group Processes
Use “Lean Thinking Principles” to review MSG processes/organizationObjective is to ensure “Blue Suits” are utilized appropriately
Stress Career Field ReviewStress formula under reviewStress formula will be used to make future manpower decisions
Training—3E5XX receives formal training3E9XXOfficers
As of: 33I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Closing Thoughts
Need to leverage others organizations (MAJCOMs, AFC2, Battlelabs)…use their resources, expertiseSSG/ILX—Need them to play with the rest of the teamNeed to stay CONOPS focusedNeed to stay focused on prioritiesNeed to produce results