TRANSCRIPT

1

Health & Status Monitoring: Two Case Studies

Robert Grossman Open Data Group

February 18, 2010

2

1. Introduction

3

Traditional Approach

• Two types of variation:– Common cause of variation (noise) occur as

normal part of manufacturing process– Special cause of variation represents a

potential problem

4

Shewhart control chart used by NIST for calibrating the standard KG.

3 s

Source: NIST

5

Shewhart / Deming Cycle

• Plan – identify opportunity or problem and make a plan.

• Do – implement the change on a small scale and collect the data.

• Check – perform a statistical analysis and check if there was an impact.

• Act – if there was an impact, broaden the scale and continuously improve your results.

6

Case Study 1. Data Center

• Thousands of servers

• Complex workloads

• Large variations are normal

• Problems make the front page

7

Case Study 2. Payments Network• Billion+ cards• 100+ million terminals• Millions of merchants• Thousands of transactions per

second• Thousands of member banks• Data highly heterogeneous

– Variations among products– Variations among cardholders– Variations among merchants– Variations among banks– Variation among payment

networks

8

The Challenge Today

• Many sources and data feeds • Data is complex and highly heterogeneous• High volume, streaming data from around

the world• Multiple parties involved, each of which

can modify the data in subtle ways

9

Health & Status Monitoring SystemsSQC HSM

What is monitored?

Single assembly line producing physical widgets

Digital system with thousands of data feeds

Type of model

Exceed 3 standard deviations

?

# of models Single model ?Visualization Control chart ?

Process Plan-do-check-act ?

10

2. The Technology

11

Observed Model

Baseline Model

CUSUM modelsGLR models

12

Build more than 104 Models: One for Each Cell in Cube of Models

Build separate model for each bank (1000+)

Build separate model for each geographical region (6 regions)

Build separate model for each different type of merchant (over 800 types of merchants)

For each distinct cube, build a distinct model

Geospatial region

Type of Transaction

15,000+ separate baselines

Modeling using Cubes of Models (MCM)

Bank

data updates1. data

collection

Operational systems, data feeds, warehouses, …

3. on-line scoring

Model Consumer

candidate alerts

features

events

PMMLmodels

Entity/Feature Database

2. off-line modeling

Data Mining Mart

learning setsData Mining

System

Rules

Dashboard engine

4. reporting

13

reports

14

Augustus• Augustus is an open source data mining platform:– Used to estimate baselines for over 15,000

separate segmented models – Used to score high volume operational data and

issue alerts for follow up investigations • Augustus is PMML compliant• Augustus scales with– Volume of data– Real time transaction streams (15,000/sec+)– Number of segmented models (10,000+)

15

Greedy Meaningful/Manageable Balancing (GMMB) Algorithm

• Fewer alerts

• Alerts more manageable

• To decrease alerts, remove breakpoint,order by number

of decreased alerts, & select one or more breakpoints to remove

• More alerts

• Alerts more meaningful

• To increase alerts, add breakpoint to split cubes,

order by number of new alerts, &

select one or more new breakpoints

One model for each cell in data cube

Breakpoint

16

3. Case Studies

17

Case Study 1

Open Cloud Testbed Monitor

18

Results• Dozens of separate statistical baselines models

developed and deployed.• Effective for discovering nodes that are hindering

effective use of OCC’s large data cloud.• Dead nodes are easy to identify and remove.• Removing just one or two “slow” nodes from a

pool of 100 nodes can improve overall performance by 15% - 20+%.

19

Dashboard

20

Case Study 2Account

Merchant

Issuing Bank

Acquiring Bank

Payments Network

21

Program Structure• Strategic objective identified early:

– “Identify and ameliorate data interoperability issues to improve the approval rate of valid transactions and the disapproval rate of invalid transactions, ...”

– Report quarterly to CIOs’ council with third-party endorsed monetary benefits summarized on an executive dash board

• Introduced data governance program early in project• Developed payment transaction monitor that produced

candidate alerts• Set up investigation process to screen alerts and

investigate those of interest• Developed reference models and appropriate standards

22

Results• ROI– 5.1x Year 1 (over 6 months)– 7.3x Year 2 (12 months)– 10.0x Year 3 (12 months)

• Over 15,500 separate statistical baselines models developed and deployed.

• Also developed appropriate rules-based models to make work of analysts more efficient.

23

4. Summary

24

Strategic Objective Dashboard

Governance

Monitor - produces candidate

alerts

events program alerts

Business Process

Modeling Process

Investigative Process

candidate alerts

Reference Model

InvestigativeProcess

25

Some Lesson Learned• Business Processes

– Importance of “C”-level executive support, dashboard reports, and a data governance program

• Modeling Processes– Critical to build as many statistical models as the data

required; used open source Augustus software for this– Architecture separated offline modeling and online scoring– Post processing with business rules to control workflow to

analysts• Investigative Processes

– It is not about the models and alerts – it is about optimizing the analysts’ workload and derived business value

– Small changes in report designs had large impact in the effectiveness of the alerts

26

SummarySQC HSM

What is monitored?

Single assembly line producing physical widgets

Digital system with thousands of data feeds

Type of model

Exceed 3 standard deviations

Change detection model

# of models Single model Cube of modelsVisualization Control chart Dashboard

Process Plan-do-check-act Plan-do-check-act

27

For More Information

• Robert Grossman– grossman.info at gmail.com– rgrossman.com (blog)

Learn about Health and status monitoring• Open Data Group• www.opendatatgroup.com

28

References• Joseph Bugajski, Chris Curry, Robert L. Grossman, David Locke, Steve

Vejcik, Detecting Changes in Large Data Sets of Payment Card Data: A Case Study, Proceedings of The Thirteenth ACM SIGKDD International Conference on Knowledge Discovery and Data Mining (KDD 2007), ACM, 2007

• Joseph Bugajski and Robert L. Grossman, An Alert Management Approach to Data Quality: Lessons Learned from the Visa Data Authority Program, Proceedings of the 12th International Conference on Information Quality, (ICIQ 2007).

• Walter A. Shewhart, Statistical Method from the Viewpoint of Quality Control, Dover, 1986.

• H. Vincent Poor and Olympia Hadjiliadis, Quickest Detection, Cambridge University Press, 2009.

• Augustus is an open source system available from augustus.googlecode.com.

top related