heavy lift vehicle configurations

Post on 24-Feb-2016

49 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Heavy Lift Vehicle Configurations. 4 Aug 2011. SLS Evolution Path. Payload ( mT ) 50 60 70 80 90 100 110 120 130. FSB 5 SSME Std ET 2 J-2X-285. FSB 5 SSME Stretched ET 1 J-2X US. Add US. FSB 3 SSME Standard ET - PowerPoint PPT Presentation

TRANSCRIPT

11

Heavy Lift Vehicle Configurations

4 Aug 2011

22

Payload (mT) 50 60 70 80 90 100 110 120 130

FSB4 SSMEStandard ETNo upper stage

FSB5 SSMEStretched ET1 J-2X US

FSB5 SSMEStd ET2 J-2X-285

Add US

FSB3 SSME

Standard ETNo upper stage

HLVHLV

SLS Evolution Path

FSB4 SSMEStretch ETNo upper stage

HLV

33

Payload (mT) 50 60 70 80 90 100 110 120 130

Existing Hardware &

Current Contracts

DM-3

Space Shuttle

Ares I

FSB3 SSME

Standard ETNo upper stage

Liberty

• DM-3 provides directly applicable technology maturation for next generation systems

• DM-3 static test is the third in a critical series of motor tests to evolve and confirm the final Ares First Stage configuration

• DM-3 provides significant risk mitigation for new motor features and satisfies 35 specific design objectives

DM-3 Evolution and Applicability

FSB4 SSMEStandard ETNo upper stage

FSB5 SSMEStretched ET1 J-2X US

FSB5 SSMEStd ET2 J-2X-285

Add US

FSB3 SSME

Standard ETNo upper stage

HLVHLV

FSB4 SSMEStretch ETNo upper stage

HLV

44

DM-3 Major Test Objectives

Overview

• Demonstrate compliance to ballistic performance requirements at a 90oF PMBT

• Assess ballistic predictions with high aft segment mach number and erosive burning at the 90oF PMBT requirement

• Assess reduced insulation thickness as it approaches the projected flight profile

Verify PBI-NBR field joint performance at the upper temperature requirement

• Evaluate aft dome flow characteristics and effect on insulation and boot at the 90oF PMBT requirement

• Verify nozzle erosion at the 90oF PMBT requirement

• Verify nozzle bondline performance at the upper extreme temperature requirement

• Evaluate FNR flat development and potential abnormal erosion

Assess performance of ENKA CCP in ply-lift prone locations

Evaluate nozzle contour change

• Evaluate silica cowl performance

Critical Assessments

• Metal Structural Integrity*• Redundant and Verifiable

Seals*• Pressure and Temp on Joints• Joint Thermal Barrier• FJPS• Case Insulation Operational

Integrity*• Case Insulation Thermal SF• Joint Insulation*• Stress Relief Flap*• Inhibitors*• Field Joint System*• Insulation Structural SF*• Igniter Insulation• Safe & Arm• Operational Pressure

Transducers• PMBT*• Propellant Performance*• Bore Choking SF*• Propellant Structural SF*• Nozzle Vectoring• Flex Boot Vectoring

Capability• Flex Boot Performance

Factor• Throat Erosion• Nozzle Flame Front Liner

Erosion• Nozzle Primary Structural

Elements• Nozzle Phenolics Structural

SF• Nozzle Pre-loaded Bolts• Geometric Angular Alignment

and Radial Offset • Nozzle Barrier• TVC System• Actuator Last Commanded

Position• Shock and Vibration• TVA Temperatures• DFI• Forward Test Stand

Motor Objectives

* Objectives apply to more than one segment

top related