honey creek oepa 319 stream restoration project 2008-2009 pre and post construction photos

Post on 14-Jan-2016

29 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Honey Creek OEPA 319 Stream Restoration Project 2008-2009 Pre and Post Construction Photos. 524 Linear Foot Project Area. In-stream Boulder Construction (Rock Cross Vane) for Guiding the Direction of Main Current. - PowerPoint PPT Presentation

TRANSCRIPT

Honey Creek OEPA 319 Stream Restoration Project 2008-2009Pre and Post Construction Photos

75 foot Live Lift Will Defuse the Stream’s High Flow Energy and Prevent Bank Erosion

524 Linear Foot Project Area

Creation of Point Bar Spillway for Floodwater Release

In-stream Boulder Construction (Rock Cross Vane) for Guiding the Direction of Main Current

top related