You getNoise, Traffic, more accidents, pollution, 24/7 operation, sickness, sleep depravation, lower property values , prisoner in your own home,

lifestyle destruction, exposure to chemical poison cocktails,

Cancer, Asthma, sexual dysfunction, lung sickness, early death, sick children, lower life

expectancy4

Intermodal =Containers + Trucks + Rail +

Warehousing

5

Chipping Norton 4.9km from Container Hell, Gov. Macquarie Dr,Newbridge Rd, Nuwarra, M5, Hume Hwy., in gridlock shutdown.

PRISIONER IN YOUR HOMEThe money men, foreign business interests,

politicians, know all public servants and advisors do not have to live here.

6

7

DO NOT BE CONNED

8

There are two separate plans for Container Transport road & rail freight hubs at Moorebank Av. Moorebank on Federal Defense land.

1st. Stocklands, Qube, Kawasaki & Queensland Rail consortium of 1million Containers and Warehousing on cnr. Anzac Road and Moorebank Av going down to Anzac creek.

2nd Federal Government built and controlled larger site up to 3 Million containers and warehousing on school of military engineering next to Georges River on Moorebank avenue.

Labor & Liberal both want cheap results

9

10

1 x Private consortium by Stocklands, Q.R. (Queensland Rail) and Qube Kaplan Funds Management ("KFM") is the Investment Manager of Qube and The Trust

Company (RE Services) Limited ("Trust") the Responsible Entity.

1 Million Containers a year, movements to & from Storage of goods and Container returns

equal 3 Million Trucks.3,000,000 ~ 365days =

8,219.17 each day in full operation before future expansion

AWAITING APPROVAL

11

Qube logistics

Traffic everywhere you go

12

Moving the Military not cheapyou pay for the move.

13 Burma Railway Aussie Memorial

TENDERS CALLED TO MOVE SCHOOL OF MILITARY ENGINEERING 2KM UP THE ROAD TO HOLSWORTHY BASE

14

COST ALLOWED FOR TENDER, UP TO $740 MILLION. No environmental impact statement for the move.No environmental impact statement for the new

engineering base on Army land that is on the interim list of the National Trust.

No regard for known Aboriginal heritage importance. The most significant Aboriginals sites in N.S.W. still in excellent condition.

No environmental impact study for endangered flora and fauna species on the base and S.M.E.

Are the sites contaminated?Stocklands & Federal Government

15

Disturbance to land while moving and during construction of both sites could

cause the release of toxic dust into the air spreading up to 20km.

Do you want this?

The Georges River habitat will be destroyed by dust, toxins, run off and

dodgy construction practices by lowest price contractors who may not follow

Liverpool Council Guidelines, minimum Australian Standards practices or State & Federal safe environmental standards

16

Noise and pollution from the construction sites will fill the air in an already stagnant

inversion basin surrounding the site.The area surrounding this site for a 10km radius has the worst air quality in Sydney,

before any constructions or pollutants from operations are taken into account.

Protest outside State Parliament house.ARE YOU READY TO JOIN THE FIGHT ?

17

This is not a done dealPeople Power beat the

Holsworthy Airport in 1997.Together we can win again

18

Do you have what it takes to be a winner?Everyone must get involved in same wayChange comes from people who want to

make a difference Is that you?

19

20

21

22

23

24

top related