1I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Building 185

Orientation Briefing

101 Nelson Drive

Offutt AFB, 68113-1023

2I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2

Bldg 185 Orientation

Fast Building Facts:

188,000 Square Feet (SF) – all raised floors

12,000 SF computer space with 3’ raised flooring

MILCON Cost: $29.6M (Builder: Kiewit Bldg Group)

Ground Breaking Mar 06, AFWA Occupancy Jan 08

On track for certification from US Green Bldg Council

3I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3

Bldg 185 Orientation

“Green Features” of Building 185: Use of Locally Manufactured Construction Materials Use of Recyclable Building Materials (bamboo paneling, steel walls, steel

furniture) Reuse of Taxiway as Parking Lot High-efficiency Mechanical Systems Raised Flooring Optimized Use of Natural Light Automatic Light Turn On/Off White Roof West-facing Atrium Alternative Fuel Vehicle Parking Areas Bike Racks Indigenous Landscaping (drought resistant) Localized Water Heaters Centralized Printing and Break Rooms

4I n t e g r i t y - S e r v i c e - E x c e l l e n c e 4

Bldg 185 Parking Plan

Reserved Lots (see next slide for details)

16 Handicap Spaces

Alternative Fuel Vehicles have priority along this row

Open Lot

Open Lot

Delivery Vehicle or GOV parking only

2 Handicap Spaces

Bike Racks (future)

5I n t e g r i t y - S e r v i c e - E x c e l l e n c e 5

Bldg 185 - West Side

Auditorium

AFWA CC Office

Lobby – West (a.k.a. Main Entrance) Door to Observation Deck

A8 Office

1 WXG/CC Office

2 WXG/CC Office

6I n t e g r i t y - S e r v i c e - E x c e l l e n c e 6

Bldg 185 - East Side

View of East Side from large parking lot

• Smoking Area

• Future site of bike racks (unfunded)

East Entrance –

This is the entrance most personnel will use

(24/7 ADT access)

Handicap Ramp

7I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7

Bldg 185 – Lobby

Lobby - North Entrance

Future Location of Food Vendor

Requirement submitted to AAFES for vendor to provide

breakfast and lunch items, M-F 0700-1500

Future location of Video Wall

Lobby – South Entrance

South end of lobby will house historical items in display cases

8I n t e g r i t y - S e r v i c e - E x c e l l e n c e 8

Bldg 185 – Auditorium

• Seats ~200

• State-of-the-Art A/V System will be installed this Spring/Summer

Storage Closets

9I n t e g r i t y - S e r v i c e - E x c e l l e n c e 9

Bldg 185 – Centralized Work Room

Shredder Room, Recycle Room and area for additional refrigerators

Refrigerator Area

Shared print/copy/fax Area

Microwave Area

Light Switch

10I n t e g r i t y - S e r v i c e - E x c e l l e n c e 10

Bldg 185 – Break Room

Recycle Room and area for additional refrigerators

Refrigerator

Shared print/copy/shred/fax

Area

Microwave

3rd Floor Break Room

Refrigerator(s)

Microwave(s)

Room for vending machines along wall (past glass area)

Café Furniture (Unfunded)

11I n t e g r i t y - S e r v i c e - E x c e l l e n c e 11

Bldg 185 – Observation Deck

Outdoor Café Furniture (Unfunded)

12I n t e g r i t y - S e r v i c e - E x c e l l e n c e 12

Bldg 185 – Power Boxes

Floor Box

White Jack: Analog LineBlue Jack: Digital Line (Phone and Computer)

13I n t e g r i t y - S e r v i c e - E x c e l l e n c e 13

Bldg 185 Orientation

Diffuser: Individuals can modify air flow in the local area by

twisting the inner ring of the floor diffuser. There is approximately 1/4″ – 1/2″ of travel between the

opened and closed position.

Return Ducts for Forced-air Thermal Units

14I n t e g r i t y - S e r v i c e - E x c e l l e n c e 14

Bldg 185 Orientation

Interior offices configured using demountable walls for more flexibility in accommodating office changes due to reorganizations

15I n t e g r i t y - S e r v i c e - E x c e l l e n c e 15

Bldg 185 Orientation

Example Computer Room (Dev/Test Area)

Computer Room A/C Unit

Floor Tile Puller

16I n t e g r i t y - S e r v i c e - E x c e l l e n c e 16

Bldg 185 Orientation

SIPRNET reading rooms are located on all four levels:

Access: ADT plus Pin or XO-9 Combo

17I n t e g r i t y - S e r v i c e - E x c e l l e n c e 17

Bldg 185 Main Entrance

18I n t e g r i t y - S e r v i c e - E x c e l l e n c e 18

Bldg 185 West View

19I n t e g r i t y - S e r v i c e - E x c e l l e n c e 19

Bldg 185 West View

20I n t e g r i t y - S e r v i c e - E x c e l l e n c e 20

Bldg 185 South View

21I n t e g r i t y - S e r v i c e - E x c e l l e n c e 21

Bldg 185 Unclass Data Center