IIS Approach to Process Right-SizingLawrence GoldsteinSouthern California SPINFebruary 6, 2004
2
Agenda
• Northrop Grumman Internal Information Services–What is it?–Geographic scope–Some historic data on software process improvement
at IIS• IIS Process Right-Sizing
–General approach–Process size–Size-a-matic™–Tailoring options–Waivers
–Special cases–Maintenance–Web / RAD
–Summary
3
Who is Northrop Grumman IT IIS?
• Northrop Grumman is a $25 billion global defense company– Operating in 50 states and 25 countries– Approximately 120,000 employees– Defense product focus
– Advanced aircraft, shipbuilding and space technology
– Systems integration– Defense electronics– Information technology
• Northrop Grumman’s Internal Information Services (IIS) is the business unit responsible for providing the IT infrastructure to the rest of the corporation– Our only customer is the rest of Northrop
Grumman– Our mission is to provide strategic
information solutions and technologies which contribute to Northrop Grumman’s competitiveness
4
IIS Geographic Scope
IIS Locations – North America
Reston, VA
Sunnyvale, CA
Century City, CA
Hawthorne, CAEl Segundo, CA
Palmdale, CA
Torrance, CASan Pedro, CA
San Diego, CA
Norwalk, CT
Melbourne, FL
GA
Rolling Meadows, IL
Lake Charles, LA
Baltimore, MD
Albuquerque
Bethpage, NY
San Angelo, TX
Dallas, TX
Herndon, VA
Reading, MAToronto, ON
Chantilly, VA
Gaithersburg, MD
College Park, MD
Garland, TX
Goleta, CA Woodland Hills, CANorthridge, CA
Tempe, AZ
Salt Lake City, UT
Apopka, FL
Pascagoula, MSAvondale, LA
Charlottesville, VA
San Jose, CA
Enfield, NS
Ocean Springs, MS
Amherst, NY
Bellevue, NE Greenbelt, MD
Bethesda, MD
Stuart, FL
St. Augustine, FL
Newport News, VAPt. Mugu, CA
Azusa, CA
Huntsville, AL
Over 3,700 Employees
Redondo Beach
Fairfax, VA
Clearfield, UT Aurora, CO
Carson, CA
Fort Hood, TX
San Antonio, TX
Austin, TX
Wheeling, WV
Kettering, OH
Troy, MI
Colorado Springs, CO
San Bernardino, CA
Columbia, MD
Sierra Vista, AZ
5
IIS Process Improvement Path
1992 1994 1996 1998 2000 2002 2004 2006
CMMI L3
NISC*
Grumman*
Westinghouse*
Rolling Meadows*
Litton*
Newport News*
TRW*
Vought*
IIS Infrastructure(Operations, N/W, hardware, etc.)
L2CBA-IPI
L2CBA-IPI
L2CBA-IPI
L3CBA-IPI
* heritage organizations
6
IIS Process Right-SizingGeneral Approach
7
The Problem
Project Labor hours
Num
ber
of P
roje
cts
00
100,000+
8
The Problem
Project Labor hours
Num
ber
of P
roje
cts
00
100,000+
Maintenance
New Development
Enhancements
Data D
riven
Complex Algorithms3D Graphics
Systems of Systems
Business Systems
CO
TS In
tegr
atio
n
Engineering Systems
Manufacturing Systems
Quality Assurance Systems
Financia
l Syste
ms Mainframe
Distrib
uted
Web
PC Stan
dalo
ne
Classified
Unclassified
SAP
PeopleSoft
Lawson
9
The Problem
Project Labor hours
Num
ber
of P
roje
cts
00
100,000+
Maintenance
New Development
Enhancements
Data D
riven
Complex Algorithms3D Graphics
Systems of Systems
Business Systems
CO
TS In
tegr
atio
n
Engineering Systems
Manufacturing Systems
Quality Assurance Systems
Financia
l Syste
ms Mainframe
Distrib
uted
Web
PC Stan
dalo
ne
Classified
Unclassified
SAP
PeopleSoft
Lawson
10
IIS Process Tailoring Philosophy
• The main purpose behind the process is to protect the project from failure–Deliver the product on-time, agreed to cost,
agreed to quality• If less work is needed to create the product, then
less process should be needed to protect the project–Less to go wrong–Consequences of failure are lower
–High dollar value projects with little labor are treated as special cases
But …• The process also is needed for organizational
purposes–Some process is always required regardless of
amount of work to create the product
11
The Devil is in the Details
12
IIS General Approach
The project team determines whether the project is Minor, Small, Medium, or Large.
Minor:<151
Minor:<151
Small:151-1800
Small:151-1800
Medium:1801-7200
Medium:1801-7200
Large:>7200
Large:>7200
Adjust SizeAdjust Size
Size
13
Determine Project Size 1 of 2
• Determine and describe the effort estimating approach and data to be used and how it will be used–Others should be able to recreate
estimate from data provided• Estimate size of software work products• Calculate estimated effort
–Convert work product size to labor hours to produce the products
–Size any other project activities and convert them into labor hours
14
Determine Project Size 2 of 2
• Use Size-a-matic™–Effort Estimate
– Key-in total project effort estimate (hours)
–Size Adjustments– Evaluate risk levels for 6
key areas– Describe rationale for
levels selected
–Resolves the issue of a “large Minor” vs. a “small Medium”
15
Tailoring Building Blocks
• Regardless of development lifecycle chosen by a project, the same general sets of activities always have to be done
• The differences usually revolve around the ORDERING of those activities and the scale of those activities
• All lifecycles have to – Define requirements– Design solutions– Construct code– Discover defects– Etc.
• So why not define plug-and-play processes , tailorable by size, for the different project lifecycles to use?
• Then lifecycle definition becomes a case of pre-defined process ordering with minimal process development required
16
Tailor, Tailor, Tailor
Project size is used to identify the specific activities and deliverables required for each CMMISM Process Area involved in the project.
Minor
Small
Medium
Large
RM PP PMC M&A PPQA CM …•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
•Do
•Don’t do
17
And Then There Are Waivers
• Waivers provide the option for tailoring “outside of process boundaries”–Waive compliance with required process–Based on a substantiated business case which
requires deviation from the standard–Approved by someone high enough in the
management chain to understand the implications• If you define your process set correctly, waivers
should rarely be needed–All the common tailoring should be pre-defined,
balanced, with the trade-offs well understood and accepted
–Waivers should definitely be the exception rather than the rule
18
IIS Process Right-SizingSpecial Cases
19
Special Cases
• Special circumstances require special methods–Maintenance of production systems–Web / Rapid Application Development (RAD)
• A separate lifecycle methodology is applied–Pre-tailored to address the special circumstances
with just the right amount of process in all the right places
–Project sizing is not used to determine tailoring because the lifecycle is pre-tailored
–Less project-by-project options means simpler to plan
Process Costs Risk of Failure
20
2003 Distribution by Project Size
MINOR7%
SMALL19%
MEDIUM9%
LARGE10%
UMBRELLA46%
WADM9%
21
Maintenance Umbrella Projects 1 of 4
• Covers “level of effort” maintenance work efforts– Application systems in production– Supported by pre-allocated labor pool of
experts– Budgeted on an annual basis
• Each new customer request is either– New or changed requirement– Reported system defect– Service request (data load, table change,
etc.)• Groups minor-sized work efforts occurring
within a specified period of time, range of hours, and/or cost amount– Annual renewal– Pre-determined fixed cost (e.g. 500 hours)– No upper limit on aggregate work covered,
only on each discrete work effort• Special maintenance umbrella project plan
template
22
Maintenance Umbrella Projects 2 of 4
• Addresses a collection of minor work efforts on production systems which are related in one or more ways–Common customer–Common system–Common hardware–Common support organization
23
Maintenance Umbrella Projects 3 of 4
• Allows for the one-time definition of a standard approach pertaining to all of the related work efforts–Common roles and responsibilities–Common PPQA approach–Common CM approach–Common RM approach–Common RSKM approach–Etc.
• Requires more process than any single minor work effort, but less than if all work performed were treated as individual minor projects–Recognizes that more process is needed to protect
production software than is required for minor work efforts
–Better protection for less cost
24
Maintenance Umbrella Projects 4 of 4
• Work requests which size as larger than Minor are spun off as separate projects–Separate project plan–Separate funding–Separate QA–But can still use common CM, RSKM, etc.
Customer Request
Sizing Process
Minor
Not Minor
25
Eat at Joe’s
Reg. Double 1/3 lb
Hamburger
Soy-burger
Small Medium Large
Soda (coke, orange, root beer, sprite)
Milkshake (chocolate, vanilla)
Malted (chocolate, vanilla, peanut butter)
$1.25 $1.75 $2.50
$1.05 $1.50 $2.00
$ .75 $ 1.25 $ 1.85
$ 1.75 $ 2.25 $ 3.00
$ 2.25 $ 2.75 $ 3.50
26
Jo’s Estimating Table
Simple Average Complex
DB Segment Change
DB Segment Add
Screen Change
Screen Add
Screen Delete
10 hrs 15 hrs 25 hrs
15 hrs 20 hrs 30 hrs
20 hrs 30 hrs 50 hrs
30 hrs 45 hrs 60 hrs
10 hrs 15 hrs 20 hrs
DB Segment Delete 10 hrs 12 hrs 15 hrs
< 5 elmts < 10 elmts < 20 elmts
27
Umbrella Special Tailoring Example
Standard process–Must perform a Post-Implementation Evaluation (PIE)
n days following implementation
Umbrella process–Allows for the “bundling” of multiple small changes
into quarterly PIEs instead–Major changes are still be evaluated separately
28
Web Application Development
Unique set of problems and opportunities
Q: How do you marry structured process to the agile philosophy?
A: Very carefully!!
29
Basic Terminology
• WADM™ – Web Application Development Methodology– A lightweight, rapid application development process for use in
web application development, which is SW CMM / CMMISM level 3 compliant
• Lightweight – Minimal amount of intermediate “stuff”
– Steps– Artifacts– Reviews
• Rapid application development– A series of short, incremental development cycles
• Web application– An application, possibly linked to one or more databases, which
uses the web as the user interface• SW CMM / CMMISM level 3 compliant software development
methodology – A structured set of processes and procedures, which has the
goal of reliably producing high quality software and other work products, on schedule, and within cost.
30
WADM™ Overview 1 of 2
• The WADM™ is a full lifecycle process for web development projects, and for non-web development projects having similar characteristics
• It calls for a high level of customer involvement, short development cycles, and rapid development.
• General criteria for using the lifecycle– A high degree of customer involvement– Sufficient size and work scope to allow functionality to be
allocated to progressive production releases– Simple design– A requirement for rapid delivery of functioning releases (get
something up and running quickly)– The overall program can be compartmentalized into stand-alone
projects with small teams of developers
31
WADM™ Overview 2 of 2
• The WADM™ is not appropriate if the project– Has high algorithmic
complexity– Involves integrated
database design– Is solely maintenance– Has low customer
involvement– Involves conversion or
platform migration – Must be implemented as a
whole, at one time– Cannot be divided into
coherent functional units that can be implemented in successive releases
– Plans to subcontract all or a portion of the work
Read the label!
32
WADM™ Key Elements
• Customer Focus– Customer has ownership of, and a high degree of visibility into, the
project.– High level of customer commitment and involvement in the
development team. – Customer can add, delete, modify and/or reprioritize functions as the
application is being developed. – Meets customer’s real demand due to the customer’s degree of
influence and control over the development effort.• Short Time Span
– The development cycle is divided into successive, short-duration builds.– The first build and each successive build are usable.
• Low Cost– No unnecessary functions are allowed. Functions that are not required
are not developed. – Project documentation and reviews are minimal.– Works with virtual teams.
• Produces High Quality Product– Product has minimum number of defects. – Testing and defect prevention are integral to the process.
33
WADM™ Structure 1 of 5
Development Cycles
ProposalPhase
StartupPhase
Kick Off Activities•Project Plan•Form Team Activities•Kick Off Meeting
Proposal•SOW
• XXX• XXX
•Budget• XXX• XXX
•Schedule• X-----
• X----- Startup Meeting• Elicit Initial Set of
Use Cases and Constraints
• Initial Release Plan
Release 1.0
Releases of Usable Software
DevelopmentCycle 1
Release 2.0DevelopmentCycle 2
Release n
Release n-1
DevelopmentCycle n
DevelopmentCycle n-1
Additional Development Cycles
34
WADM™ Structure 2 of 5
AcceptanceTesting
AcceptanceTest
Development
CompletedBuild
DevelopmentCycle
Design CyclePlanningMeeting
DesignCycle
Construction
StandupMeeting
ConstructionCycle
ThePlanning
Game
ProposalPhase
StartupActivities
35
WADM™ Structure 3 of 5
AcceptanceTesting
AcceptanceTest
Development
CompletedBuild
DevelopmentCycle
Design CyclePlanningMeeting
DesignCycle
Construction
StandupMeeting
ConstructionCycle
ThePlanning
Game
ProposalPhase
StartupActivities
AcceptanceTesting
AcceptanceTest
Development
CompletedBuild
AcceptanceTesting
AcceptanceTest
Development
CompletedBuild
DevelopmentCycleDevelopmentCycle
Design CyclePlanningMeeting
DesignCycle
Design CyclePlanningMeeting
DesignCycle
Construction
StandupMeeting
ConstructionCycle
Construction
StandupMeeting
ConstructionCycle
ThePlanning
Game
ThePlanning
Game
ProposalPhase
StartupActivitiesStartup
Activities
• Three nested cycles of iterative activities:– The Development Cycle– The Design Cycle
– Enclosed within the Development Cycle
– The Construction Cycle– Enclosed within the Design Cycle
• Every cycle in the WADM™ begins with a planning / management meeting followed by the work activities of the cycle.
• WADM™ projects are typically composed of several sequential Development Cycles
• Project Management, Risk Management, Issue Management, Requirements Management, Configuration Management, and Measurements & Analysis activities occur throughout
36
WADM™ Structure 4 of 5
• Development Cycle– Objectives
– To ensure that the customer needs are understood by all parties (identify customer requirements)
– To ensure that the customer needs are prioritized by the customer
– To ensure that the customer needs are met (validate and verify the requirements)
– Duration: ~ 1 Month– no Development Cycle
should exceed six weeks in duration
– Made Up of:– 1 Planning Game– 3-5 Design Cycles
• Design Cycle– Objectives
– To design an application capability to meet a selected subset of the customer requirements
– Duration: ~1 Week– Made Up of:
– 1 Design Cycle Planning Meeting
– 4-5 Construction Cycles
1 Cycle ~Every Week
1 Cycle ~Every Month
37
WADM™ Structure 5 of 5
• Construction Cycle– Objective
– Code and Unit Test Modules of the Application of the Design Cycle
– Duration: Daily– Made Up of:
– Daily standup meetings– Daily construction activities– Continuous integration
1 CyclePerDay
38
Planning Game’s 5 Standard Moves
IdentifyUse Cases Estimate
Use CasesPrioritizeUse Cases
PlanIterations Commit to
ReleasePlanBusiness
Team Members(The Customer)
DevelopmentTeam Members(The Developer)
BusinessTeam Members(The Customer)
DevelopmentTeam Members(The Developer)
ProjectGoals
ProjectConstraints
Complexity
Risks
BusinessNeeds
LoadingFactor
ReleasePlan
1
2
3
4
5
39
WADM™ Plow-Back
AcceptanceTesting
AcceptanceTest
Development
CompletedBuild
DevelopmentCycle
Design CyclePlanningMeeting
DesignCycle
Construction
StandupMeeting
ConstructionCycle
ThePlanning
Game
ProposalPhase
StartupActivities
New and Deferred Use Cases
40
WADM™ QA
AcceptanceTesting
AcceptanceTest
Development
CompletedBuild
DevelopmentCycle
Design CyclePlanningMeeting
DesignCycle
Construction
StandupMeeting
ConstructionCycle
ThePlanning
Game
ProposalPhase
StartupActivities
QAProject Plan &
Schedule Review
QAConsultatio
n
SQAEnd of Cycle
Review
SQAEnd of Cycle
Review
SQAEnd of Cycle
Review
QAEnd of Cycle
Reviews
41
WADM™ Defect Management
• defect avoidance –A practice where the focus is to minimize the number
of defects created during the construction of a work product.
– It avoids the creation of the defect in the first place. • defect detection and resolution
–A post-construction activity to identify and disposition the defects which were created during construction.
– It identifies and resolves defects that were created despite the project’s defect avoidance practices.
• defect management approach –Defines both the defect avoidance and the detection
& resolution processes to be followed by the project team.
– It also defines the criteria for deciding which processes are to be applied for each work task.
AGILE
CMMIS
MWADM™
42
WADM™ Minimum Deliverables 1 of 3
Phase Minimum Required Deliverable/Work ProductFeasibility(Proposal)
High Level Statement of WorkHigh Level Estimate
Start Up Activities
Project Plan*, includingStatement of WorkEstimated CostHigh Level ScheduleDesign and Code StandardsTeam Operating Rules
Initial Use Case-Based Requirements Document*Initial Use CasesDesign Constraint Based Requirements
Initial Release Plan (found in Use Case Based Requirements Document*)Detailed Loaded ScheduleCommitted to by Business Team Members and Developers
Initial List of Risks*Initial List of Issues*
* WADM™ Template required
43
WADM™ Minimum Deliverables 2 of 3
Phase Minimum Required Deliverable/Work ProductDevelopment Cycle: Planning Game
Updated Risks*, Issues*, Action Items*Use Case Based Requirements Document*
Use Cases, Estimates, and Design Constraint Based RequirementsUpdated Release PlanAcceptance Test Scenarios (Inspection, Procedural, & Automated)
Use Case Estimate and Rationale Document*
Development Cycle:Design and Construction Sub-Cycles
Updated Risks*, Issues*, Action Items*Design
CRC CardsUML Graphics
Unit Test PlansUnit Test resultsConfiguration Management
Code migrated from Working to Released to Submitted for Acceptance Testing
* WADM™ Template required
44
WADM™ Minimum Deliverables 3 of 3
Phase Minimum Required Deliverable/Work ProductDevelopment Cycle:Test
Updated Risks*, Issues*, Action Items*Test Class UpdatesTest Procedure Document UpdatesUse Case Test Scenario Result Summary Log*
End of Development Cycle
Approved SoftwareConfiguration Management
Code migrated from Submitted to Approved (in production)Updated Use Case Based Requirements Document*, if changedUpdated Release Plan, if changed
* WADM™ Template required
45
WADM™ Process Tailoring 1 of 2
• WADM™ is a pre-tailored version of the IIS process set – Specific to the rapid development / agile environment– All team members need to be trained in this methodology
• Normal processes apply . . . except where superceded explicitly by WADM™ processes– Project planning checklist does not apply– Size-a-matic™ tool does not apply
• Prescribed templates– Boilerplate text must be followed as is – Required WADM™ Templates
– Project Plan – Use Case Based Requirements Document – Risk Management Log – Issue Management Log – Use Case Estimate & Rationale Document – Use Case Test Scenario Results Summary Log– Action Tracking Log
46
WADM™ Process Tailoring 2 of 2
• There is very little additional tailoring that the individual project can perform– Decision on the use of CRC cards, UML, or both– Choice of defect avoidance alternatives– Choice of defect detection approaches– Identification of any project specific standards and tools– Production implementation approach and deployment strategy
• The WADM™ is agile, but not flexible– Most flexibility has been tailored out of the WADM™
– To decrease documentation needs– To ensure SW-CMM / CMMISM conformance
– The WADM™ must be used as is
47
IIS Process Right-SizingSummary
48
Experiment
49
Summary 1 of 6
• One size does not fit all– It never has, and never will!–And even if it did, different situations call for different
dress …
50
Summary 2 of 6
51
Summary 3 of 6
• Look for the Rosetta Stone to your environment–Analyze your project types–Maybe effort is not the driver for your process
tailoring decisions, but something is …–Develop varied and flexible approaches that match
your business needs
52
Summary 4 of 6
Tame that SW-CMM / CMMISM monster–Turn it into
something that your programmers and engineers will relate to
53
Summary 5 of 6
• Apply the intelligence principle to your process definitions–What is the purpose of all this?–You don’t have to follow the SW-CMM or the CMMI
slavishly at the sub-practice level … meet the intent– If you have families of projects, customize your
process definitions to make planning them easier• Allow your projects to apply the intelligence
principle as well–Keep your eyes on the prize: better run and more
predictable projects that meet your customers needs–Avoid process for process sake
54
Summary 6 of 6
Trust in the Force …but make it easy to comply!