in god’s hands service camp 2013 attended by ruth, barb, carrie, gilda, patty, martha

Post on 23-Feb-2016

20 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith, Paul R., Ayars Parker, Kevin, James, Hunter and Chaplain, Jane. JUNE 17 -21, 2013. “Let each of you Look not to your own interests, But to the interests of others.”. GOOD FELLOWSHIP ROOM - PowerPoint PPT Presentation

TRANSCRIPT

IN GOD’S HANDSSERVICE CAMP

2013Attended by

Ruth, Barb, Carrie, Gilda, Patty, MarthaKarl, Keith, Paul R., Ayars

Parker, Kevin, James, Hunterand Chaplain, Jane

JUNE 17 -21, 2013

“Let each of youLook not to your

own interests,But to the interests

of others.”

GOOD FELLOWSHIP ROOMSince it was raining at 8:00 AM, plans were

discussed early Monday morning

Mr. & Mrs. Curtiss’ Home

Build a handicapped ramp & deckReplace the rotten boards on the shed

Paint the new boards on the shedPaint the windows

Paint the cinder blocks around the house

The Curtiss’ home before we began

Karl scraped the siding before it needed to be painted.

Gilda paints

Carrie mostly paints the building

Meanwhile, the fellas are working on the old steps.

Ruth and Carrie give the shed a coat of paint.

Lunch break with Jane bringing us the message.

Posts were set in concrete and made level.

James supervises the mixing of the concrete.

Painters clean up the brushes, but not themselves.

Karl replaces the trim on the shed.

Building the supports for the deck and ramp

Putting the decking down

Keith and James creating the ramp

James testing out the deck while Gilda and others watch.

Carrie painting the foundation

Ruth found it necessary to trim the bushes before painting the foundation.

Karl & Kevin measuring to replace boards.

Putting the decking down.

Using their feet to hold boards in place

Parker & Keith setting the rest of the ramp.

Getting ready to put on the railings

Ruth, Kevin, & Martha finishing the ramp.

The decks and ramps finished.

Parker & Keith measure for the railings

Gilda painting under the eaves

Cutting the boards to fit properly

Ayars making adjustments underneath the deck

Creating the steps that go toward Mr. Curtiss’ workshop

Sue Anne dropped by for a visit

Ms. Mayflower’s Home

Gutters on the back of her house

Covered the eaves on the porch we built two years ago

Placed flex hoses and splash guards

Materials ready for the other site

Kevin takes a nap while waiting for the homeowner.

Gutters put up and drain pipes set in place

Work began at the second site

Kevin and Karl placing the gutters

Flex hoses are attached to the downspouts

Splash guards are placed on others.

Finished job

A visit to the Charles City dump to get rid of our site trash

Project finished

In front of the newly painted shed

Ms. Brown’s house

August 22, 23, & 25 & 30

Ruth AdamsKevin Cornelius

Keith FuhrmeisterAyars Lore

Martha Martin

Two full days & two part days

Remove everything from her enclosed porch.Pull out the flooring.

Replace the floor joists.Cleaned the furniture, including freezer

Repair the washer connectionsReplace the sub-floor & floorRepair & replace ceiling tiles

“Hand me one of

those…..”

Measuring and setting the joists

for the floor.

Tools ready to be used in repairing the

floor.

Ruth standing next to a recently

cleaned door.

Painting the Education Wing

September 3 – 4 – 5Take everything off the walls of the hall

Paint the entire hall, including doorway trimsPaint Primary Classroom

Paint Mary Minter ClassroomPaint lower half of Good Fellowship Room

Replace switch plates overall

Karl prepares the hall to be painted.

Painting the hall

Finishing touches and clean-up

THANK YOU

CONGREGATION FOR THE FUNDINGPAINTERS:

Ruth Adams Marian Davis Paul Davis Karl Dydak

Ayars Lore Barbara LoreMartha Martin

top related