INDONESIAINFRASTRUCTUREINITIATIVE
IndII T281.02Integrated Urban Road Safety Program (IURSP)Community Consultation
Greg RoweVicRoads International Projects 12 February, 2015
2
Level of Consultation
3
Planning for Consultation •The planning phase can include obtaining information from the community or stakeholders that will assist with developing the project & identify issues early
•Example - conducting a survey of schools within an area to ascertain student travel data & local information to assist with infrastructure development.
4
First Steps • Investigate stakeholder issues & prepare for consultation•Brief the Dept of Education & schools about the proposed project and seek any initial feedback. •Seek support for the survey •Inform, Consult & Engage them!
5
Who Can Conduct the Survey?
Options are:
• Organize an independent local organization (research organization?) to assist with the data collection
• Use local government resources?
• The school or local university could conduct the survey using their students?
6
Data collection
•Number of students at the school
•Modes of travel to/from school (walk, bus, motorcycle, car)
•Locations of students' homes (distance from school)
•Parking areas in and around schools
7
Data Collection•Drop off/pick up zones
•Number & location of crossings & supervisors
•Numbers of students (and others) using the existing crossings
•Key locations around the schools where pedestrians cross roads not at established crossings
•Speed zones in area
8
Stall Holder Survey on Jl. Ahmed Yani BandungAims1. Audit of stalls (locations, dimensions)2. Inform & get feedback to improve pedestrian access &
safety
Handout Questionnaire & Flyer
9
Conclusion• During the planning phase of the project you can start
some consultation processes such as informing stakeholders and conducting surveys.
• Remember projects should involve: