INTRODUCING PROCESS MINING

Three experimental case studies

Stijn van Schaijk, Léon van Berlo

SLIDESHARE.NET/BERLOTTI

SLIDESHARE.NET/STIJNVANSCHAIJK

https://nl.linkedin.com/in/stijnvanschaijk

THREE CASES

Introducing process mining for AECFM

PLAN

Analysis of the design process of a road project

System engineering managing desing requirements

Event log export from Relatics

± 140.000 events

Introducing process mining for AECFM

MOST EXTREME RESULT:

1 SPECIFICATION HAD 1904 PROCESS STEPS

CONSTRUCTION

Continuous improvement cycle during construction projects

Plan, (Autonomous-) Capture, Analyse and Reuse process data from

construction sites

Finding and storing bottlenecks and planning deviation

ALL DATA AVAILABLE on

https://github.com/openBIMstandards/DataSetSchependomlaan

1. SCAN CONSTRUCTION SITE WITH DRONES (DREAMFOCUS DRONED

HTTPS://WWW.YOUTUBE.COM/WATCH?V=QBBF31BY0XW )

RESULT: AS-BUILT POINT CLOUD

COMPARE AS-PLANNED AND AS-BUILT

CONCRETE FLOORS

AGAIN: https://github.com/openBIMstandards/DataSetSchependomlaan

PLANNING CONSULT

RISK VISUALIZATION

OPERATE

Analysing Facility Management software Planon

Large hospital in the Netherlands

Paper: http://www.slideshare.net/StijnvanSchaijk/case-study-process-mining-

with-facility-management-data

Introducing process mining for AECFM

FOR EXAMPLE:

It was found that in 2414 cases the problem was solved

within a median duration of 3 minutes. Which is, accordingly

to the facility managers, practically impossible.

More specific this means that within 3 minutes an error is

assigned to a person and he almost immediately solved it,

which is only possible if he was on the exact location of the

error at the moment of assigning.

This notification led to a deeper research in this process. In

seemed that for this 3 minute job an average price of 300

euro was charged by the subcontractors (in total €723.600,-).

Introducing process mining for AECFM

CONCLUSION

Process mining gives insight in processes

Learn from previous projects.

Finding bottlenecks and planning deviation.

Introducing process mining for AECFM

STIJN’S WORK:

Tools

Eventlog generator: https://www.youtube.com/watch?v=LOJsHvGq-KE

Planning consult: https://www.youtube.com/watch?v=nJTh_0Xmra0

Thesis

http://www.slideshare.net/StijnvanSchaijk/building-information-model-bim-

based-process-mining

Introducing process mining for AECFM

THANK YOU FOR YOUR ATTENTION

top related