ishan chandra nagar gram panchayat of dukli rd · pdf file11 anganwadi centers and 7 asha...

Post on 24-Mar-2018

223 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

ISHAN CHANDRA NAGAR

Gram Panchayat

of Dukli RD BlockAn Adarsh Gram

Under SAGY

IC Nagar GP

Ishan Chandra Nagar GP

• IC Nagar is one of 5 nos. GPs under Dukli

RD Block

• 6 Km border with Bangladesh and 2.5 Km

with Agartala Municipal Corporation

• Name of the MP(RS) :- Smt Jharna Das

Baidya

• Main occupations are agriculture and

fishery.

Ishan Chandra Nagar GP

• Number of Wards : 08

• Number of Villages : 14

• Name of the villages:

Vidyasagar Palli D block, Vidyasagar Palli C

block , Vidyasagar Palli A block, Vidyasagar

Palli B block, Durga Colony, Madhupur,

Nishchintapur, Kismatkuri, Maujkuri, Haripur,

Mantali, Muchitala, Koshinagar, Uttar

Madhavpur.

Geographic Information

• Geographical Area :610 Ha.

• Cultivable land :326 Ha

• Net sown Area :284 Ha

• Area Under Single Crop :166 Ha

• Area Under Double Crop :96 Ha

• Area Under triple Crop :22 Ha

• Gross cropped area :424 Ha

• Cropping intensity :149%

Geographic Information

• Current Fellow Land :42 Ha

• Area under non-agricultural use :167 Ha

• Number of farmers :685 Ha

• Number of DTWs :2 Ha

• Amon paddy area :116 Ha

• Boro Paddy area :225 Ha

• Vegetable area :46 Ha

• Other crops area :9 Ha

• Rubber & Misc area :117 Ha

DEMOGRAPHIC SCENARIO

• Total Population :6390

• Number of households :1653

• Male :3198

• Female :3192

• SC Households :354

• ST Households :03

• OBC Households :1074

• Other Households :208

• No. of eligible HH for pension (Old age, widow, disability):687

• No of HH receiving pension Old age, widow, disability):439

DEMOGRAPHIC SCENARIO

No. of house hold eligible for Ration Card :1581

No of house hold under RSBY : 1186

No. of HH having MGNREGA Job cards :1269

No. of BPL Families :687

No. of Land less Families :05

No. of IAY beneficiaries :211

No. of community sanitary complexes :01

Total number of persons with disability in the village :21

Number of SHGs :32

Educational Institutions• Schools

Primary Schools(Govt) :04

Secondary Govt. Schools :03

Higher Secondary Private Schools :01

• ICDS

Number of Anganwadi centers :11

• Sports Facilities

– Play Grounds :04

Coverage of Villages under

different Facilities & services

• Piped Water Supply :Covered

• Hand Pump Coverage :Covered

• Covered Drains :Not Covered

• Coverage under open drains

:Not Covered

• Village HH Electricity Connected

:1502

• Not connected :141

District Level Committee

1 Smt. Jharna Das Baidhya , MP, Rajya Sabha Chairperson

2 Sabhadhipati, PTZP. Member

3 Chairman , Panchayat Samity , Dukli. Member

4 District Magistrate & Collector , West Convener

5 PD DRDA West Member

6 Sr Deputy Magistrate (O/C Dev) O/o the DM & Collector (West). Member

7 Dy. Director, Agriculture Member

8 Dy. Director, Horticulture Member

9 Executive Engineer RD Agartala Div-1 Member

10 Executive Engineer, Water Resource Agartala Div-1 Member

11 Executive Engineer, DWS Agartala Div-1 Member

12 Executive Engineer, PWD (R&B) Agartala Member

13 Member Secretary DWSC Member

14 Chief Medical Officer West Member

15 Supdt. Of Sericulture, Agartala. Member

16 District Education Officer, West Member

17 Dy Director A Member

18 Lead District Manager, UBI, West Member

19 District Welfare Officer, West Member

20 District Forest Officer , West Member

21 Dy, Director , Fishery Member

22 Managing Director, TSCB Member

23 AGM SBI Member

24 Chairman TGB, Head Office , Abhoy nagar Member

Village Development Plan:

Targets & Achievements

Agriculture

Sl

No.

Area

of

Work

Sector Schemes Line

Dept.

Budget Status

1 Econom

ic

Develop

ment

SRI

Total=260 Ha

Agri. 10.19 lakh Completed

2 KCC Agri. 50 nos. Completed

3 Fruit Plantation Agri. 2 lakhs Completed

4 Soil Testing and

Fertilizer

Application

Agri. 400 nos. 200

5 Installation of

MDTW

Agri. As per

schematic

Provision

Completed

6 Farmer training

on SRI and Oil

Seed

Agri. 0.10 lakh

0.24 lakh

Completed

AGRICULTURE

Main crop is Paddy. 72 Ha SRI cultivation, 18 HaHorticulture plantation completed

Plan for 1 custom hiring center Rs.9 lakh Govt Subsidyand 1 lakh SHG Subsidy (National Mission onAgriculture Extension and Technology , NMAET)

Fishery

Total no.

of

Farmers

Total Water

area

Water area

utilized for

fish culture

Total area

created

during 14-15

Water area

reclaimed

during 2014-

15

Nos. Area Nos. Area Nos. Area Nos. Area

260 263 34.39 224 30.23 37 4.24 33 3.84

AGRICULTURE & ALLIED ACTIVITIES

100 beneficiaries trained on special development of fisheries Plan - Reclamation of 12 no of old water bodies and

production of IMC (Indian Major Carp) fingerlingTechnical support on dairy and poultry developmentPlan - Brooder House for Low input technology (LIT)

birds through MGNREGA is under construction

Veterinary Sub

Center

Sl. No. Name of the scheme TargetOut lay

( in lakh)Progress

1 Distribution of Aerator 2 nos. 0.80 Not yet started

2 Distribution of cast net & Aluminum Hundi 25 nos. 0.75 Not yet started

3 Distribution of pawn seed 30 nos. 0.175 1 beneficiary covered

4 Distribution of 3HP pump set 15 nos. 2.70 Not yet started

5 Composite fish culture 25 nos. 4.725 2 beneficiary covered

6 Semi-intensive fish culture 15 nos. 3.85 Not yet started

7 Production of IMC fingerling 15 nos. 0.99 Not yet started

8 2-days training camp with fish farmers 2 nos camps with 150

nos. farmers

0.525 14 beneficiary

attended training

9 Reclamation of old water bodies 12 nos. (0.96 ha) 6.00 Not yet started

Total 20.512

Sl. No Other works taken up by Fishery Department Amount involved Progress

1 Pisciculture in small tank 0.21876 3 beneficiary covered

2 Feed based intensive fish culture 0.4885 01

3 Distribution of prawn seed 0.0095 01

4 Supply of pabda seed 0.0065 1

5 Pisciculture by PDF 0.18 3

6 Entrepreneureship development among SHG through scientific fish culture 0.556 2 nos SHG covered

7 Pisciculture in big water bodies 0.746 01 (area 2.00 ha)

8 Social development programme(Pisciculture)@ Rs.6000 per unit 6.00 100 beneficiaries covered

District Water Sanitation

S SchemesBudget

(in Rs)Progress

1 Repair of pipeline= 5000 mtr. 250000Ongoing

2 Extn. Of Pipeline= 4550 mtr. 1137500On going

3 Sinking of SBDTW 4nos. 1400000Not Started

4 Const. of OHP 312000Not Started

5 Sinking of DTW=1 no. 3500000 Not Started

6

Construction of IHHL 1860000155 nos. are going

to complete by

15th April 2016.

Then it will be fully

covered

ARDD Deptt.

Sl.

no.

Scheme No of unit Unit cost Progress

1

Calf Growth meal under

Heifer rearing scheme8(Eight) Feed @ Rs.17 per

Kg

Feed being supplied to the cross

breed heifer on 50% subsidy

2

Milch Ration scheme

under RKVY20 nos.

Beneficiaries

Feed @ Rs.17.75

per Kg

Feed being supplied to the milch

cow on 25% subsidy

3

Poultry development

scheme9(Nine) Rs.900(Govt share)

Rs.300(Beneficiary

share

15 nos LIT poultry bird has been

distributed

4

NMPS-Piggery scheme One cluster of 100

unit

Rs.1.71 lakhs for

one cluster

Beneficiary for 100 sow selected

5Cultivation of Green

Fodder under RKVY1(One) Rs.4600 per unit Completed

6

Cultivation of cowpea for

seed production under

RKVY

1(One) Rs.3600 per unit Ongoing

7Rural Backyard Poultry

under NLM4(Four) Rs.3750 Ongoing

8

Construction of block

level Brooder House

under MGNREGA

1(One) Rs.13.97 lakhs One Brooder house will be

constructed

PWD Dept.Sl

no

Area of Work Sector Budget (in

Rs)

Completio

n timeline

Status

1 Kismatkuri Purba Para

house to Dilu Roy house

Infrastructu

re

30.00 9 month Estimate

submitted

2 Kismatkuri Purba

Subrata Biswas house to

Sudhan Roy house

Infrastructu

re

17.00 6 Month Estimate

submitted

3 Montali Nidhan Chodhury

house to Prabir Sarkar

House

Infrastructu

re

20.00 6 Month Started

4 Kashigar Tri-Ratna

Sangha to sushil roy &

Phanibhusan Sarkar

House

Infrastructu

re

45.00 12 Month Started

5 Uttar Madhav pur Anima

Sarkar house to

Apuranjan Choudhury

house via Sabuj Sarkar

house Border road

Infrastructu

re

45.00 12Month Started

Water Resource Department

Sl.no

Schemes Budget(Rs inlakhs)

Progress

1By Commissioning Tube well

at Madhav Pur-II30 lakhs Work Started

2By Commissioning Deep Tube

Well at Muskuri30 lakhs Work Started

3

By Commissioning of low

height pick up weir at Rayer

L.I Scheme

9 LacsWork will start

Shortly

Extension of PVC pipe line atWork Will Start

HEALTH

3 Health sub centersTripura Medical College (nearby)100% institutional deliveryImmunization of 0-6 age group- 100%0-6 age group children under ICDS coverage-100%11 Anganwadi Centers and 7 ASHA workers1141 nos. RSBY beneficiaries

Banking Sectors

Sl.Area of

WorkHow? [Scheme(S)/ Strategy] Progress as on date

1Financial

Inclusion

The village has a population of 5944 persons

with around 1643 households. Under One-

Family-One-Account Cocept, 100% of the

families have at least one Bank account.

All families have bank

accounts

2Benefit

Transfer

One ultra small branch with fixed point BC of

United Bank of India at Panchayet Office exists

making receipts from & payments to

beneficiaries.

United Bank of India

3 Insurance 3-4 Sensitization Camps2 camps done, remaining

planned in coming months

Education

Sl. No Schemes Mile stones Progress

1 RMSA

125 nos. of benches for IC Nagar JB

School, RK Gange High School,

Vidyasagar Palli High School,

Madhabpur High school.

Work will

start

Shortly

1 primary teacher in RK Gange High

School, 2 primary teacher in Vidyasagar

Palli High School

Work will

start

Shortly

Dining hall in for IC nagar JB School, RK

Gange High School, Vidyasagar palli

High School, Madhabpur High school

Work will

start

Shortly

2 Literacy100% Literacy Totally

Covered

NERLPActivities Progress

Total Number of household 1642

No of SHG formed 35nos

Number of house hold covered by forming SHGs 375nos

Major Activities a) Piggery (b)Diary(c)Poultry

(d)Agriculture (e)Horticulture (f)Petty

business (g) Mushroom cultivation, etc

Financial assistance from NERLP

SL.N

o

Grants/Funds from

NERLP

Amount

(in Rs)

No. of SHG's

received funds

Total Amount

(in RS)

1 Seed Fund 20,000.00 16 3,20,000.00

2 Livelihood Fund T1 40,000.00 8 3,20,000.00

3 Livelihood Fund T2 40,000.00 1 40,000.00

Grand Total 6,80,000.00

NERLP

Activities taken up:

• Organizational Management Training.• SHG leaders training.• Training on books and records update.• Training on business plan preparation (micro

credited plan).• Handhold support to the SHGs through bank

facilitators, SHG facilitators and Area coordinators.

• Livelihood training like piggery, diary, fishery, poultry etc.

NORTH EASTERN RURAL LIVELIHOOD PROGRAMME (NERLP)

• 30 women SHGs newly formed under NERLP and revived 32 SHGs. The Target is to form/revive 102 total women SHGs by March 2016

• 1 SHG Federation has been formed as per the guideline of NERLP• Training on Mushroom cultivation given to 9 SHGs by Horticulture

department ; construction of 5 sheds in progress• Vermi-compost training provided for 1 SHG, planned for another 5

SHGs by the Horticulture Department

Construction Works Taken up

under SAGY

IC Nagar Gram Panchayat Office

Name of the Work:- VidhyasagarPalli D Block AWC under MGNREGA

Estemated cost:- 6.02 lacs .

Name of the work :-Construction of Mushroom Shed

Estimated cost :-Rs 0.75 lacs (10 .nos)

Name of the Work:-Construction of Vermi composting unit

Estimated cost :-0.5 lacs.

Name of the Work-Construction of Brooder House at R K Gange ARDD Office

Estimated cost :-Rs 12.44 lacs

Construction of Road Under PMGSY at

IC Nagar GP

Glimpses of SAGY meetings

THANK YOU

top related