JIT/Lean Production
Chapter 13
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 2
13 Chapter ObjectivesBe able to:Describe JIT/Lean and differentiate between the Lean philosophy and kanban systems.Discuss the Lean perspective on waste and describe the eight major forms of waste, or muda, in an organization. Discuss the Lean perspective on inventory and describe how a kanban system helps control inventory levels and synchronize the flow of goods and material across a supply chain. Describe how the concepts of the Lean supply chain and Lean Six Sigma represent natural extensions of the Lean philosophy. Explain how a two-card kanban system works. Calculate the number of kanban cards needed in a simple production environment. Show how MRP and kanban can be linked together and illustrate the process using a numerical example.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 3
13 Just-in time/Lean
Just-in-time – A philosophy of manufacturing, applicable to manufacturing and services based on planned elimination of all waste and on continuous improvement of productivity
Lean – A philosophy of production that emphasizes the minimization of the amount of all resources (including time) used in the various activities of an enterprise. It includes identifying and eliminating non-value-adding activities. © 2010 APICS Dictionary
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 4
13 Performance Advantage of a Lean Plant Circa 1986
Kicked off the JIT/Lean Production Revolution in the late 1980’s/early 1990’s
Figure 13.1
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 5
13 Lean Philosophy
The Lean philosophy can be applied to a wide range of production and service environments.
Companies following the Lean philosophy can and do use a wide range of planning and control techniques, not just kanban.
The Lean philosophy is consistent with business process improvement, quality improvement, and supplier management initiatives.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 6
13 Lean Waste
Lean Waste – Any activity that does not add value to the good or service in the eyes of the consumer. Called “muda” in Japanese Identification of lean wastes began with Taiichi
Ohno, a Toyota engineer.
© 2010 APICS Dictionary
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 7
13 Eight Lean Wastes
Overproduction Waiting Unnecessary transportation Inappropriate process Unnecessary inventory Unnecessary/excess motion Defects Underutilization of employees
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 8
13 Lean Perspective on Inventory
Triangles represent inventory between work centers A, B, and C.
The buildup of inventory hides problems (at a cost) that may occur.
Figure 13.2
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 9
13 Lean Perspective on Inventory
After a Lean transformation, wasted movement and space are eliminated and work centers are moved closer together.
Inventory levels are reduced dramatically and work centers make only what is needed when it is needed.
Figure 13.3
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 10
13 Lean Perspective on Inventory
Process of reducing inventory leads to reduction of the other “wastes” and exposes problems in order of severity (‘water and rocks’ analogy)
Figure 13.4
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 11
13 Recent Developments in Lean Thinking
Lean Six Sigma – A methodology that combines the organizational elements and tools of Six Sigma with Lean’s focus on waste reduction.
Lean Supply Chain Management – An extension of the Lean philosophy to supply chain efforts beyond production. Lean supply chain management seeks to minimize the level of resources required to carry out all the supply chain activities.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 12
13 Kanban System Kanban system – A production control approach that uses
containers, cards, or visual cues to control the production and movement of goods through the supply chain.
Key characteristics: Uses simple signaling mechanisms to indicate when specific items
should be produced or moved. Can be used to synchronize activities either within a plant or between
different supply chain partners. Are not considered planning tools, but rather control mechanisms that
are designed to pull parts or goods through the supply chain based on downstream demand.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 13
13 Kanban System
Two-card kanban system – Uses one card to control production and another card to control movement of materials.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 14
13 Kanban System for Two Work Centers
Figure 13.5
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 15
13 Release of Finished Materials from Work Center B
Figure 13.6
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 16
13 Pulling of Raw Materials into Production at Work Center B
Figure 13.7
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 17
13 Removal of Finished Materials from Work Center A
Figure 13.8
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 18
13 Two-card System Summary
A downstream system station pulls finished material out of work center B.
Work center B pulls raw material into production.
Demand for more raw material in work center B pulls finished material out of work center A.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 19
13 Pull System
Pull system – A production system in which actual downstream demand sets off a chain of events that pulls material through the various process steps. A kanban system is also called a pull system.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 20
13 Kanban System
Other signaling methods: Single-card systems Color coding of containers Designated storage spaces Computerized bar-coding systems
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 21
13 Controlling Inventory Levels Using Kanbans
Calculating the number of kanbans:
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 22
13 Kanban - Example 13.2
Determine the number of production cards needed using the following information:
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 23
13 Kanban - Example 13.2
Convert the number of kanbans into the number of subassemblies and hours work:
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 24
13 Kanban - Example 13.3
After a Lean initiative, the following improvements, were made: Production lead time has been cut from 2.6 hours
to a constant 1.6 hours. Demand from final assembly has been stabilized at
300 subassemblies per hour. Smaller, standardized containers that hold just 25
subassemblies are now being used.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 25
13 Kanban - Example 13.3
If the safety factor is reduced to 4%
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 26
13 Synchronizing the Supply Chain Using Kanbans
To synchronize the supply chain, there must be a smooth, consistent flow of material through the supply chain links.
Figure 13.9
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 27
13 Using MRP and Kanbans Together Example 13.4
Combine the planning capabilities of MRP with the control capabilities of kanban.
Figure 13.11
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 28
13 Using MRP and Kanbans Together Example 13.4
There is no projected ending inventory. Consistent with Lean philosophy of having no more
inventory in the system than is needed. Planned orders all occur in the same week as the planned
receipts. Because planning lead time is just 1.6 hours, orders
released in a week should be completed in that week. Planned order quantities can be used to calculate the
demand rates and kanban cards for each week.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 29
13 Using MRP and Kanbans Together Example 13.4
Calculate D values
Calculate the number
of production
cards
13 - 30Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall
JIT/Lean Production Case Study
Supply-Chain Challenges in Post-Earthquake Japan
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 31