joint content tiger team meeting

Post on 23-Feb-2016

21 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Joint Content Tiger Team Meeting. December 10, 2012. Agenda. Roll – Catlin Timeline Review – John and Eric Content Working Session – Eric/All Scope – Eric/All. The Deliverables. TBD by the Joint Content Tiger Team Implementation content specification Samples Test cases - PowerPoint PPT Presentation

TRANSCRIPT

Joint Content Tiger Team Meeting

December 10, 2012

Agenda

• Roll – Catlin• Timeline Review – John and Eric• Content Working Session – Eric/All• Scope – Eric/All

The Deliverables

• TBD by the Joint Content Tiger Team• Implementation content specification• Samples• Test cases• Executable test cases if needed• Implementation guide• Longer term: Content roadmap + C-CDA content implementation specification

DRAFT HARMONIZED CONTENT SPEC REVIEW

CURRENT SCOPE

Next Steps/Timeline

• 12/3/12: Review first draft and provide feedback by email prior to next call next week.

• 12/10/12: Review feedback; detailed working session to revised draft if/as needed. Identify any deltas prior to ratification.

• 12/17/12: Straw poll: Is the harmonized specification ready for ratification?

• Rest of Dec 12: Ratification (email vote perhaps).

Q&A

top related