(jsims)apps.dtic.mil/dtic/tr/fulltext/u2/a402117.pdf · 2011. 5. 13. · natsim nsa da jsigsim...
Post on 27-Oct-2020
0 Views
Preview:
TRANSCRIPT
8/4/00
1
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
Joint Simulation System(JSIMS)
Program Update
Ms Laura KnightSenior Civilian Official
DMSO Industry Days24 May 00
REPORT DOCUMENTATION PAGE Form Approved OMB No.0704-0188
Public reporting burder for this collection of information is estibated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completingand reviewing this collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burder to Department of Defense, WashingtonHeadquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision oflaw, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YYYY)24-05-2000
2. REPORT TYPEBriefing
3. DATES COVERED (FROM - TO)xx-xx-2000 to xx-xx-2000
4. TITLE AND SUBTITLEJoint simulation system (JSIMS) Program UpdateUnclassified
5a. CONTRACT NUMBER5b. GRANT NUMBER5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S)Knight, Laura ;
5d. PROJECT NUMBER5e. TASK NUMBER5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME AND ADDRESSJSIMSxxxxx, xxxxxxx
8. PERFORMING ORGANIZATION REPORTNUMBER
9. SPONSORING/MONITORING AGENCY NAME AND ADDRESSUnited States Department of DefenseDefense Modeling and Simulation Office1901 N. Beauregard St., Suite 500Alexandria, VA22311-1705
10. SPONSOR/MONITOR'S ACRONYM(S)11. SPONSOR/MONITOR'S REPORTNUMBER(S)
12. DISTRIBUTION/AVAILABILITY STATEMENTAPUBLIC RELEASE,13. SUPPLEMENTARY NOTES14. ABSTRACTDoD's "flagship" modeling and simulation program for the warfighters. Replace outdated Service legacy systems. Real-world C4Isystems...using common components. Distributed training...mission planning...mission rehearsal. Achieve the CJCS goal to "move moreelectrons and fewer troops.15. SUBJECT TERMS16. SECURITY CLASSIFICATION OF: 17. LIMITATION
OF ABSTRACTPublic Release
18.NUMBEROF PAGES13
19. NAME OF RESPONSIBLE PERSONFenster, Lynnlfenster@dtic.mil
a. REPORTUnclassified
b. ABSTRACTUnclassified
c. THIS PAGEUnclassified
19b. TELEPHONE NUMBERInternational Area CodeArea Code Telephone Number703767-9007DSN427-9007
Standard Form 298 (Rev. 8-98)Prescribed by ANSI Std Z39.18
8/4/00
2
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
What is JSIMS ?
• DoD’s “flagship” modeling and simulation program for the warfighters• Replace outdated Service legacy systems• Real-world C4I systems … using common components• Distributed training … mission planning … mission rehearsal• Achieve the CJCS goal to “move more electrons and fewer troops”
A Joint, interoperable simulation A collaborative effort of nine partner simulations
HLA
Army
Air ForceNavyMarine Corps
NSA DIA
NRO
Joint Staff
DMSO
CommonComponents
8/4/00
3
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
History
• Jun 94: JSIMS program initiated– Core significantly underfunded from the beginning ($60M)– Intelligence Agencies and Security not considered / included
• Dec 96: Revised MOA approved
• Oct 99: OSD Technical Review conclusion– Serious technical risks … management and funding problems
• Nov 99: DUSD(S&T) chaired a Senior Review Board– Made programmatic recommendations to USD(AT&L)
8/4/00
4
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
Recent events
• USD(AT&L) Acquisition Decision Memo (16 Dec 99)– Designate JSIMS an ACAT 1D Program– Change PEO from Air Force to the Army– Transition to High Level Architecture (HLA)– Rebaseline the program and revise the MOA– Development Agents report to new PEO
• Program rebaselined (Jan - Mar 00)– Cost, schedule, and performance revised– OSD “executive” sessions 29 Mar 00 and 5 Apr 00– PDUSD(AT&L) briefed 7 Apr 00– PDUSD(AT&L) memo, 19 Apr 00
• Directed FY 01-07 funding actions to “ fully fund the program”
8/4/00
5
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
JSIMS PMJSIMS PM
Technical Director
Technical Director
DirectorPM Support
Office
DirectorPM Support
OfficeAlliance
ExecutiveAlliance
Executive
Development Agents (DA)Development Agents (DA)
DIA DADOMINO
Navy DAMaritime USMC DALand DA
WARSIM/WIM
Joint DAJoint Models
DMSO DARTI
NRO DANATSIM
NSA DAJSIGSIM
W-IPTsW-IPTs
JSIMS Program Management Organization
AF NASM DANASM/JOISIM
8/4/00
6
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
Schedule
• IOC dates:– Dec 99: established by original MOA (‘94)– Apr 01: result of new APB/inadequate funding (‘98)– Nov 02: delay of “core” infrastructure / inadequate funding
• Mar 02: version release milestone (VRM) 1.0– Software ready for Service / Agency use
• Nov 02: JWFC conduct an initial Joint training event
Master ScheduleMajor MilestonesFederate IntegrationFederation IntegrationSystems TestVersion Release Milestone (V1.0)User Events - Demonstrations/Feedback - Functional Assessments - System Functional Assessment
- Post VRM System Validation Events
OT&E Events - EOA
- OA - MOT&E
IOC EventOSD MS III Fielding DecisionVersion Release Milestone (V2.0)Version Release Milestone (V3.0)
2000 2001 2002 2003 2004 200511 22 33 44 55
11 22 33 44 55
8/4/00
8
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
Elements to achieve success
• Partnership and trust are absolutely essential
• Integration demonstrated in small steps– Solve problems early– Build users’ and developers’ confidence early … and often
• Defense Modeling and Simulation Office– Now a partner for developing High Level Architecture (HLA)– HLA is the key to success
• Basic software fundamentals– Data flow analyses … early prototyping … risk mitigation plan
8/4/00
9
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
DomainDomainFederateFederate
BattlespaceBattlespaceWorkstationWorkstation C4I AdapterC4I Adapter
AAR DataAAR DataCollectorCollector
The Network
Major Federates and Their Parts
DomainModel
SNE
CASS
MDDI
WorkstationApplication
SNE
CASS
Data Store
DataCollector
Local RTILocal RTIComponentComponent
Local RTILocal RTIComponentComponent
Local RTILocal RTIComponentComponent
Local RTILocal RTIComponentComponent
Sim Sim Engine APIEngine API Sim Sim Engine APIEngine API Sim Sim Engine APIEngine API Sim Sim Engine APIEngine API
HLA APIHLA API HLA APIHLA API HLA APIHLA API HLA APIHLA API
Sim Sim EngineEngine Sim Sim EngineEngine Sim Sim EngineEngine Sim Sim EngineEngine
C4IAdapter
SNE
CASS
MDDI
8/4/00
10
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
Security Federation Connector
Low Network High Network
Local RTILocal RTIComponentComponent
Sim Sim Engine APIEngine API
HLA APIHLA API
Sim Sim EngineEngine
Local RTILocal RTIComponentComponent
Sim Sim Engine APIEngine API
HLA APIHLA API
Sim Sim EngineEngine
High SideInterface
Low SideInterface
Provides Low to High Transfer
JSIMS
Domino
-Low
Domino
-Low
JOISIM
JOISIM
JSIM
S-Mari
time
JSIM
S-Mari
time
NASMNASM
WIM-Lo
w
WIM-Lo
w
WARSIM
WARSIM
Domino
-High
Domino
-High
JSIG
SIM
JSIG
SIM
NATSIM
NATSIM
WIM-H
igh
WIM-H
igh
SNE Server
SNE Server
SNE Server
SNE Server
Exercise Control
Exercise Control
Exercise Control
Exercise Control
C4I Adapter
C4I Adapter
SCISCI
AARAAR
Collector
Collector
AARAAR
Collector
Collector
Workstations
Workstations
Workstations
Workstations
Low NetworkLow NetworkJSIMS FOM-LowJSIMS FOM-Low JSIMS FOM-HighJSIMS FOM-High
High NetworkHigh Network
C4I Adapter
C4I Adapter
Secret
Secret
C4I Adapter
C4I Adapter
Secret
Secret
8/4/00
12
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
PEO assessment
• Program is executable for Mar 02 version release if:
– FY 01 Joint Staff UFR of $18.2M is resolved
– Services / Agencies commit to fully funding their requirements
– OSD protects Service / Agency programs from programmaticcuts, withholds, taxes, etc.
– All partners deliver their software components on time
8/4/00
13
Briefing - Ind Days (24 May 00) - Draft
UNCLASSIFIED
UNCLASSIFIED
Discussion
Discussion
top related