khaled ahmed_civil engineer _cv
Post on 08-Aug-2015
36 Views
Preview:
TRANSCRIPT
1
KHALED AHMED ABDELFATAH ELMETWALI Riyadh-Saudi Arabia Tel: KSA 00966542129300 Egypt 0020507310265
E-MAIL: eng_khaled26@yahoo.com
Civil Engineer BSC (2005)
CAREER PLANS AND OBJECTIVES
- To work in a constructive, productive, organized and dynamic environment so as to
consummate my objectives, and enhance my educational background and skills.
QUALIFICATION
2005 Bachelor Degree in civil engineering, Faculty of engineering,
Mansoura University. Egypt.
- Final Project: Construction Projects, sanitary engineering.
- Project grade: Excellent.
WORK EXPERIENCE
CURRENT WORK:
Employer: Saudi Bin Ladin Group, Haramain Gate CO. (Riyadh, Saudi Arabia)
Project: DAMAC Twin Residential Towers (Riyadh, Saudi Arabia).
Project Duration: From October 2013 till now.
Project Overview: The project involves construction of twin towers; Tower A (Damac Esclusiva
Apartments) comprising 3 basement levels, a ground floor and 29 additional
Floors offering 100 luxury serviced apartments. While Tower B (Paramount 5
Hotel) consisting of 3 basement levels, a ground floor and 36 additional floors
Offering 215 units.
Job Title: Senior QA/QC Engineer.
Responsibilities: -Preparation of Project Quality Plan (PQP).
-Control of Concrete, sampling and testing of materials in accordance with the
specified standards and as approved in the Inspection test plan.
-Control of site supervision activities provision across the project to deliver
quality installations in accordance with the contract documents.
-Control inspections, submittal reviews and all QA/QC documentations.
-Inspect the on-site and off-site materials to be used in the project,
organize/witness field and laboratory Tests, conducted by third parties on
construction materials to ascertain their compliance with the specification.
-Review the subcontractor’s pre qualifications.
-Maintain a Sample room for approved materials in accordance with the contract.
-Participate in mock up inspections/ stage inspections and ascertain that the work
is executed in accordance with the contract document and approved standards.
Employer: Green Line Interiors Dubai, UAE.
Project: Al Jawharah Tower (Jeddah. Saudi Arabia).
Project Duration: From March to Sept 2013.
Project Overview: project comprises from a 47-storey luxury apartment, three podium levels and
another floor of parking, while it’s Versace-design.
Job Title: Project Engineer.
Responsibilities: -Execute all finishing site works as planned/scheduled.
-Supervise the performance of Finishing Foremen and Laborers
-Ensure timeliness in schedule without disregarding quality
-Maintain a punch list of to-do and accomplished works.
-Perform daily site inspection/inspection of works
-Monitor all finishing works e.g. 0Painting, Gypsum Boards, and ceilings Tiling,
Doors, Windows, Furniture, Carpentry and Masonry Works, Plaster, MEP works
2
- Ensure good finishing quality for all civil and interior works.
-Preparation of Correspondences and Reports (e.g. Accomplishment Report, for
Inspection.
-Report, Punch Listing, Activity Report, Manpower Report, Equipment.
-Report progress, including schedule updates, data and quantities executed.
-Review drawings to implement and coordinate design / shop drawings, and
Transmit data to subordinates.
-Implement construction strategies and methods in coordination with the section
Engineer, and report problems / deviations from design / shop drawings.
-Implement Safety Standards in the Project Site.
-Conduct Performance Evaluation of Finishing Foremen and Laborers.
-Perform other duties and responsibilities as may be assigned from time to time.
From Dec 2009 – Feb 2013. [
Employer: Saudi Diyar Consultant (SDC) Riyadh, Saudi Arabia.
Project #3.: King Abdullah Palace in Rawdhat Khuraim (Riyadh).
Project Duration: From July 2012 to Feb 2013.
Project Overview: project comprises from 6 separate buildings / Main Villa, Reception Bldg., Power
House/ Chiller Yard, STP Bldg., R.O Plant and Mosque.
With Total Built-up area: 140,000 m2.
Job Title: Resident Engineer.
Responsibilities: -Analyze survey reports, maps, drawings, blueprints, aerial photography,
and other topographical or geologic data to plan projects.
-Manage and direct staff members and the construction, operations, or
Maintenance activities at project site.
-Provide technical advice regarding design, construction, or program
modifications and structural repairs to industrial and managerial personnel.
Project #2.: Prince Saud Bin Nayef Palace (Riyadh).
Project Duration: From Feb 2012 to June 2012.
Project Overview: project comprises from 6 separate buildings / Main Villa and five annexes. With
Total Built-up area: 15,066 m2.
Job Title : Acting resident Engineer.
Responsibilities: - Analyze survey reports, maps, drawings, blueprints, aerial photography,
and other topographical or geologic data to plan projects.
- Manage and direct staff members and the construction, operations, or
maintenance activities at project site.
- Provide technical advice regarding design, construction, or program modifications
and structural repairs to industrial and managerial personnel.
Project #1. : King Saud University Endowment (Riyadh).
Project Duration: From Dec 2009 to Jan 2012.
Project Overview: project comprises from 11 separate buildings / towers that includes a convention
center, Mall, offices, 7-star hotel tower of 50 floors, a medical building, a 5-Star
Hotel of 250 Keys, 2 hotel (suites) buildings and five office buildings of different
heights. With Total Built-up area: 680,000 m2.
Job Title: Site Engineer.
Responsibilities: - Carrying out all Structure site inspections.
- Preparing interim reports on quality & progress.
- Review structure shop drawings & material submittals.
- Coordinate between all several activities.
From May 2008 to October 2009.
Employer: Elnouba international Company for Contracting in Egypt.
In Hurghada and Marsa Alam branch.
Project: Oriental Coast project "Las Cabanas" (Marsa alam, Egypt)
3
Project Overview: Comprising of over 300 spacious apartments and 117 beach front villas,
The Las Cabanas development is one of the most popular developments in
Marsa Alam. The development itself covers a total of over 6.5 million
Square meters, and as well as the apartments and detached villas, also
Includes a luxury four star hotel, swimming pools, tennis courts, shops and
A wide range of leisure facilities.
Job Title: Site Engineer
Responsibilities: - Surveying works at site.
- Preparing the program of work and sub-contractors tender for the project.
- leading the team to achieve the activities through time schedule.
- Supervision of various field works and coordination.
- Analyzing the sub-contractor's quotations.
- Supervisory all projects work and coordinate all companies documents.
From Feb 2007 to March 2008.
Employer: (MGD) Engineering - Hafr Albatin, Saudi Arabia.
Project: Municipality of Hafr Albatin.
Job Title: Site Engineer.
Responsibilities: -Supervision engineer for all projects.
-Project Management, proceeding & Planning.
-Analyzing the sub-contractor's quotations.
From October 2005 to Jan 2007.
Employer : ELKODS Engineering Office - Damietta in, Egypt.
Project: Residential buildings and villas.
Job Title: Site Engineer.
Responsibilities: -Supervision engineer for all projects.
-Finishing all administrative works.
-Control with data collection from the site.
-Resources management.
TECHNICAL SKILLS
- Computer Experience: AutoCAD - Primavera - Sap2000 – Microsoft Office
- Languages: - Arabic: Mother Tongue. - English: very good
- PMP in preparation.
PERSONAL DATA
- Date of birth: June 26th, 1982.
- Place of birth: Mansoura, Egypt.
- Nationality: Egyptian.
- Marital status: Married.
- Gender: Male.
- Military status: Finished.
PERSONAL SKILLS
- Good communication and presentation skills.
- Can work under pressure.
- Able to identify, analyze and solve problems.
- Aptitude for computing and design. - Practical and creative. - Able to work without supervision.
- Able to work as part of a team. - Able to accept responsibility.
- Have Saudi drive license.
top related