Long Term Performance Evaluation of Grid Connected
Solar PV Power Plants and Establishment of an Education
cum Training Facility at KPCL !angalore
!y
Karnata"a Power Cor#oration Limited
!angalore
Submitted to
$inistry of %ew and &enewable Energy
Govt' of (ndia %ew )elhi
*ugust+ ,-.-
-
8/13/2019 KPCL Proposal Revised
2/28
$inistry of %ew and &enewable Energy
Proforma for Submission of %ew &/) and Technology )evelo#ment Pro0ects
Part1*2 (nformation at a Glance2
Sl'
%o'
(tem
)etails
(' Pro0ect Title2 Long term Performance Evaluation of three Grid Connectedsolar PV Power Plants of 3 MWp each setup b !PCL andestablishment of a education cum training facilit at !PCL"#angalore
((' Pro0ect ty#e3
Technology *rea
Summary and
4b0ectives2
$olar PV $stems Grid Connected
%& Pro0ect ty#e2 'ield Performance Evaluation
(raining facilit3& Technology *rea2 Solar Photovoltaic
)& Pro0ect Summary2 *nne5ure 1.
*& )efinition of theProblem and Pro0ect
4b0ectives
Grid connected $olar Power generation is a new concept inthecountr& Ver few solar PV power plants have been set upso far& (herefore" it is essential that long term performance ofgrid solar Power plants is documented and analsed tosuggest correlation between the radiation and generation andalso assess the average generation per +Wp capacit of solarpower plant& &Moreover the e,perienced and manpower todesign" set up" manage and maintain the grid connected$olar Power Plants is not available in the countr andtherefore training and education including hands on trainingin th)se aspects is necessar to be imparted" to generatetrained and -ualified manpower& !PCL is the first companin the countr" which has set up two solar power plants of 3MWp capacit each at !olar and #elgaum& (hird plant of 3MWp is under construction at .aichur& !PCL is a leadingpower generation compan in the countr" therefore" fulle-uipped for this purpose&
4b0ectives2Grid connected $olar Power generation is a newconcept in the countr& Ver few plants have been set up sofar& (herefore it is essential that long term performance ofgrid e,port solar Power plants is documented and analsed&Moreover the e,perienced manpower in Grid tie $olarPower Plants is not available in the countr and thereforetraining and education /with hands on training at the Grid0(ieplant1 is necessar to be imparted" to generate trained and-ualified manpower&
-
8/13/2019 KPCL Proposal Revised
3/28
((( Status of 6or" being
done in other
(nstitutions3
(ndustries2
2& Status of 6or" beingdone2
i1 ational
ii1 4nternational
iii1 Patent search.eports
iv1 E,pertise availablewith P45 G.67P54nstitution5 4ndustr
i1 8t present no institution is conducting research oreducation programme on megawatt si9e grid connectedsolar PV power plants in the countr (here is no
reported research so far on long term performanceevaluation of grid connected power plants in 4ndia&(raining facilities regarding megawatt grid connectedsolar PV power plants are also not available in thecountr &
ii1 .esearch on long term performance evaluation is beingdone on grid connected plants in countries li+e :apan"7$8 and German etc& ;owever" a direct correlationwith long term performance for 4ndian plants ma not bepossible&
iii1 ot applicable&
iv1 !PCL is the onl power generating compan in thecountr which has three solar PV power plants of 3MWp each" installed for the
-
8/13/2019 KPCL Proposal Revised
4/28
address" phone" fa," e0mail" website
#angalore0*2@ @@