KY 331 WideningDaviess CountyPL & G Meeting

KY 331 Widening US 60 to Rinaldo Rd.

MP 0.436 to 2.62

KY 331 WideningDaviess CountyPL & G Meeting

Owensboro Riverport Authority BUILD Grant Submittal

July 18, 2018

KY 331 WideningDaviess CountyPL & G Meeting

Owensboro Riverport Authority FASTLANEGrant Submittal

December, 2016

KY 331 WideningDaviess CountyPL & G Meeting

Owensboro Riverport Authority INFRA Grant Submittal

October, 2017

KY 331 WideningDaviess CountyPL & G Meeting

Project Sponsor:Owensboro Riverport AuthorityBrian Wright, President/CEO

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G MeetingIndustries Along Industrial

DriveNumber of Employees

Operational Shifts?

Total Avg Trucks/Day

Owensboro Riverport Authority

43 2 182

Dohl & Groezinger 22 2 20Helena Chemical Co. 16 2 20

Dart 160 3 45Hendrick Screen Co. 48 2 10

Hausner Hard Chrome 100 2 13Averitt 37 2 120Pepsi 45 2 15

Trifecta 29 1 5On Time Fab 15 1 15

Swedish Match 387 3 37Canteen 75 2 38Ken-Tron No data available at the time of this

reportRiver Valley Behavioral

Health150 3 8

EPC 132 1 10Milco National Constructors

7 1 3

Estes No data available at the time of this report

Total = 1266 541

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 Existing Conditions

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 Existing Conditions

• 2 – Lane • Rural Minor Arterial• ADT 4,476 (FY 8,582)

1,568 (FY 2,865)

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 Existing Conditions

• 11’ Lanes• 2 – 35mph horizontal curves• ADT 4,476 (FY 8,582)

1,568 (FY 2,865)• No High Accident locations

KY 331 WideningDaviess CountyPL & G Meeting

Intended Improvements to KY 331 and Rinaldo Road……..

KY 331 WideningDaviess CountyPL & G Meeting

1. Increase lane width to 12’2. Add a Center Turn Lane for

1.3 miles

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

3. Reconstruct 2 curves from a 35mph design speed to a 45 mph design speed.

KY 331 WideningDaviess CountyPL & G Meeting

4. Address mixed-land use.

KY 331 WideningDaviess CountyPL & G Meeting

5. Eliminate 1 vertical curve non-compliant sight distance issue

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

6. Remove utility pole infractions in the clear zone.

KY 331 WideningDaviess CountyPL & G Meeting

7. Address any truck entry issues that may be necessary at individual entrances.

KY 331 WideningDaviess CountyPL & G Meeting

8. Include 2 transit bus stops, complete with pull-offs and shelters

9. Consider sidewalk and/or shared use path for compliment to new transit stops

KY 331 WideningDaviess CountyPL & G Meeting

10. Widen Rinaldo Rd. from KY 331 to rail loadout to a 3-lane roadway.

11.Work with CSX on proper warning devices for existing RR Crossing.

KY 331 WideningDaviess CountyPL & G Meeting

1. .

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

Meeting Goals• Get an update on Environmental Progress• Pick 1 to 2 alternates for Duplex Area• Decide on an alternate in front of Swedish Match stretch• Decide favorite option on treatment of curves• Decide how far to extend center turn lane (.75M or 1.3M)• Decide on favorite option on rural two-lane (equal or west)• Decide on shoulder width of rural section• Shared Use Path – Yes or No• Extent of Sidewalks (take to Old US 60 or stop short)• Discuss Next Steps

KY 331 WideningDaviess CountyPL & G Meeting

Rural CollectorRural / Urban Arterial

Common Geometric Practices

Proposed Typical(Alt 2A)

Number of Lanes 2 2 / 3

Lane Width 12 FT 11 FT / 12FT

Shoulder 8FT / 2 FT Curb & Gutter 8FT (6 FT Paved) & 2 FT Curb & Gutter

Border Area 8-12 FT 4 - 11 FT or

Minimum Radius 371 FT (emax=4%) 587 FT/960 FT (emax=8%) 1025/1290/6500 FT

Maximum Grade 8% / 7% 7.25%

Min. Sight Distance 250 FT / 360 FT /495 FT 300/387/375 FT

Geometric Design Criteria

US 60Rolling Terrain

Posted Speed 55/45/35 MPHADT (2017 / 2038)=9,600 / 12,000

Project Length= 2.179 Miles

KY 331 WideningDaviess CountyPL & G Meeting

BUILD GANTT ACTUAL

Notice of Approval

December 2019

December 2019

MARADnot FHWA

Utility Kickoff 3/1/19 4/1/19-4/15/19 4/8/19

NTP 3/1/19 n/a Pending ORA

PL&G Insp 4/15/19 5/15/19 6/25/19 not KYTC

Public Mtg 6/30/19 7/1/19

Final Insp 10/20/19 8/15/19

NEPA CE Doc. 10/1/19 10/31/19

September 30, 2020 September 30, 2025Under Contract by: Expend Funds by:

KY 331 WideningDaviess CountyPL & G Meeting

Meeting Goals• Get an update on Environmental Progress• Pick 1 to 2 alternates for Duplex Area• Decide on an alternate in front of Swedish Match stretch• Decide favorite option on treatment of curves• Decide how far to extend center turn lane (.75M or 1.3M)• Decide on favorite option on rural two-lane (equal or west)• Decide on shoulder width of rural section• Shared Use Path – Yes or No• Extent of Sidewalks (take to Old US 60 or stop short)• Discuss Next Steps

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

KY 331 WideningDaviess CountyPL & G Meeting

1. Continue EJ Work2. Submit preferred alignments to CSX3. Sign agreement with CSX4. Update utilities as alignment firms up5. Meeting in KYTC CO on R/W before end of July6. Move toward scheduling Public Meeting in

Summer7. Move toward early R/W authorization

Next Steps

KY 331 WideningDaviess CountyPL & G Meeting